Accelerator Cable,Front Brake Pad,Rear Inner Shoe,Air Filter,Air dryer Assy,Cabin Shocker,Bearing T
Indian Army
DODA, JAMMU & KASHMIR
Bid Publish Date
04-Jun-2026, 9:56 am
Bid End Date
15-Jun-2026, 10:00 am
Location
Progress
Quantity
47
Category
RELEASE BEARING
Bid Type
Two Packet Bid
The Indian Army, Department Of Military Affairs, is seeking procurement of multiple automotive components: SUSPENSION BUS KIT, RELEASE BEARING, INTER COOLER PIPE, HEAD LIGHT BULB, HORN 12 VOLT, HEAD GASKET, WIPER BLADE, FUSE 40AMP, and SPEED SENSOR. The BoQ lists 9 items, with no explicit quantities published. The contract includes an option clause allowing up to 25% quantity variation at contracted rates and a delivery-time adjustment mechanism tied to the original and extended delivery periods. Bidders must meet GST and turnover prerequisites and ensure OEM turnover compliance. Geopolitical location is not specified in the data. This tender emphasizes financial standing, non-liquidity, and compliance with buyer terms to secure supply of essential vehicle components for the Army fleet, with emphasis on timely delivery and contract flexibility.
Option-based quantity adjustment up to 25% with extended delivery period rules
Three-year turnover criteria for bidder and OEM documented via audited statements or CA certificate
GST responsibility lies with bidder; reimbursement policy as per actuals or lower quoted rate
GST handling by bidder; reimbursement policy at actual or lower quoted rate; no explicit advance/payment terms disclosed
Delivery period linked to last date of original delivery order; extension rules apply with calculated extra time; minimum 30 days
Not specified in data
No liquidation, court receivership, or bankruptcy proceedings
Three-year average turnover criteria with supporting financial documents
OEM turnover criteria met for offered product
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
SUSPENSION BUS KIT , RELEASE BEARING , INTER COOLER PIPE , HEAD LIGHT BULB , HORN 12 VOLT , HEAD GASKET , WIPER BLADE , FUSE 40AMP , SPEED SENSOR
Trusted by 5,000+ companies to find, track, and win government tenders.
Our team will walk you through the platform and help set up your profile — free, no commitment.
Our team will reach out to schedule your free session.
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
DODA, JAMMU & KASHMIR
Indian Army
BARAMULLA, JAMMU & KASHMIR
Indian Army
BARAMULLA, JAMMU & KASHMIR
Indian Army
NAINITAL, UTTARAKHAND
Indian Army
RI BHOI, MEGHALAYA
Tender Results
Loading results...
SUSPENSION BUS KIT
SUSPENSION BUS KIT
RELEASE BEARING
RELEASE BEARING
INTER COOLER PIPE
INTER COOLER PIPE
HEAD LIGHT BULB
HEAD LIGHT BULB
HORN 12 VOLT
HORN 12 VOLT
HEAD GASKET
HEAD GASKET
WIPER BLADE
WIPER BLADE
FUSE 40AMP
FUSE 40AMP
SPEED SENSOR
SPEED SENSOR
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | SUSPENSION BUS KIT | SUSPENSION BUS KIT | 2 | nos | tech_tss232 | 20 | |
| 2 | RELEASE BEARING | RELEASE BEARING | 4 | nos | tech_tss232 | 20 | |
| 3 | INTER COOLER PIPE | INTER COOLER PIPE | 2 | nos | tech_tss232 | 20 | |
| 4 | HEAD LIGHT BULB | HEAD LIGHT BULB | 20 | nos | tech_tss232 | 20 | |
| 5 | HORN 12 VOLT | HORN 12 VOLT | 4 | nos | tech_tss232 | 20 | |
| 6 | HEAD GASKET | HEAD GASKET | 3 | nos | tech_tss232 | 20 | |
| 7 | WIPER BLADE | WIPER BLADE | 6 | nos | tech_tss232 | 20 | |
| 8 | FUSE 40AMP | FUSE 40AMP | 4 | nos | tech_tss232 | 20 | |
| 9 | SPEED SENSOR | SPEED SENSOR | 2 | nos | tech_tss232 | 20 |
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Audited financial statements for last 3 years or CA certificate showing turnover
OEM authorization letter (if bidding on behalf of OEM)
Turnover certificates for OEM as applicable
Undertaking of non-liquidity / no liquidation proceedings
Any technical compliance certificates relevant to automotive components
Experience certificates for similar supply engagements (if available)
Bidders should submit GST certificate, PAN card, three-year turnover certificates (audited or CA), OEM authorization if applicable, and experience certificates for similar supply. Include technical compliance documentation and undertakings regarding non-liquidity. Ensure the documents align with the T&C and turnover criteria.
The purchaser may increase or decrease the bid quantity by up to 25% at contract award and during contract currency. Delivery time adjusts using the formula: (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days added for extended periods.
Bidders bear GST calculations; reimbursement is based on actual GST or the lower quoted rate. Ensure GST compliance in bid submission and clearly state the applicable GST percentage in the price bid.
Provide certified audited balance sheets or CA certificate showing three-year average turnover for the OEM of the offered product. If the OEM is <3 years old, turnover is calculated from the completed financial years after incorporation.
Delivery periods commence from the last date of the original delivery order. If the option clause is exercised, additional time is calculated per the formula with a 30-day minimum; the purchaser may extend delivery up to the original period.
Meet non-liquidity criteria, provide turnover proof, OEM turnover proof, GST compliance, and relevant experience. Submit technical compliance certificates for the items: SUSPENSION BUS KIT, RELEASE BEARING, INTER COOLER PIPE, HEAD LIGHT BULB, HORN 12V, HEAD GASKET, WIPER BLADE, FUSE 40AMP, SPEED SENSOR.
The scope includes SUSPENSION BUS KIT, RELEASE BEARING, INTER COOLER PIPE, HEAD LIGHT BULB, HORN 12V, HEAD GASKET, WIPER BLADE, FUSE 40AMP, and SPEED SENSOR; all are part of the 9-item BoQ with no quantities disclosed publicly.
Extended delivery time must reflect the 30-day minimum for any additional period; the exact deadline depends on the original delivery period and quantity changes. Ensure compliance with the formula-based extension as per option clause for timely supply.
Indian Army
📍 MEERUT, UTTAR PRADESH
Indian Army
📍 ALMORA, UTTARAKHAND
Indian Army
📍 LEH, JAMMU & KASHMIR
Indian Army
📍 GURDASPUR, PUNJAB
Indian Army
📍 BARAMULLA, JAMMU & KASHMIR
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS