Indian Army VOL KNOB MOTOROLA & UPS 1KVA Tender Kangra Himachal Pradesh 2025
Indian Army
KANGRA, HIMACHAL PRADESH
Bid Publish Date
27-Jun-2026, 1:45 pm
Bid End Date
07-Jul-2026, 2:00 pm
Location
Progress
Quantity
14
Category
CHANNEL KNOB MOTOROLA
Bid Type
Single Packet Bid
Indian Army Department Of Military Affairs invites bids for CHANNEL KNOB MOTOROLA, ANTENA HELLICAL 400MM UHF, BTY CHARGER MOTOROLA, UPS 1 KVA, MONITOR, BTY MOTOROLA as part of a multi-item procurement. The BOQ lists 6 items (N/A specifics shown). The buyer reserves a 25% quantity flexibility at contract award and for the currency period, with delivery time calculated from the last original delivery date and minimum 30 days. An ISO 9001 certification is mandatory for bidders or OEMs, and a Material Test Certificate must accompany delivery. This tender emphasizes conformity testing in the buyer’s lab as the acceptance criterion.
Key differentiators include the option clause on quantity and the mandatory quality controls; the emphasis on ISO 9001 and material testing suggests a focus on compliant, traceable components for military communications peripherals. The procurement context is ongoing supply of Motorola-form factor components, including backup power and monitoring peripherals, under strict quality control.
Product/service: CHANNEL KNOB MOTOROLA, ANTENA HELICAL 400MM UHF, BTY CHARGER MOTOROLA, UPS 1 KVA, MONITOR, BTY MOTOROLA
Standards: ISO 9001 (certification for bidder or OEM)
Testing: Material Test Certificate to accompany supply; buyer’s lab results govern acceptance
Delivery: Delivery period starts from last date of original DO; additional time formula with minimum 30 days
Quantities: Option to increase/decrease up to 25% of bid/contract quantity during and after contract
Quantity fluctuation allowed up to 25% at contract and during currency
ISO 9001 certification mandatory for bidder or OEM
Material Test Certificate required with delivery; lab test governs acceptance
Not explicitly stated; procurement follows standard government terms with delivery-based acceptance
Delivery starts from the last date of original delivery order; extended time = (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days
Not specified in provided data; penalties may be included in ATC/Corrigendum
Must hold ISO 9001 certification (bidder or OEM)
Must provide Material Test Certificate with supply
Must comply with 25% quantity option terms
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
CHANNEL KNOB MOTOROLA , ANTENA HELLICAL 400MM UHF , BTY CHARGER MOTOROLA , UPS 1 KVA , MONITER , BTY MOTOROLA
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
KANGRA, HIMACHAL PRADESH
Indian Army
Indian Army
JAMNAGAR, GUJARAT
Indian Army
LUCKNOW, UTTAR PRADESH
Indian Army
SRINAGAR, JAMMU & KASHMIR
Tender Results
Loading results...
CHANNEL KNOB MOTOROLA
IT
ANTENA HELLICAL 400MM UHF
IT
BTY CHARGER MOTOROLA
IT
UPS 1 KVA
IT
MONITER
IT
BTY MOTOROLA
IT
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | CHANNEL KNOB MOTOROLA | IT | 2 | nos | pao152fd | 21 | |
| 2 | ANTENA HELLICAL 400MM UHF | IT | 2 | nos | pao152fd | 21 | |
| 3 | BTY CHARGER MOTOROLA | IT | 3 | nos | pao152fd | 21 | |
| 4 | UPS 1 KVA | IT | 2 | nos | pao152fd | 21 | |
| 5 | MONITER | IT | 1 | nos | pao152fd | 21 | |
| 6 | BTY MOTOROLA | IT | 4 | nos | pao152fd | 21 |
Discover companies most likely to bid on this tender
GST certificate
PAN card
Experience certificates
Financial statements
Material Test Certificate
ISO 9001 certificate (bidder or OEM)
OEM authorization (if applicable)
Technical bid documents and bid submission certificates as per ATC/Corrigendum
Key insights about HIMACHAL PRADESH tender market
Bidders must submit GST, PAN, experience, financial statements, and Material Test Certificate along with ISO 9001 certification. The tender allows a 25% quantity option and requires delivery within the calculated period based on the last original delivery date. Compliance with lab-tested acceptance is required.
Required documents include GST certificate, PAN card, experience certificates, financial statements, Material Test Certificate, ISO 9001 certification (bidder or OEM), and OEM authorizations if applicable. Also include technical bid documents and any ATC/Corrigendum-specific certificates.
Bid must ensure ISO 9001 certified supply chain; components require Material Test Certificate; acceptance hinges on buyer’s lab test results. Specific product names include CHANNEL KNOB MOTOROLA, ANTENA HELICAL 400MM UHF, BTY CHARGER MOTOROLA, UPS 1 KVA.
Delivery period starts from the last date of the original delivery order. If quantity increases, extended time uses the formula (Increased quantity ÷ Original quantity) × Original delivery period, with a mandatory minimum of 30 days.
Material Test Certificate accompanies the supply and the buyer’s lab results are the sole criterion for acceptance, making it essential for bidders to ensure traceability and conformity of materials to specification.
The purchaser reserves the right to increase or decrease the quantity up to 25% of bid/contract quantity at contract award and during the currency period, at contracted rates, impacting delivery planning and pricing.
The tender covers MOTOROLA-related peripherals including CHANNEL KNOB, ANTENA HELICAL 400MM UHF, BTY CHARGER, BTY MOTOROLA, UPS 1 KVA, and related MONITOR equipment, with emphasis on ISO 9001 compliance and material testing.
Verify bidder or OEM ISO 9001 certification through the certifying body; ensure the certificate covers the offered products and is valid for the procurement period. Attach copy of certificate in your bid submission and reference the certificate number.
Indian Army
📍 KANGRA, HIMACHAL PRADESH
Indian Army
📍 VADODARA, GUJARAT
Indian Coast Guard
📍 VISAKHAPATNAM, ANDHRA PRADESH
Indian Army
📍 MEERUT, UTTAR PRADESH
N/a
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS