D link I O Box,Patch Cord OFC one and half Mtr,OFC Cable four Core,Cat six Cable,Cat six Patch Cord
Indian Army
Progress
Quantity
1016
Category
PV-DG plus Data Logger
Bid Type
Two Packet Bid
Organization: Hindustan Petroleum Corporation Ltd (HPCL) – Bokaro, Jharkhand 825102. Procurement category includes PV-DG plus Data Logger, Log Slave, IP67 Enclosure, LIU box 6 Port, Network Switch 5 Port, Media Converter, OFC Fiber Patch Cord (Single Mode), OFC Cable and Cabling, Transportation, Log Portal. Estimated value: ₹284,500. Quantity scope is potentially scalable by up to 25% during contract placement and again up to 25% during contract execution at contracted rates. No start/end dates provided. The BOQ lists 10 items with non-disclosed quantities, indicating a multi-item cabling and data-logging hardware package. The tender emphasizes delivery-time flexibilities tied to option clauses and extended periods. Unique aspect: integrated hardware suite spanning data logging, telecom cabling, and field enclosures under one procurement.
Product/service names and categories: PV-DG plus Data Logger, Log Slave, IP67 Enclosure, LIU box 6 Port, Network Switch 5 Port, Media Converter, OFC Fiber Patch Cord Single Mode, OFC CABLE AND CABLING
Quantities/values: Estimated value ₹284,500; exact BOQ quantities not disclosed
EMD/Value: Not disclosed in data; verify in ATC
Experience requirements: Not specified; check ATC
Standards/Compliance: Not specified in provided data; confirm IS/IEC/IS standards in ATC
Option clause allows ±25% quantity variation at contract award and during currency
Delivery period depends on original schedule; newly arrived quantity requires minimum 30 days extension
EMD and detailed submission requirements are to be confirmed via the ATC and portal
Payment terms are not specified in the provided data; verify in ATC and contract documents
Delivery period starts from the last date of original delivery order; extended time calculated per option clause with minimum 30 days
No LD details provided; verify in ATC and contract documents
Demonstrated experience supplying similar security/data logging hardware or bundled telecom gear
Compliance with GST and valid PAN
Financial stability demonstrated by financial statements
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
PV-DG plus Data Logger , Log Slave , IP 67 Enclosure , LIU box 6 Port , Network Switch 5 Port , Media Convertor , OFC Fiber Patch Cord Single Mode , Transportation , Log Portal , OFC CABLE AND CABLING
Advisory Bank
ICICI
ePBG Percentage
5%
ePBG Duration (Months)
15
Payment Timelines
Payments shall be made to the Seller within 15 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
42
Delivery Locations
1
Delivery Cities
Bokaro
Delivery Pincodes
827014
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Umesh Kumar Singh | 827014,HPCL BOKARO DEPOT, Plot no.-4, A/8 Biada Industrial Area, Balidih Bokaro - 827014 | Bokaro | Jharkhand | 827014 | 1 | 42 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
National Institute Of Technology (nit)
KOZHIKODE, KERALA
Indian Army
N/a
RAISEN, MADHYA PRADESH
N/a
IMPHAL WEST, MANIPUR
Tender Results
Loading results...
PV-DG plus Data Logger
Supply, installation, testing and commissioning of a PV-DG Synchronization System with Data Logger.
Log Slave
Supply, installation, testing and commissioning of an industrial-grade Logger Slave Unit (Log Slave) for acquisition, processing and transmission of operational data from the existing 225 kWp Solar PV Plant with Diesel Generator Synchronization System, energy meters and associated field devices
IP 67 Enclosure
Supply, installation, testing and commissioning of IP67-rated outdoor electrical enclosure suitable for housing Data Logger, Logger Slave, PLC, communication equipment, networking devices, power supplies, interface modules and associated electrical/control components for the PV-DG Synchronization System
LIU box 6 Port
Supply, installation, testing and commissioning of 6-Port Fiber Optic Light Interface Unit (LIU) complete with fiber management accessories for termination, splicing, protection and distribution of optical fiber cables for the PV-DG Synchronization System, Data Logger and communication network.
Network Switch 5 Port
Design, supply, installation, testing and commissioning of an Industrial 5-Port Unmanaged Ethernet Network Switch for communication between the PV-DG Synchronization System, Solar Data Logger, Logger Slave, PLC, SCADA, Energy Management System (EMS), Generator Controller, and other intelligent electronic devices (IEDs).
Media Convertor
S&I of Industrial Ethernet Media Converter for conversion of Ethernet (Copper) communication to Optical Fiber communication and vice versa, for integration of the PV-DG Synchronization System, Solar PV Monitoring System, Data Logger, Logger Slave along with other Intelligent Electronic Devices (IEDs).
OFC Fiber Patch Cord Single Mode
S&I of Single Mode Optical Fiber (OFC) Patch Cord for interconnection of Fiber Optic LIU, Media Converter, Network Switch, Data Logger, PLC, DG Synchronization Panel, Solar Monitoring System and associated communication equipment.
Transportation
Transportation of goods
Log Portal
Web-Based Log Portal (Central Monitoring & Data Management Platform) for real-time monitoring, logging, analysis, visualization and reporting of the integrated 225 kWp Solar PV Plant with Diesel Generator Synchronization System, and associated electrical and communication systems.
OFC CABLE AND CABLING
SUPPLY/INSTALLATION OF OFC 6 CORE ARMORED SINGLE MODE CABLE
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | PV-DG plus Data Logger | Supply, installation, testing and commissioning of a PV-DG Synchronization System with Data Logger. | 1 | eac | renukumari1 | 42 | |
| 2 | Log Slave | Supply, installation, testing and commissioning of an industrial-grade Logger Slave Unit (Log Slave) for acquisition, processing and transmission of operational data from the existing 225 kWp Solar PV Plant with Diesel Generator Synchronization System, energy meters and associated field devices | 1 | eac | renukumari1 | 42 | |
| 3 | IP 67 Enclosure | Supply, installation, testing and commissioning of IP67-rated outdoor electrical enclosure suitable for housing Data Logger, Logger Slave, PLC, communication equipment, networking devices, power supplies, interface modules and associated electrical/control components for the PV-DG Synchronization System | 2 | eac | renukumari1 | 42 | |
| 4 | LIU box 6 Port | Supply, installation, testing and commissioning of 6-Port Fiber Optic Light Interface Unit (LIU) complete with fiber management accessories for termination, splicing, protection and distribution of optical fiber cables for the PV-DG Synchronization System, Data Logger and communication network. | 2 | eac | renukumari1 | 42 | |
| 5 | Network Switch 5 Port | Design, supply, installation, testing and commissioning of an Industrial 5-Port Unmanaged Ethernet Network Switch for communication between the PV-DG Synchronization System, Solar Data Logger, Logger Slave, PLC, SCADA, Energy Management System (EMS), Generator Controller, and other intelligent electronic devices (IEDs). | 2 | eac | renukumari1 | 42 | |
| 6 | Media Convertor | S&I of Industrial Ethernet Media Converter for conversion of Ethernet (Copper) communication to Optical Fiber communication and vice versa, for integration of the PV-DG Synchronization System, Solar PV Monitoring System, Data Logger, Logger Slave along with other Intelligent Electronic Devices (IEDs). | 2 | eac | renukumari1 | 42 | |
| 7 | OFC Fiber Patch Cord Single Mode | S&I of Single Mode Optical Fiber (OFC) Patch Cord for interconnection of Fiber Optic LIU, Media Converter, Network Switch, Data Logger, PLC, DG Synchronization Panel, Solar Monitoring System and associated communication equipment. | 4 | eac | renukumari1 | 42 | |
| 8 | Transportation | Transportation of goods | 1 | lump sum | renukumari1 | 42 | |
| 9 | Log Portal | Web-Based Log Portal (Central Monitoring & Data Management Platform) for real-time monitoring, logging, analysis, visualization and reporting of the integrated 225 kWp Solar PV Plant with Diesel Generator Synchronization System, and associated electrical and communication systems. | 1 | year | renukumari1 | 42 | |
| 10 | OFC CABLE AND CABLING | SUPPLY/INSTALLATION OF OFC 6 CORE ARMORED SINGLE MODE CABLE | 1,000 | meter | renukumari1 | 42 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates demonstrating relevant supply of security/data logging hardware
Financial statements (audited or certified)
EMD submission proof (as per ATC guidance)
Technical bid documents demonstrating compliance with product suite
OEM authorization / authorized dealer certificates if required
Any required installation/maintenance capabilities per ATC
Key insights about JHARKHAND tender market
Bidders must review the ATC uploaded by HPCL, ensure GST and PAN validity, submit technical and financial bids, and comply with the 25% quantity variation clause. Provide OEM authorizations if required and demonstrate experience with similar security/data logging hardware. Delivery terms follow the option clause with 30-day minimum extension.
Submit GST certificate, PAN, audited financial statements, experience certificates for similar projects, OEM authorization, technical bid documents, and EMD proof per ATC guidance. Ensure all documents reflect current organization name and project scope for Bokaro 825102.
Delivery follows the original delivery schedule; if quantities increase, extended time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. The purchaser may extend this to the original delivery window during contract execution.
The tender data does not specify explicit standards; bidders should confirm IS/ISO certifications and OEM approvals in the ATC. Ensure compliance with any IS/IEC or organization-specific standards as stated in the uploaded ATC document.
Estimated value is ₹284,500 for a bundle of items including PV-DG data logger, IP67 enclosure, 6-port LIU, 5-port network switch, media converter, OFC fiber components, and related cabling plus transportation and logistics services as part of a single tender.
EMD details are not provided in the visible data; bidders must check the ATC for exact EMD amount, payment method (DD/online), and due date, and prepare the tender security accordingly before submission.
BOQ lists 10 items with N/A quantities; bidders should refer to the ATC and eventual addenda for itemized quantities and units. Prepare a flexible pricing bid to accommodate possible quantity changes up to 25%.
Delivery timing will depend on original order dates; option-clause-driven extensions may apply. The minimum extension for increased quantity is 30 days, and the final schedule will be issued with the purchase order aligned to Bokaro 825102.
Controller General Of Defence Accounts
📍 HYDERABAD, TELANGANA
New Delhi Municipal Council, Ndmc
📍 NAGPUR, MAHARASHTRA
Indian Army
📍 JODHPUR, RAJASTHAN
Indian Army
Power Grid Corporation Of India Limited
Sign up now to access all documents
Main Document
BOQ
BOQ
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS