Indian Army Cloth Dryer Stand & Door Mats Tender East Sikkim 2026 - Rubber Lining, Dimensional Specifications
Indian Army
EAST SIKKIM, SIKKIM
Bid Publish Date
14-Jun-2026, 1:09 pm
Bid End Date
24-Jun-2026, 2:00 pm
Location
Progress
Quantity
6
Category
CLOTH WASHER MACHINE
Bid Type
Single Packet Bid
The Indian Navy under the Department of Military Affairs invites bids for the procurement of CLOTH DRY STAND and CLOTH WASHER MACHINE. The opportunity references a flexible quantity framework with an optional increase of up to 25% of the bid quantity and potential extension of delivery time within the contract period. Bidders should note that delivery timelines start from the last date of the original delivery order, with calculations for extended delivery time based on the formula: (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days. Acknowledgement of ATC terms is required.
Product names: CLOTH DRY STAND, CLOTH WASHER MACHINE
Estimated value: Not disclosed
EMD amount: Not disclosed in tender data
Experience: Prior supply of similar equipment recommended
Standards: To be specified in bid with IS/ISO references by bidder
Delivery: Based on original delivery order; extended delivery per option clause
25% quantity variation allowed during contract term
Delivery period extends with option clause using calculated formula
Must review and comply with ATC document uploaded by buyer
No BOQ items; bidders must provide precise model numbers and technical specs
Not specified in data; verify with procurement portal and ATC
Delivery commencement from last date of original delivery order; extended period as per formula with minimum 30 days
Not specified in data; confirm through ATC
Eligibility criteria not fully disclosed; bid submission should demonstrate capacity to supply CLOTH DRY STAND and CLOTH WASHER MACHINE
Compliance with ATC and any IS/ISO standards as per bid
Financial stability evidenced by audited statements and GST/PAN validity
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
CLOTH DRY STAND , CLOTH WASHER MACHINE
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
EAST SIKKIM, SIKKIM
Indian Army
AMRITSAR, PUNJAB
Indian Army
JAIPUR, RAJASTHAN
Indian Army
SONITPUR, ASSAM
Indian Army
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates (similar supply of cloth processing equipment or related items)
Financial statements (audited or statutory)
EMD/Security deposit details (as advised in ATC)
Technical bid documents and product specifications
OEM authorizations or dealership certificates (if applicable)
Bidders must submit GST registration, PAN, experience certificates, financial statements, EMD details, technical specifications, and OEM authorizations via the procurement portal. Review the ATC for compliance and confirm model numbers, warranty terms, and installation requirements before submission.
Required documents include GST certificate, PAN, experience certificates for similar equipment, audited financials, EMD details, technical bid and OEM authorizations. ATC may specify additional installation or testing requirements; ensure compliance before bid submission.
Delivery periods can extend when the option clause is exercised, using formula: (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days. Original delivery dates remain the reference for calculating extended timelines.
Bids should specify IS/ISO standards applicable to cloth washing machines and drying stands. Include model numbers, performance specs, warranty terms, and any BIS or equivalent certifications as required by the ATC.
EMD details are not disclosed in the basic data; bidders must consult the ATC and procurement portal for exact EMD amount, payment mode, and validity period before submission.
Delivery timing depends on the original delivery order date; extended delivery is calculated per the option clause formula, with a minimum extension of 30 days if applicable. Confirm final timelines in the contract and ATC.
Submit OEM authorization or dealership certificates proving authority to supply CLOTH DRY STAND and CLOTH WASHER MACHINE models. Ensure the authorization covers the proposed model numbers and warranty support.
Border Security Force (bsf)
📍 GURDASPUR, PUNJAB
Indian Army
📍 EAST SIKKIM, SIKKIM
Indian Army
📍 UDHAMPUR, JAMMU & KASHMIR
Civil Secretariat
📍 SRINAGAR, JAMMU & KASHMIR
Indian Army
📍 BARAMULLA, JAMMU & KASHMIR
Sign up now to access all documents
Main Document
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS