Indian Air Force procurement of PRESSURE PLATE, CLUTCH PLATE, ROLLER BEARING, CLUTCH ROD and LINKAGE ASSEMBLY with WITHDRAWAL BEARING 2026
Indian Air Force
JODHPUR, RAJASTHAN
Bid Publish Date
04-Jun-2026, 7:48 am
Bid End Date
15-Jun-2026, 9:00 am
Location
Progress
Quantity
4
Category
CLUTCH PLATE
Bid Type
Single Packet Bid
Organization: Indian Air Force, Department of Military Affairs. Procurement targets multiple transmission and friction components: OIL SENSOR UNIT, WITHDRAWAL BEARING, PRESSURE PLATE, and CLUTCH PLATE. Address for delivery and installation: 9 BRD AIR FORCE, NAGAR ROAD, NEAR TATA GUARD ROOM BUS STOP, CHANDAN NAGAR, PUNE-411014. Scope includes essential installation accessories, with OEM/authorized distributor involvement. Estimated value and exact quantity are not disclosed; bidders should plan for potential volume changes under the option clause up to 50%. The bid requires a robust compliance package and evidence of prior government supply experience. Unique aspects include shelf-life minimums and detailed authorisation requirements for OEMs. Tender is focused on spare parts supply and associated accessories within a high-security defense context, with delivery and commissioning performed at the specified Pune facility.
Oil sensor unit
Withdrawal bearing
Pressure plate
Clutch plate
Delivery to 9 BRD Air Force, Chandannagar, Pune
Shelf life: minimum 1 year from acceptance
Installation and commissioning accessories included
Option clause: ±50% quantity with proportional delivery time
EMD amount not disclosed; bidder to verify at bid stage
1-year government/PSU supply experience required
Up to 50% quantity variation with adjusted delivery period
OEM authorization required for distributors
Shelf life minimum 1 year from acceptance
Delivery and installation at Pune address
Not specified in data; verify exact payment terms during bid
Delivery and commissioning at Pune address; option clause allows up to 50% quantity change
Not disclosed; bidders should confirm LD terms in contract
1 year prior government/PSU supply experience for same/similar category products
OEM authorization for distributors submitting bids
GSTIN and PAN valid for bid submission
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
OIL SENSOR UNIT , WITHDRAWAL BEARING , PRESSURE PLATE , CLUTCH PLATE
Trusted by 5,000+ companies to find, track, and win government tenders.
Our team will walk you through the platform and help set up your profile — free, no commitment.
Our team will reach out to schedule your free session.
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Air Force
JODHPUR, RAJASTHAN
Indian Army
KUPWARA, JAMMU & KASHMIR
Indian Army
KUPWARA, JAMMU & KASHMIR
Indian Army
MEERUT, UTTAR PRADESH
Indian Army
KANGRA, HIMACHAL PRADESH
Tender Results
Loading results...
Discover companies most likely to bid on this tender
PAN card copy
GSTIN copy
Cancelled cheque
EFT mandate copy certified by bank
Experience certificates showing 1 year government/PSU supply for same/similar products
Contract copies for the year-wise supply proofs
Manufacturer Authorization/ OEM authorization form with details (name, designation, address, email, phone)
Bidders should submit PAN, GSTIN, cancelled cheque, and EFT mandate, plus OEM authorization if applicable. Provide evidence of at least 1 year of government/PSU supply in similar products, and copies of relevant contracts. Ensure installation accessories are included as part of the bid price.
Mandatory documents include PAN card, GSTIN, cancelled cheque, EFT mandate, and OEM authorization if bidding via distributor. Also attach experience certificates for at least 1 year with contract copies showing quantity supplied to government/PSU bodies.
The spare parts must have a minimum usable shelf life of 1 year from the date of acceptance, and a remaining usable shelf life must be maintained at the time of supply to ensure reliability during commissioning and operation.
The purchaser reserves the right to increase or decrease the order up to 50% of the bid quantity, with delivery time adjusted as (increased quantity/original quantity) × original delivery period, minimum 30 days.
Bid must include all essential installation and commissioning accessories beyond standard items, and all costs must be included in the bid price; verify compatibility with Pune installation site requirements.
Bidder or OEM must have regularly manufactured and supplied the same category to a central/state govt or PSU for at least 1 year before bid opening; primary product value in bunch bids must meet this criterion.
Submit Manufacturer Authorization/Certificate detailing OEM name, designation, address, email, and phone along with bid; if bidding through an authorized distributor, ensure the authorization covers the exact product lines.
Delivery and installation must occur at the specified Pune address; the bid includes essential installation accessories, and the supplier must support commissioning activities as part of the contract.
Indian Army
📍 KUPWARA, JAMMU & KASHMIR
Border Security Force (bsf)
📍 JAIPUR, RAJASTHAN
Indian Army
📍 DIMAPUR, NAGALAND
Indian Army
📍 ANANTHNAG, JAMMU & KASHMIR
Indian Army
📍 KANPUR NAGAR, UTTAR PRADESH
Sign up now to access all documents
Main Document
OTHER
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS