Uttar Pradesh Cooperative Sugar Factories Federation Limited Facility Management Services Tender Kheri Uttar Pradesh 25% Scope Variation 2026
N/a
KHERI, UTTAR PRADESH
Bid Publish Date
10-Jul-2026, 6:47 pm
Bid End Date
20-Jul-2026, 7:00 pm
Value
₹3,50,000
Location
Progress
Quantity
1
Bid Type
Two Packet Bid
The procurement is issued by the Uttar Pradesh Cooperative Sugar Factories Federation Limited for Facility Management Services on a Lump Sum basis at KHERI, UTTAR PRADESH 261501. Estimated value is ₹350,000.00 with consumables to be supplied by the buyer. The scope includes industrial facility management under a lump-sum contract, with flexibility to adjust scope up to 25% as per buyer terms. A DD-based security option is available in addition to PBG, payable to Kisan Sahkari Chini Mills Ltd., Sampurna Nagar-Kheri. This tender requires bidders to align with GeM ATC and submit applicable security deposits post-award. Unique aspect: no BOQ items published; scope is defined by lump-sum service delivery and potential scope expansion within the 25% limit.
Key Term 1: 25% scope/quantity/duration flex allowed at tender issuance and post-award with consent
Key Term 2: DD-based security option in addition to PBG; DD payable to Kisan Sahkari Chini Mills Ltd.
Key Term 3: Consumables to be supplied by buyer; lump-sum service contract without BOQ items
Security can be provided as DD in favor of Kisan Sahkari Chini Mills Ltd.; DD copy to be uploaded within 15 days of award; hard copy to the buyer within 15 days
Contract duration may be adjusted up to 25%; no explicit monthly delivery dates published; adherence to lump-sum delivery milestones as per scope
Not specified in available data; bidders should infer standard GeM penalties applicable to lump-sum facility management services
Eligibility for facility management services in industrial settings
Demonstrated experience in lump-sum FM contracts (if specified by buyer ATC)
Compliance with GeM ATC terms and ability to submit DD security in lieu of PBG
Tender Category
Service
Bid To RA
No
Bid To RA Enabled
No
Item Category
Facility Management Services - LumpSum Based - Industrial; As per Scope of Work; Consumables to be provided by buyer
Advisory Bank
State Bank of India
ePBG Percentage
2%
ePBG Duration (Months)
12
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of service delivery acceptance certificate (SDAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Delivery Locations
1
Delivery Cities
Kheri
Delivery Pincodes
262904
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Satya Prakash Singh | 262904,Kishan Sahkari Chini Mills Limited Sampurna Nagar Pin -262904 GST number- 09AAAAK1131D1ZA Contact Number -6389025196, 7880888990 | Kheri | Uttar Pradesh | 262904 | Project / Lumpsum Based | - | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
GEM_GENERAL_TERMS_AND_CONDITIONS
N/a
KHERI, UTTAR PRADESH
Ratnagiri Gas And Power Private Limited
RATNAGIRI, MAHARASHTRA
Rashtriya Chemicals And Fertilizers Limited (rcf)
MUMBAI, MAHARASHTRA
Rashtriya Chemicals And Fertilizers Limited (rcf)
MUMBAI, MAHARASHTRA
Rashtriya Chemicals And Fertilizers Limited (rcf)
MUMBAI, MAHARASHTRA
Tender Results
Loading results...
Discover companies most likely to bid on this tender
Experience Criteria
Bidder Turnover
Certificate (Requested in ATC)
Additional Doc 1 (Requested in ATC)
Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Key insights about UTTAR PRADESH tender market
Bidders must submit GeM-compliant documents, pay the EMD or provide an acceptable DD, and upload a DD copy within 15 days of award. Ensure the lump-sum FM scope aligns with the buyer’s consumable policy and 25% scope flexibility. Follow ATC terms during bid submission.
Prepare GST registration, PAN, experience certificates in industrial FM, financial statements, and technical bid documents; include OEM authorizations if applicable, and evidence of security deposit (DD) in favor of Kisan Sahkari Chini Mills Ltd with 15-day submission window after award.
Bid security may be provided as a Demand Draft in favor of Kisan Sahkari Chini Mills Ltd.; after award, upload scanned DD copy within 15 days and send the hard copy to Sampurna Nagar-Kheri address to finalize Security.
The buyer may increase contract quantity or duration by up to 25% at the time of issue and post-award, with the service provider’s consent. This applies to lump-sum FM services and may affect total contract value.
No; consumables are to be provided by the buyer. Bidders must price the lump-sum service excluding consumables, and ensure service levels match the scope while consumables are supplied by the purchaser.
Payment terms align with GeM/GTC; security deposit via DD is acceptable; post-award, ensure delivery of the DD hard copy within 15 days and adhere to milestone payments as defined by the lump-sum contract.
Specific calendar milestones are not published; bidders should prepare a phased deployment plan aligning with the lump-sum scope, ensuring service readiness within contract start upon award and compliance with ADP terms.
No explicit standards are listed in the data; bidders should demonstrate FM capability, regulatory compliance, and GeM ATC alignment. If applicable, provide certifications related to industrial service management and safety.
N/a
📍 KHERI, UTTAR PRADESH
N/a
📍 KHERI, UTTAR PRADESH
N/a
📍 KHERI, UTTAR PRADESH
N/a
📍 KHERI, UTTAR PRADESH
N/a
📍 KHERI, UTTAR PRADESH
Sign up now to access all documents
Main Document
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
GEM_GENERAL_TERMS_AND_CONDITIONS