Moulded Case Circuit Breakers (MCCB) Conforming To IS/IEC 60947 (Part 2),LED Luminaire For Floodlig
Indian Army
BHOPAL, MADHYA PRADESH
Bid Publish Date
10-Jul-2026, 11:35 am
Bid End Date
20-Jul-2026, 12:00 pm
EMD
₹87,000
Location
Progress
Quantity
1225
Category
LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II)
Bid Type
Two Packet Bid
The Indian Army, Department Of Military Affairs, invites bids for a broad electrical equipment package including Moulded Case Circuit Breakers conforming to IS/IEC 60947 (Part 2), LED luminaires for floodlights and road/Street lights conforming to IS 10322 (Part 5), BIS Scheme II compliance, self-ballasted LED lamps per IS 16102, and related electrical accessories. Estimated value is not disclosed; EMD is ₹87,000. Location: BHOPAL, MADHYA PRADESH 462001. Tender emphasizes ISI/ BIS standards, OEM approvals, and integrated installation/commissioning tasks across 8 items. AGENDA includes wind-down of multiple LED modules, heat shrink terminations for HV cables, and timing-sensitive delivery.
Key differentiators include multiple BIS Scheme II conformances, IS/IEC 60947 (Part 2) compliance, and a mixed catalog of MCCBs, LED fixtures, bells, and smart switches. The procurement scope targets defense-grade electrical equipment with strict standardization, ensuring interoperable performance in military infrastructure.
MCCB conforming to IS/IEC 60947 Part 2 with specified rated current and breaking current
LED luminaires for floodlights and road lighting conforming to IS 10322 Part 5 (Section 5 & Section 3) under BIS Scheme II
Self Ballasted LED Lamps aligned to IS 16102 Part 2 under BIS Scheme II
Electric bells and accessories conforming to IS 2268
LED Batten Light (LED Tube Light) specifications including length and wattage
Heat Shrink Joint Termination Kit for 11 KV, 185 sqmm 3-core and 11 KV, 120 sqmm 3-core
Timer switches with light sensors and three-phase/nature-type switches
Option clause allows ±25% quantity adjustment; delivery timing uses proportional scaling with minimum 30 days.
EMD amount ₹87,000; BIS/ISI/OEM compliance and ISI marked products where specified.
Submission requires government tax registrations and standard bid documents; delivery and warranty terms to be confirmed.
Not detailed in provided data; ATC terms will govern bid payments including any advance/ milestone payments per contract.
Delivery period begins from the last date of original delivery order; extended delivery time applies with calculated formula, minimum 30 days.
Not specified in excerpt; ATC may include LDs for delays per contract terms.
Compliance with IS/IEC 60947 Part 2 and IS 10322 Part 5 BIS Scheme II
Valid OEM authorization for branded items and ISI/BIS certifications where applicable
Demonstrated experience in supplying defense electrical equipment and related installation
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Moulded Case Circuit Breakers (MCCB) Conforming To IS/IEC 60947 (Part 2) (Q2) , LED Luminaire For Floodlight Conforming To IS 10322 (Part 5/Section 5) (V3) (Under BIS Scheme - II) (Q2) , LED Luminaire For Road And Street Lights Conforming To IS 10322 (Part 5/Section 3) (V3) (Under BIS Scheme - II) (Q2) , Self Ballasted LED Lamps (LED Bulb) (V3) Conforming to IS 16102 (Part 2) (Under BIS Scheme - II) (Q2) , Elecric Bells and Accessories as per IS 2268 (Q3) , LED Batten Light (LED Tube Light) (V2) (Q2) , Heat Shrink Joint Termination Kit Straight 185 Sqmm 3 Core 11 KV , Heat Shrink Joint Termination Kit Straight 120 Sqmm 3 core 11 KV , Timer Switch Light Sensor TypeNature Switches Three Phase , Power Contactor 3 pole 110 Amp , Inverter Based LED Bulb 9 Watt , Timer Switch Light Sensor TypeNature Switches Single Phase , LED Tubelight fitting 18 Watt complete , Inverter Based LED Bulb 12 Watt
Advisory Bank
State Bank of India
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Bhopal
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Bhopal | Bhopal | - | - | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
BHOPAL, MADHYA PRADESH
Indian Army
HYDERABAD, TELANGANA
Indian Army
JALPAIGURI, WEST BENGAL
Indian Army
BIKANER, RAJASTHAN
Indian Army
PATIALA, PUNJAB
Tender Results
Loading results...
Heat Shrink Joint Termination Kit Straight 185 Sqmm 3 Core 11 KV
Heat Shrink Joint Termination Kit Straight 185 Sqmm 3 Core 11 KV
Heat Shrink Joint Termination Kit Straight 120 Sqmm 3 core 11 KV
Heat Shrink Joint Termination Kit Straight 120 Sqmm 3 core 11 KV
Timer Switch Light Sensor TypeNature Switches Three Phase
Timer Switch Light Sensor TypeNature Switches Three Phase
Power Contactor 3 pole 110 Amp
Power Contactor 3 pole 110 Amp
Inverter Based LED Bulb 9 Watt
Inverter Based LED Bulb 9 Watt
Timer Switch Light Sensor TypeNature Switches Single Phase
Timer Switch Light Sensor TypeNature Switches Single Phase
LED Tubelight fitting 18 Watt complete
LED Tubelight fitting 18 Watt complete
Inverter Based LED Bulb 12 Watt
Inverter Based LED Bulb 12 Watt
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Heat Shrink Joint Termination Kit Straight 185 Sqmm 3 Core 11 KV | Heat Shrink Joint Termination Kit Straight 185 Sqmm 3 Core 11 KV | 1 | each | dksbso@2005 | 15 | |
| 2 | Heat Shrink Joint Termination Kit Straight 120 Sqmm 3 core 11 KV | Heat Shrink Joint Termination Kit Straight 120 Sqmm 3 core 11 KV | 1 | nos | dksbso@2005 | 15 | |
| 3 | Timer Switch Light Sensor TypeNature Switches Three Phase | Timer Switch Light Sensor TypeNature Switches Three Phase | 2 | nos | dksbso@2005 | 15 | |
| 4 | Power Contactor 3 pole 110 Amp | Power Contactor 3 pole 110 Amp | 2 | nos | dksbso@2005 | 15 | |
| 5 | Inverter Based LED Bulb 9 Watt | Inverter Based LED Bulb 9 Watt | 92 | nos | dksbso@2005 | 15 | |
| 6 | Timer Switch Light Sensor TypeNature Switches Single Phase | Timer Switch Light Sensor TypeNature Switches Single Phase | 2 | nos | dksbso@2005 | 15 | |
| 7 | LED Tubelight fitting 18 Watt complete | LED Tubelight fitting 18 Watt complete | 232 | nos | dksbso@2005 | 15 | |
| 8 | Inverter Based LED Bulb 12 Watt | Inverter Based LED Bulb 12 Watt | 60 | nos | dksbso@2005 | 15 |
| Category | Specification | Requirement |
|---|---|---|
| GENERIC | Rated Current (in Ampere) | 160A |
| GENERIC | Number of Poles | 3 Pole |
| GENERIC | Rated Breaking Current (in KA) | 50 KA |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates of similar supply (defense/electrical equipment preferred)
Financial statements and turn-over evidence
EMD payment proof (₹87,000)
Technical bid documents and bill of quantities
OEM authorization letters for branded items
Certification documents proving IS/IEC 60947 Part 2, IS 10322 compliance, BIS Scheme II where applicable
Key insights about MADHYA PRADESH tender market
Bidders must submit GST, PAN, experience certificates, financial statements, and EMD of ₹87,000. Ensure OEM authorizations and IS/IEC 60947 Part 2, IS 10322 BIS Scheme II compliance. Follow ATC delivery terms and include technical bid with BOQ, and terms of quantity variation up to 25%.
Required documents include GST certificate, PAN, experience certificates, financial statements, EMD proof, technical bid documents, OEM authorizations, and certification proving ISI/BIS Scheme II compliance for LED luminaires and related components.
The purchaser may increase or decrease quantity up to 25% at contract time. Delivery period extends using a formula based on increased quantity, starting from the last date of the original delivery order, with a minimum extension of 30 days.
MCCBs must meet IS/IEC 60947 Part 2; LED luminaires must follow IS 10322 Part 5 (Section 3/5) under BIS Scheme II; ISI/BIS and OEM authorizations are required for conformity.
The EMD amount is ₹87,000 and must be submitted along with the bid as per tender ATC terms; ensure payment method aligns with the bidding portal guidelines.
Eligibility includes compliance with IS/IEC standards, BIS Scheme II certification, OEM authorization for branded items, demonstrated experience in defense electrical equipment, and submission of mandatory financial and tax documents.
Indian Army
📍 SAGAR, MADHYA PRADESH
Indian Army
📍 HYDERABAD, TELANGANA
Indian Army
📍 SONITPUR, ASSAM
Indian Army
📍 PUNE, MAHARASHTRA
Indian Army
📍 SRINAGAR, JAMMU & KASHMIR
Sign up now to access all documents
Main Document
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
CATALOG Specification
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS