Office Of Dg (ace) Defence R&D tender for TRANSDUCER ASSEMBLYs Chennai Tamil Nadu 500 PSI 100 BAR 2025
Office Of Dg (ace)
CHENNAI, TAMIL NADU
Progress
Quantity
1
Bid Type
Two Packet Bid
Armoured Vehicles Nigam Limited invites bids for the furnace coil assembly 500KG, 250KW / 1000V / 500Hz, Part No. 300002150, intended for the Megatherm induction furnace. The scope is strictly supply of goods, with no BOQ items listed. The procurement location is MEDAK, TELANGANA. A mandatory 12-month warranty, proper packing, and precise marking are required. GST applicability is bidder’s responsibility with reimbursement as per actuals or capped rates. An open tender approach is noted, with pre-acceptance inspections defined by the CGM or authorized representative. Vendors must sign the attached Technical Compliance Sheet and adhere to timely submission per TOD constraints.
Product/service names: Furnace coil assembly for Megatherm induction furnace
Quantities/values: 500KG coil assembly (capacity stated); no monetary BOQ provided
EMD/estimated value: Not specified in data
Experience: Not specified
Quality/compliance: 12-month warranty; Govt lab test certificate; marking and packing standards
Delivery/installation: Scope limited to supply of goods; post-receipt inspection required
GST to be considered by bidder; reimbursement as actuals or capped
12-month warranty with certificate to accompany supplies
Post-receipt inspection by CGM or authorized representative
Mandatory signing of Technical Compliance Sheet; TOD-compliant submission
Packing/marking requirements including month/year of manufacture
GST reimbursement as actuals or capped; bidder bears GST implications
Open tender with TOD; no explicit delivery timeline provided in data
Not specified; replacement obligation for non-conforming goods per declaration
Must have GSTIN and PAN
Must provide EFT mandate and bank details
Must sign Technical Compliance Sheet and provide Govt lab test certificates
Office Of Dg (ace)
CHENNAI, TAMIL NADU
Indian Army
Ajmer, RAJASTHAN
Indian Coast Guard
MUMBAI, MAHARASHTRA
Indian Army
JAMMU, JAMMU & KASHMIR
Delhi Metro Rail Corporation Limited
WEST DELHI, DELHI
Tender Results
Loading results...
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN copy
Cancelled cheque copy
EFT Mandate certified by bank
Technical Compliance Sheet signed by vendor
Post receipt inspection plan and CGM authorization details
Govt lab test certificate / Test Certificate
Declaration of conformity format (as provided in tender)
Key insights about TELANGANA tender market
Bidders must submit PAN, GSTIN, cancelled cheque, EFT mandate, and the signed Technical Compliance Sheet. Include Govt lab test certificates and the declaration of conformity. The tender requires a 12-month warranty and post-receipt inspection by CGM. Ensure TOD-compliant submission and packing/marking details in the bid.
Submit PAN, GSTIN, cancelled cheque, EFT mandate, and the signed Technical Compliance Sheet. Attach Govt lab test certificate, post-receipt inspection plan, and conformity declaration. Also provide warranty certificate and packing/marking information as per tender terms and TOD instructions.
Coil assembly for 500KG Megatherm induction furnace; rating 250KW at 1000V and 500Hz; Part No. 300002150. Ensure the coil matches Megatherm compatibility, includes proper marking with month/year of manufacture, and adheres to the provided conformity declaration.
Warranty period is 12 months with a warranty certificate. Post-receipt inspection conducted by CGM or authorized representative. Pre-dispatch inspection is not applicable. Ensure packing meets transit/storage protection and that all documents accompany the goods for acceptance testing.
GST is the bidder's responsibility; reimbursement will be as per actuals or applicable rates, whichever is lower, up to the quoted GST percentage. Contractors must provide GSTIN and reflect GST on the bid as required by the procurement terms.
Packing must prevent transit damage; marking should include the firm name, S.O. number with date, and month/year of manufacture. A conformity declaration and test certificates from a Govt lab must be provided with the shipment.
Post-receipt inspection is conducted at the consignee site by the CGM or his authorized representative. Ensure readiness of samples and accompanying documentation, including the test certificates and conformity declaration, to pass acceptance.
Directorate Of Purchase And Stores
📍 MUMBAI, MAHARASHTRA
South Eastern Coalfields Limited
📍 KORBA, CHHATTISGARH
Mahanadi Coalfields Limited
📍 ANGUL, ODISHA
Andaman Lakshadweep Harbour Works (alhw)
📍 NORTH AND MIDDLE ANDAMAN, ANDAMAN & NICOBAR
Damodar Valley Corporation
📍 Purulia, WEST BENGAL
Sign up now to access all documents
Main Document
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS