TenderDekho Logo
GEM

Indian Army Procurement SUSPENSION BUS KIT RELEASE BEARING INTER COOLER PIPE HEAD LIGHT BULB HORN 12V HEAD GASKET WIPER BLADE FUSE 40AMP SPEED SENSOR Tender 2026

Bid Publish Date

04-Jun-2026, 9:56 am

Bid End Date

15-Jun-2026, 10:00 am

Location

ALMORA , UTTARAKHAND

Progress

Issue04-Jun-2026, 9:56 am
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

47

Category

RELEASE BEARING

Bid Type

Two Packet Bid

Key Highlights

  • Mandatory 25% quantity variation right for the Purchaser and extended delivery time calculations using the formula (Increased quantity ÷ Original quantity) × Original delivery period with a minimum of 30 days
  • OEM turnover requirement identical to bidder turnover; three-year average turnover evidenced via audited statements or CA certificate
  • GST reimbursement policy: actuals or quoted rate, whichever is lower, as per bidder's GST application
  • Non-liquidity and non-bankruptcy verification: bidders must upload a compliance undertaking
  • 9-item BOQ scope including SUSPENSION BUS KIT, RELEASE BEARING, INTER COOLER PIPE, HEAD LIGHT BULB, HORN 12V, HEAD GASKET, WIPER BLADE, FUSE 40AMP, SPEED SENSOR
  • No explicit quantities in BoQ; emphasis on delivery performance and option-based quantity adjustments

Tender Overview

The Indian Army, Department Of Military Affairs, is seeking procurement of multiple automotive components: SUSPENSION BUS KIT, RELEASE BEARING, INTER COOLER PIPE, HEAD LIGHT BULB, HORN 12 VOLT, HEAD GASKET, WIPER BLADE, FUSE 40AMP, and SPEED SENSOR. The BoQ lists 9 items, with no explicit quantities published. The contract includes an option clause allowing up to 25% quantity variation at contracted rates and a delivery-time adjustment mechanism tied to the original and extended delivery periods. Bidders must meet GST and turnover prerequisites and ensure OEM turnover compliance. Geopolitical location is not specified in the data. This tender emphasizes financial standing, non-liquidity, and compliance with buyer terms to secure supply of essential vehicle components for the Army fleet, with emphasis on timely delivery and contract flexibility.

Technical Specifications & Requirements

  • IRD/IS standards not specified; product names and categories are clearly listed: SUSPENSION BUS KIT, RELEASE BEARING, INTER COOLER PIPE, HEAD LIGHT BULB (12V), HORN (12V), HEAD GASKET, WIPER BLADE, FUSE 40AMP, SPEED SENSOR.
  • No explicit quantity or unit values in the BoQ; 9 items total in the procurement scope.
  • The buyer mandates an option clause for up to 25% quantity variation during and after contract; delivery periods adjust accordingly with a minimum 30-day logic.
  • GST considerations and whether reimbursement matches actuals or quoted rate are addressed in terms; the bidder bears GST calculation responsibility.
  • Turnover criteria apply to both bidders and the OEM, requiring three-year average turnover with certified financials; younger entities use post-incorporation turnover.

Terms, Conditions & Eligibility

  • EMD/financial security: Not explicitly disclosed in data; bidders must adhere to standard EMD requirements per T&C.
  • Turnover criteria: Minimum average annual turnover over last three financial years as specified in bid document; requires certified audited statements or CA certificate; if entity is <3 years old, turnover is calculated post-constitution.
  • OEM turnover: OEMs must meet the same turnover thresholds over the last three years; documentation from audited balances or CA certificates preferred.
  • GST: Bidder bears GST calculation; reimbursement may be at actuals or capped to quoted GST rate.
  • Delivery: Delivery period linked to the order date, with extension rules under the option clause; minimum 30 days added for extended periods.
  • Financial health: Bidders must not be in liquidation or court receivership; must upload an undertaking.
  • Documentation readiness: Prepare standard bid documents including GST, PAN, turnover certificates, OEM authorizations, and technical compliance certificates as applicable.

Key Specifications

    • Product names: SUSPENSION BUS KIT, RELEASE BEARING, INTER COOLER PIPE, HEAD LIGHT BULB (12V), HORN 12V, HEAD GASKET, WIPER BLADE, FUSE 40AMP, SPEED SENSOR
    • BoQ status: 9 total items with no published quantities
    • Option clause: up to 25% quantity increase at contracted rates
    • Delivery time: calculated extension logic with minimum 30 days when applicable
    • GST handling: bidder bears GST; reimbursement limited to actual or quoted rate

Terms & Conditions

  • Option-based quantity adjustment up to 25% with extended delivery period rules

  • Three-year turnover criteria for bidder and OEM documented via audited statements or CA certificate

  • GST responsibility lies with bidder; reimbursement policy as per actuals or lower quoted rate

Important Clauses

Payment Terms

GST handling by bidder; reimbursement policy at actual or lower quoted rate; no explicit advance/payment terms disclosed

Delivery Schedule

Delivery period linked to last date of original delivery order; extension rules apply with calculated extra time; minimum 30 days

Penalties/Liquidated Damages

Not specified in data

Bidder Eligibility

  • No liquidation, court receivership, or bankruptcy proceedings

  • Three-year average turnover criteria with supporting financial documents

  • OEM turnover criteria met for offered product

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

SUSPENSION BUS KIT , RELEASE BEARING , INTER COOLER PIPE , HEAD LIGHT BULB , HORN 12 VOLT , HEAD GASKET , WIPER BLADE , FUSE 40AMP , SPEED SENSOR

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT
Free Trial Available

Win more tenders with
real-time intelligence

Trusted by 5,000+ companies to find, track, and win government tenders.

Smart Alerts
Daily matched tenders to your inbox
Bid Results
See L1 winners & actual prices paid
Competitor Intel
Track rival companies & win patterns
Price Intelligence
BOQ rate trends to benchmark your bid
Book a Free Demo

See TenderDekho in action

Our team will walk you through the platform and help set up your profile — free, no commitment.

Callback within 24 hrs No credit card needed

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9418486.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Accelerator Cable,Front Brake Pad,Rear Inner Shoe,Air Filter,Air dryer Assy,Cabin Shocker,Bearing T

Indian Army

DODA, JAMMU & KASHMIR

Posted: 15 July 2025
Closed: 25 July 2025
GEM

Indian Army Spare Parts Tender Baramulla Jammu & Kashmir 2026 for Automotive Components and Engine Parts

Indian Army

BARAMULLA, JAMMU & KASHMIR

Posted: 27 April 2026
Closed: 7 May 2026
GEM

Fan belt,Hand Brake Cable,Differential Case Bearing,Inner pinion Bearing,Clutch Plate,Front Suspens

Indian Army

BARAMULLA, JAMMU & KASHMIR

Posted: 21 May 2025
Closed: 11 June 2025
GEM

BLADE WIND SHIELD WIPER,SPRING BRAKE CHAMBER,HEAD LAMP,DIRECTIONAL LIGHT VEHICULAR,LIGHT ASSY INDIC

Indian Army

NAINITAL, UTTARAKHAND

Posted: 14 February 2026
Closed: 24 February 2026
GEM

Bearing,Rear Hub Bearing,Fuel Hose,Holder Bulb,Cylinder Head Air compressor,Cylinder Head Gasket ki

Indian Army

RI BHOI, MEGHALAYA

Posted: 26 May 2025
Closed: 16 June 2025
GEM

Bill of Quantities (BOQ) 9 Items Sign in for GEM prices

#1

SUSPENSION BUS KIT

SUSPENSION BUS KIT

2 nos Delivery: 20 days
#2

RELEASE BEARING

RELEASE BEARING

4 nos Delivery: 20 days
#3

INTER COOLER PIPE

INTER COOLER PIPE

2 nos Delivery: 20 days
#4

HEAD LIGHT BULB

HEAD LIGHT BULB

20 nos Delivery: 20 days
#5

HORN 12 VOLT

HORN 12 VOLT

4 nos Delivery: 20 days
#6

HEAD GASKET

HEAD GASKET

3 nos Delivery: 20 days
#7

WIPER BLADE

WIPER BLADE

6 nos Delivery: 20 days
#8

FUSE 40AMP

FUSE 40AMP

4 nos Delivery: 20 days
#9

SPEED SENSOR

SPEED SENSOR

2 nos Delivery: 20 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Audited financial statements for last 3 years or CA certificate showing turnover

4

OEM authorization letter (if bidding on behalf of OEM)

5

Turnover certificates for OEM as applicable

6

Undertaking of non-liquidity / no liquidation proceedings

7

Any technical compliance certificates relevant to automotive components

8

Experience certificates for similar supply engagements (if available)

Frequently Asked Questions

What documents are required for the Army automotive tender in India 2026?

Bidders should submit GST certificate, PAN card, three-year turnover certificates (audited or CA), OEM authorization if applicable, and experience certificates for similar supply. Include technical compliance documentation and undertakings regarding non-liquidity. Ensure the documents align with the T&C and turnover criteria.

How is the 25% quantity variation managed in Army procurement

The purchaser may increase or decrease the bid quantity by up to 25% at contract award and during contract currency. Delivery time adjusts using the formula: (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days added for extended periods.

What are the GST considerations for the Army parts tender 2026

Bidders bear GST calculations; reimbursement is based on actual GST or the lower quoted rate. Ensure GST compliance in bid submission and clearly state the applicable GST percentage in the price bid.

What is required to prove OEM turnover for this Army procurement

Provide certified audited balance sheets or CA certificate showing three-year average turnover for the OEM of the offered product. If the OEM is <3 years old, turnover is calculated from the completed financial years after incorporation.

What are the delivery terms for the Army component tender 2026

Delivery periods commence from the last date of the original delivery order. If the option clause is exercised, additional time is calculated per the formula with a 30-day minimum; the purchaser may extend delivery up to the original period.

How to ensure eligibility for the Indian Army vehicle components tender

Meet non-liquidity criteria, provide turnover proof, OEM turnover proof, GST compliance, and relevant experience. Submit technical compliance certificates for the items: SUSPENSION BUS KIT, RELEASE BEARING, INTER COOLER PIPE, HEAD LIGHT BULB, HORN 12V, HEAD GASKET, WIPER BLADE, FUSE 40AMP, SPEED SENSOR.

Which components are covered under the Army 2026 procurement

The scope includes SUSPENSION BUS KIT, RELEASE BEARING, INTER COOLER PIPE, HEAD LIGHT BULB, HORN 12V, HEAD GASKET, WIPER BLADE, FUSE 40AMP, and SPEED SENSOR; all are part of the 9-item BoQ with no quantities disclosed publicly.

What is the minimum delivery time for extended orders in this tender

Extended delivery time must reflect the 30-day minimum for any additional period; the exact deadline depends on the original delivery period and quantity changes. Ensure compliance with the formula-based extension as per option clause for timely supply.

Similar Tenders

5 found
Urgent

PIPE BRAKE NO 2,SUSPENSION BUSH KIT,FLOAT CARBURATOR,TAIL LAMP ASSY WITH BULB,TRAFICATOR ASSY REAR

Indian Army

📍 MEERUT, UTTAR PRADESH

⏰ Deadline: 6 days left
🛒 Type: Goods
View GEM
Urgent

GLOW PLUG,REAR WHEEL BEARING,SPIDER BEARING,REAR SHOCK ABSORBER,CLUTCH MASTER CYLINDER,TEMPRATURE S

Indian Army

📍 ALMORA, UTTARAKHAND

⏰ Deadline: 7 days left
🛒 Type: Goods
View GEM

Indian Army Procurement Leh Caliper Pad Assy Head Light Bulb Fan Belt Alternator 12V - Automotive Parts Tender 2026

Indian Army

📍 LEH, JAMMU & KASHMIR

⏰ Deadline: 4 weeks left
🛒 Type: Goods
View GEM

Indian Army Gurudaspur Bear ing Tapered Roller, Air Pipe, Master Cylinder Repair Kit Procurement 2026

Indian Army

📍 GURDASPUR, PUNJAB

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM
Urgent

Indian Army Bearing and Related Automotive Spare Parts Tender 2026 Rajasthan Government Procurement

Indian Army

📍 BARAMULLA, JAMMU & KASHMIR

⏰ Deadline: 2 days left
🛒 Type: Goods
View GEM

Explore More Opportunities

Quick Access
Chat with us