TenderDekho Logo
GEM

Indian Army Buckle 12.7mm, Cable Battery Ground & Switch Assembly Tender Jodhpur Rajasthan 2026

Bid Publish Date

23-Jan-2026, 7:30 pm

Bid End Date

02-Feb-2026, 8:00 pm

Progress

Issue23-Jan-2026, 7:30 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

637

Category

BUCKLE 12.7MM

Bid Type

Two Packet Bid

Tender Overview

The procurement is issued by the Indian Army (Department of Military Affairs) for multiple product categories including BUCKLE 12.7MM, CABLE BATTERY GROUND, BULB 12V 5W, END STEERING TIE ROD, SWITCH ASSY CHANGE OVER located in JODHPUR, RAJASTHAN 342001. The scope emphasizes post-award design validation with required approval of Detailed Design Drawings within 5 days of award, followed by a modification list within 7 days and alignment to approved drawings. The clause implies potential delivery schedule adjustment if the buyer’s drawing approval is delayed. A bidder must demonstrate solid financial health, non-liquidation status, and non-obsolescence with at least 1 year residual market life for offered items. The tender expects submission of a Data Sheet for product verification and an OEM-backed capability to supply to government organizations, including 3 years of similar govt/PSU experience. Unique risk controls include hazardous-material handling rules if applicable and a non-disclosure declaration. This opportunity targets vendors with robust fabrication, supply chain, and compliance capabilities for government bids in Rajasthan.

Key differentiators include: detailed drawings approval process, strict data-sheet conformity, and 3-year govt supply experience, alongside GST alignment and vendor-code creation requirements.

Technical Specifications & Requirements

  • Data Sheet upload mandatory with bid; must align with product specifications offered.
  • Detailed Design Drawings to be approved within 5 days post-award; modifications list due in 7 days.
  • If approval is delayed by the buyer, the delivery period is resealed with no LD for the period of delay.
  • Experience criterion: bidder/OEM should have manufactured and supplied the same/similar category products to Central/State Govt or PSU for at least 3 years before bid opening.
  • Product lifecycle: items must not be declared end-of-life by OEM for at least 1 year after bid.
  • Hazardous materials handling compliance applies when relevant, including packaging labels with MSDS, batch number, and manufacturing date.
  • Mandatory NDA declaration to be uploaded on bidder letterhead.
  • Required submission documents: PAN, GSTIN, cancelled cheque, EFT mandate; ensure GST is checked by bidder; GST reimbursement per actuals or lower of quoted rate.
  • Data sheet mismatch leads to bid rejection.

Terms, Conditions & Eligibility

  • EMD/Financial standing: bidder must be financially sound; no liquidation or court receivership; submit a formal undertaking.
  • GST/PAN/EFT: provide PAN, GSTIN, cancelled cheque, and EFT mandate certified by bank.
  • Delivery & Payment: delivery timeline linked to approved drawings; payment terms defined by buyer (not specified here).
  • Documentation: NDA, data sheets, and contracts showing 3 years govt/PSU supply evidence.
  • Non-Obsolescence: products must have at least 1 year residual life; not declared end-of-life.
  • Data integrity: any mismatch between offered product specs and data sheet may lead to rejection.
  • Hazardous materials: all safety/handling measures must be observed with proper labeling.
  • Vendor Code Creation: required bid documents include PAN, GSTIN, EFT, and cancelled cheque.

Key Specifications

    • Product categories: BUCKLE 12.7MM, CABLE BATTERY GROUND, BULB 12V 5W, END STEERING TIE ROD, SWITCH ASSY CHANGE OVER
    • Data Sheet: mandatory upload with bid; must match offered specifications
    • Experience: minimum 3 years in supplying similar govt/PSU products
    • Obsolescence: minimum 1 year residual market life
    • Drawings: Detailed Design Drawings due within 5 days; modification list in 7 days

Terms & Conditions

  • Key Term 1: Detailed Design Drawings approval within 5 days of award with 7-day modification cycle

  • Key Term 2: 3 years govt/PSU supply experience required (OEM or through reseller)

  • Key Term 3: Data Sheet must match product specifications; NDA to be uploaded

Important Clauses

Payment Terms

Not specified; however GST reimbursement aligned to actuals or lower of quoted rate

Delivery Schedule

Delivery period may be refixed if buyer delays drawing approval; no LD for buyer-caused delays

Penalties/Liquidated Damages

Not detailed; LD applicability is contingent on approved drawings and delivery schedule

Bidder Eligibility

  • Not under liquidation or court receivership; no bankruptcy

  • Regularly manufactured and supplied same/similar category to govt/PSU for 3 years

  • Provide data sheets, GSTIN, PAN, EFT mandate, and NDA as part of bid

Documents 6

GeM-Bidding-8880595.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Indian Army Department of Military Affairs Switch Assembly Change Over & Related Assemblies Tender 2026 Rajasthan

Indian Army

BATHINDA, PUNJAB

Posted: 5 January 2026
Closed: 16 January 2026
GEM

Change Over Switch 200 Amp Knife type,Main Switch ON OFF 200 Amp,Bus Bar 200 Amp with HRC Fuse,Port

Indian Army

PUNE, MAHARASHTRA

Posted: 17 December 2025
Closed: 30 December 2025
GEM

Bulb 24v 5w,Bulb 24v 21w,Bulb 12v 5w,Bulb 12v 21w,Knuckle brg 2.5 ton,Gear box oil seal ALS,Tie rod

Indian Army

KUPWARA, JAMMU & KASHMIR

Posted: 15 December 2025
Closed: 30 December 2025
GEM

ASSY COMBINATION SWITCH,ASSY CABLE COMPLETE,RELAY 12V,CHANGE OVER SWITCH,RELAY,REPAIR KIT FOR ACCES

Indian Army

DEHRADUN, UTTARAKHAND

Posted: 9 December 2025
Closed: 19 December 2025
GEM

LEVER TYRE CAR OR TRUCK,CHANGE OVER SWITCH,CONVEY CROSS LAMP,BOX TIN LAMP FILAMENT SIZE 102MM X 83M

Indian Army

DHEMAJI, ASSAM

Posted: 8 December 2025
Closed: 18 December 2025
GEM

Bill of Quantities (BOQ) 5 Items

Item # Title Description Quantity Unit Consignee Delivery (Days)
1 BUCKLE 12.7MM BUCKLE 12.7MM 69 nos kvsingh@224abod 45
2 CABLE BATTERY GROUND CABLE BATTERY GROUND 35 nos kvsingh@224abod 45
3 BULB 12V 5W BULB (12V 5W) 484 nos kvsingh@224abod 45
4 END STEERING TIE ROD END STEERING TIE ROD 28 nos kvsingh@224abod 45
5 SWITCH ASSY CHANGE OVER SWITCH ASSY CHANGE OVER 21 nos kvsingh@224abod 45

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC)

8

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

9

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Frequently Asked Questions

Key insights about RAJASTHAN tender market

How to bid for Indian Army buckles and switches tender in Jodhpur?

Bidders must ensure 3-year govt/PSU supply experience, upload a Data Sheet matching product specs, and provide PAN, GSTIN, cancelled cheque, and EFT mandate. Detailed Design Drawings must be approved within 5 days of award, with a 7-day modification list. NDA must be submitted with bid.

What documents are required for supplier registration and bid submission in this tender?

Submit PAN, GSTIN, cancelled cheque, EFT mandate certified by bank, NDA on bidder letterhead, product Data Sheets, and evidence of 3-year govt/PSU supply. Also provide contract copies from prior similar supplies and vendor-code creation documents as specified.

What are the key technical items covered under this tender in Rajasthan?

Items include BUCKLE 12.7MM, CABLE BATTERY GROUND, BULB 12V 5W, END STEERING TIE ROD, and SWITCH ASSY CHANGE OVER. All must have data sheets, draw approvals within 5 days, and compliance with OEM life expectancy of at least 1 year.

When is the delivery timeline affected by buyer drawing approvals for this bid?

Delivery is delayed if the buyer delays drawing approval; the delivery period is re-fixed without LD for the delay period. Ensure drawings are promptly submitted within 5 days post-award to avoid schedule shifts.

What is the minimum experience required for bidders in this government procurement?

Bidders must demonstrate at least 3 years of regular manufacture and supply of the same or similar category products to Central/State Govt or PSU prior to bid opening; include contract copies for each year.

What standards or life-cycle criteria must the offered products meet?

Offered items must not be end-of-life per OEM; require a minimum residual market life of 1 year. Data sheets must be consistent with supplied products, or the bid may be rejected.

What hazardous-material compliance requirements accompany this tender?

If applicable, comply with transport/handling/storage safety regulations; label packing with MSDS, batch number, manufacturing date, gross/net weight, shelf life, and hazard symbols on each package.

What are the mandatory steps for a successful data-sheet submission?

Submit a data sheet that exactly matches the offered product; ensure all parameters, part numbers, and performance specs align. Any mismatch may lead to bid rejection and disqualification from the procurement.

Similar Tenders

2 found

Indian Army Spare Parts Tender Bangalore Karnataka 2026 - Vehicle Parts for Tata Safari Royal Enfield Hero Honda Clutch Brake IS Specifications

Indian Army

📍 BANGALORE, KARNATAKA

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM
Urgent

Indian Army Security Equipment Tender 2026 India - IS 1364 Nut M12 x1.5, Alternator Assembly, Brake Shoes & More

Indian Army

📍 BUDGAM, JAMMU & KASHMIR

⏰ Deadline: 3 days left
🛒 Type: Goods
View GEM