Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - Manufacturing Unit
Rashtriya Chemicals And Fertilizers Limited (rcf)
MUMBAI, MAHARASHTRA
Bid Publish Date
17-Feb-2026, 5:14 pm
Bid End Date
10-Mar-2026, 6:00 pm
Location
Progress
Quantity
1
Bid Type
Two Packet Bid
Rashtriya Chemicals And Fertilizers Limited (RCF), Department Of Fertilizers, invites bids for the repair, maintenance and installation work related to the replacement of refractory lining along with material inside the furnace at Suphala plant, Trombay Unit, Mumbai, Maharashtra. Estimated contract value not disclosed; scope includes refractory lining replacement and internal furnace works under a defined SOW. Key differentiators include a flexible quantity/duration option (up to ±25%), performance-based LD structures, and a 5% security deposit. The award will be governed by NIT terms and HSE requirements aligned to the project. This procurement targets qualified fabricators/thermal repair specialists with plant-level execution capabilities in a Mumbai-based refinery setting.
Product/Service: Repair, Maintenance & Installation of refractory lining inside furnace at Suphala plant, Trombay Unit, Mumbai
Quantity/Value: Not disclosed; scope limited to furnace refractory replacement as per SOW
Standards/Certification: Not specified in tender; ATC references HSE compliance per NIT
Delivery/Installation: Within the stipulated contract period with LD provisions
Warranty/Support: 12 months warranty implied with BG validity; explicit warranty terms not enumerated
Emergency variation allowed: ±25% change in quantity or duration during contract issuance
SD of 5% of basic contract value due within 14 days of Work Order
LD: 0.5% of contract value per week delay; max 5% (or 10% for extended delays)
Payment: 100% on 30th day after invoice submission and documents
BG: Rs 500 stamp paper, valid 24 months WO + 12 months warranty + 60 days
HSE and ATC compliance per NIT terms; not all documents clearly defined
100% payment on the 30th day from receipt of invoice post verification and submission of required documents; corrected invoices processed similarly within 30 days of resubmission.
Completion within stipulated period with LD for delays at 0.5% per week; maximum 5% (10% in case of severe delay); performance governed by SOW.
LD at 0.5% weekly; cap at 5% of contract value; higher LD applies if specified; excess delays may trigger 10% LD for inordinate delays.
Experience in furnace refractory repair/installation projects
Compliance with HSE requirements per NIT
Ability to provide 5% SD and 100% payment on invoice as per contract terms
Main Document
OTHER
SCOPE_OF_WORK
GEM_GENERAL_TERMS_AND_CONDITIONS
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Rashtriya Chemicals And Fertilizers Limited (rcf)
MUMBAI, MAHARASHTRA
Rashtriya Chemicals And Fertilizers Limited (rcf)
Rashtriya Chemicals And Fertilizers Limited (rcf)
Rashtriya Chemicals And Fertilizers Limited (rcf)
MUMBAI, MAHARASHTRA
Rashtriya Chemicals And Fertilizers Limited (rcf)
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates for similar furnace refractory repair/installation projects
Financial statements for the last 2-3 years
EMD/Security deposit submission proof (if applicable)
Technical bid documents and method statement
OEM authorizations or approvals (if required by NIT/ATC)
Key insights about MAHARASHTRA tender market
Bidders must submit GST, PAN, experience certificates, financial statements, EMD documents, technical bid, and OEM authorizations if required. Ensure SD of 5% of basic contract value and readiness to meet 0.5% weekly LD up to 5-10% on delays. Follow NIT and ATC terms, with HSE compliance.
Submit GST registration, PAN card, prior experience certificates for furnace refractory work, financial statements for last 2-3 years, EMD/SD proof, technical bid and method statement, and OEM authorizations if mandated. Ensure BG is provided on Rs 500 stamp paper if requested.
Late completion incurs LD at 0.5% of contract value per week or part thereof, capped at 5% of contract value; inordinate delays beyond 25% may incur up to 10% LD, as per contract terms and SOW.
A 5% SD of the basic contract value must be deposited within 14 days of Work Order issuance, via bank guarantee or DD/ECS as per RCF format; SD/PBG released after full contractual obligations including warranty are complete.
100% payment is released on the 30th day after receipt of the invoice and all required documents; corrected invoices are processed within 30 days of resubmission.
Yes, an option clause allows ±25% change in contract quantity or duration at contract issue; after issuance, adjustments remain within a 25% limit as per contract terms.
HSE requirements per NIT apply; no explicit IS/ISO standard specified in the tender data; ensure compliance with site-specific safety and installation guidelines during furnace refractory work at Trombay.
BG must be on Rs 500 non-judicial stamp paper in RCF format from approved banks; validity covers 24 months WO, 12 months warranty, plus 60 days beyond, until contractual obligations are fulfilled.
Sign up now to access all documents
Main Document
OTHER
SCOPE_OF_WORK
GEM_GENERAL_TERMS_AND_CONDITIONS
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS