Rashtriya Chemicals And Fertilizers Limited Repair & Replacement of Refractory Lining Suphala Plant Trombay Mumbai MAHARASHTRA 2026

Bid Publish Date

17-Feb-2026, 5:14 pm

Bid End Date

10-Mar-2026, 6:00 pm

Progress

Issue17-Feb-2026, 5:14 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

1

Bid Type

Two Packet Bid

Categories 10

Tender Overview

Rashtriya Chemicals And Fertilizers Limited (RCF), Department Of Fertilizers, invites bids for the repair, maintenance and installation work related to the replacement of refractory lining along with material inside the furnace at Suphala plant, Trombay Unit, Mumbai, Maharashtra. Estimated contract value not disclosed; scope includes refractory lining replacement and internal furnace works under a defined SOW. Key differentiators include a flexible quantity/duration option (up to ±25%), performance-based LD structures, and a 5% security deposit. The award will be governed by NIT terms and HSE requirements aligned to the project. This procurement targets qualified fabricators/thermal repair specialists with plant-level execution capabilities in a Mumbai-based refinery setting.

Technical Specifications & Requirements

  • No explicit product specs listed in the tender data; LOI references repair and installation of refractory lining inside a furnace at Suphala plant, Trombay Unit, Mumbai.
  • Critical financial terms include a 5% Security Deposit (SD) of the basic contract value, payable within 14 days after WO issue; SD/PBG return upon fulfillment.
  • Liquidated damages apply: 0.5% of contract value per week for delays, max 5% (with higher LD if contract allows) and up to 10% for extreme delays beyond 25% of completion period.
  • Payment terms: 100% payment on 30th day from receipt of invoice after successful completion and submission of required documents.
  • Bank Guarantee: Rs 500 non-judicial stamp in RCF format; BG valid for 24 months WO validity + 12 months warranty + 60 days.
  • Variation clause: Commercial option clause allows ±25% change in contract quantity or duration at issue of contract, and post-issue adjustments limited to 25%.
  • HSE compliance and other ATC terms apply as per NIT.

Terms, Conditions & Eligibility

  • EMD: Not explicitly stated; SD at 5% of basic contract value to be provided within 14 days of WO issue.
  • Delivery/Completion: Completion within the stipulated period; LD levied for delays as described (0.5% per week, max 5-10%).
  • Payment: 100% payment on 30th day after submission of invoice and documents; corrected invoices also cleared on 30th day from resubmission.
  • Documentation: Bank guarantee on Rs 500/- stamp paper; WOs contain warranty/AMC terms; SD refundable on full contractual completion.
  • Eligibility: Experience in furnace refractory repair/installation preferred; adherence to HSE and NIT terms; OEM authorizations not explicitly listed but likely required by ATC.
  • Penalties: LD for delays; maximum stipulated above; security deposit remains until contractual obligations and warranty completion.
  • Misc: No BOQ items; contract quantity duration adjustment possible by 25% under option clause.

Key Specifications

  • Product/Service: Repair, Maintenance & Installation of refractory lining inside furnace at Suphala plant, Trombay Unit, Mumbai

  • Quantity/Value: Not disclosed; scope limited to furnace refractory replacement as per SOW

  • Standards/Certification: Not specified in tender; ATC references HSE compliance per NIT

  • Delivery/Installation: Within the stipulated contract period with LD provisions

  • Warranty/Support: 12 months warranty implied with BG validity; explicit warranty terms not enumerated

Terms & Conditions

  • Emergency variation allowed: ±25% change in quantity or duration during contract issuance

  • SD of 5% of basic contract value due within 14 days of Work Order

  • LD: 0.5% of contract value per week delay; max 5% (or 10% for extended delays)

  • Payment: 100% on 30th day after invoice submission and documents

  • BG: Rs 500 stamp paper, valid 24 months WO + 12 months warranty + 60 days

  • HSE and ATC compliance per NIT terms; not all documents clearly defined

Important Clauses

Payment Terms

100% payment on the 30th day from receipt of invoice post verification and submission of required documents; corrected invoices processed similarly within 30 days of resubmission.

Delivery Schedule

Completion within stipulated period with LD for delays at 0.5% per week; maximum 5% (10% in case of severe delay); performance governed by SOW.

Penalties/Liquidated Damages

LD at 0.5% weekly; cap at 5% of contract value; higher LD applies if specified; excess delays may trigger 10% LD for inordinate delays.

Bidder Eligibility

  • Experience in furnace refractory repair/installation projects

  • Compliance with HSE requirements per NIT

  • Ability to provide 5% SD and 100% payment on invoice as per contract terms

Documents 6

GeM-Bidding-9001370.pdf

Main Document

Other Documents

OTHER

Scope Of Work Document

SCOPE_OF_WORK

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - Manufacturing Unit

Rashtriya Chemicals And Fertilizers Limited (rcf)

MUMBAI, MAHARASHTRA

Posted: 18 September 2025
Closed: 9 October 2025
GEM

Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - Manufacturing Unit

Rashtriya Chemicals And Fertilizers Limited (rcf)

Posted: 6 November 2024
Closed: 13 November 2024
GEM

Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - Manufacturing Unit

Rashtriya Chemicals And Fertilizers Limited (rcf)

Posted: 9 November 2024
Closed: 30 November 2024
GEM

Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - Manufacturing Unit

Rashtriya Chemicals And Fertilizers Limited (rcf)

MUMBAI, MAHARASHTRA

Posted: 7 April 2025
Closed: 28 April 2025
GEM

Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - Manufacturing Unit

Rashtriya Chemicals And Fertilizers Limited (rcf)

Posted: 5 November 2024
Closed: 26 November 2024
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates for similar furnace refractory repair/installation projects

4

Financial statements for the last 2-3 years

5

EMD/Security deposit submission proof (if applicable)

6

Technical bid documents and method statement

7

OEM authorizations or approvals (if required by NIT/ATC)

Frequently Asked Questions

Key insights about MAHARASHTRA tender market

How to bid on the Mumbai furnace refractory tender in 2026?

Bidders must submit GST, PAN, experience certificates, financial statements, EMD documents, technical bid, and OEM authorizations if required. Ensure SD of 5% of basic contract value and readiness to meet 0.5% weekly LD up to 5-10% on delays. Follow NIT and ATC terms, with HSE compliance.

What are the essential documents for the Suphala plant repair tender Mumbai?

Submit GST registration, PAN card, prior experience certificates for furnace refractory work, financial statements for last 2-3 years, EMD/SD proof, technical bid and method statement, and OEM authorizations if mandated. Ensure BG is provided on Rs 500 stamp paper if requested.

What is the LD policy for delays in the Mumbai project?

Late completion incurs LD at 0.5% of contract value per week or part thereof, capped at 5% of contract value; inordinate delays beyond 25% may incur up to 10% LD, as per contract terms and SOW.

What constitutes the Security Deposit requirements for this tender?

A 5% SD of the basic contract value must be deposited within 14 days of Work Order issuance, via bank guarantee or DD/ECS as per RCF format; SD/PBG released after full contractual obligations including warranty are complete.

What are the payment terms after completing the Mumbai furnace work?

100% payment is released on the 30th day after receipt of the invoice and all required documents; corrected invoices are processed within 30 days of resubmission.

Are there any variation allowances for contract quantity in this tender?

Yes, an option clause allows ±25% change in contract quantity or duration at contract issue; after issuance, adjustments remain within a 25% limit as per contract terms.

What delivery/installation standards apply to the Suphala plant scope?

HSE requirements per NIT apply; no explicit IS/ISO standard specified in the tender data; ensure compliance with site-specific safety and installation guidelines during furnace refractory work at Trombay.

What is the required BG format and validity for this tender?

BG must be on Rs 500 non-judicial stamp paper in RCF format from approved banks; validity covers 24 months WO, 12 months warranty, plus 60 days beyond, until contractual obligations are fulfilled.