Indian Army Cable XLPE HD AL Conductor & Electrical Equipment Tender 2025 Delhi Cantt - 3% ePBG, ₹2.82 Lakh EMD, OEM Auth
Indian Army
WEST DELHI, DELHI
Bid Publish Date
03-Jan-2026, 2:54 pm
Bid End Date
19-Jan-2026, 5:00 pm
Location
Progress
Quantity
1
Bid Type
Two Packet Bid
Bharat Heavy Electricals Limited (BHEL), a flagship of the Department of Heavy Industry, seeks supply, installation, testing and commissioning (SITC) of a 1000KVA Compact Substation of 11KV/415 Volts. The order is targeted for delivery within 120 days from purchase order date, with E&C efforts included. The project is anchored at BHEL Haridwar and requires a 10% security-backed E&C Payment via a Performance Bank Guarantee (PBG) for warranty + 90 days claim window. The scope covers both supply and on-site commissioning, with E&C value estimated at 5% of total material cost. The GEM portal price shall cover complete scope; penalties apply for delays.
Key differentiators include explicit E&C period (20 days post-intimation), and milestone-based disbursement linked to E&C certificate. This procurement targets bidders capable of end-to-end SITC of 1000KVA substations under Indian standards for public-sector buyers. Unique aspects include vendor code creation documentation and separate E&C valuation, with pre-approval terms for MSE/Non-MSE payment timelines.
1000KVA Compact Substation
11KV/415V configuration
Material Code AA372021500
Delivery: 120 days from PO
E&C: 5% of total material cost; 20 days implementation window
PBG: 10% of total PO value; validity 15 months
LD: 0.5% per week, max 10% of PO value
All-inclusive GeM pricing for supply, installation, testing and commissioning
Delivery within 120 days; E&C within 20 days after intimation
Payment: 80/60/90 days by entity type; 20% + E&C on PBG
PBG of 10% of PO value; LDs up to 10% of PO value
80% within 45 days for MSE, 60 days for Medium Enterprises, 90 days for Non-MSE; remaining 20% plus E&C value paid after E&C certificate with 15-month PBG
Delivery within 120 days from Purchase Order date; E&C completion within 20 days of first site intimation
0.5% per week for supply delay; max 10% of total PO value; separate LDs for E&C delays
Experience in SITC of electrical substations or similar high-power equipment
Financial stability demonstrated via financial statements
GST registration and PAN compliance; bank EFT mandate
Compliance with E&M or IS standards for substations (where specified)
Indian Army
WEST DELHI, DELHI
Indian Army
JAMMU, JAMMU & KASHMIR
Bharat Petroleum Corporation Ltd
MUMBAI, MAHARASHTRA
Nlc India Limited
CHENNAI, TAMIL NADU
Indian Army
WEST DELHI, DELHI
Tender Results
Loading results...
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN copy
Cancelled cheque
EFT Mandate copy certified by bank
Technical bid documents
OEM authorization (if applicable)
Experience certificates (related SITC of substations)
Financial statements (as required by bid terms)
Key insights about UTTARAKHAND tender market
Bidders must complete vendor code creation and submit PAN, GST, cancelled cheque, and EFT mandate with bank certification. Include SITC scope (Supply, Installation, Testing & Commissioning) and ensure PBG of 10% of PO value; E&C valued at ~5% must be separately quoted.
MSE bidders receive 80% payment within 45 days; Medium Enterprises get 60 days; Non-MSE enjoy 90 days from material receipt at BHEL Haridwar. Remaining 20% plus E&C value paid after E&C certificate and 15-month PBG.
Delivery must occur within 120 days from the Purchase Order date. E&C activities add up to 20 days after first site intimation, forming the complete SITC window.
Mandatory documents include PAN, GSTIN, cancelled cheque, EFT mandate with bank certification, technical bid, OEM authorizations if applicable, and relevant experience certificates for SITC of substations.
Delay LDs apply separately to supply and E&C; rate is 0.5% per week of total PO value, capped at 10% of the PO value; timely readiness is defined from vendor intimation date.
E&C value is estimated at 5% of total material cost; to be quoted separately. Payment for E&C and supply is released after respective certification and PBG submission, ensuring site readiness.
A Performance Bank Guarantee of 10% of total PO value is required, valid for the warranty period plus 90 days; used to secure E&C performance and warranty claims.
SITC occurs at BHEL Haridwar; scope includes supply, installation, testing, commissioning, and operator training, with the GeM price inclusive of all services.
Yantra India Limited
📍 NAGPUR, MAHARASHTRA
Armoured Vehicles Nigam Limited
📍 MEDAK, TELANGANA
Bharat Coking Coal Limited
📍 DHANBAD, JHARKHAND
Sign up now to access all documents
Main Document
TECHNICAL
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
ATC
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS