Progress
Public procurement opportunity for Directorate Of Employment & Training Wall Pannaling area 920 sqfeet, storage unit L X B X H - 8. 5 X x 1. 75 X 2. 5 ft, storage unit L X B X H - 11. 25 X 1. 75 X 2. 5 ft, storage unit for UPS L X B X H - 11. 25 X 1. 75 X 2. 5 ft, Installation of pannel Light 22 W pure white 6k, AC reinstallation, Celling Fan reinstallation, wiring and installation of New switch Board for AC, Fan and Pannel Light at suitable location near entrance door, New Switch Board and wiring for computer and CPU Unit, Projector installation with new Clamp, Main Computer Switch Board including, curtain 8. 75 ft X 6 ft, curtain 4. 75 ft X 6 ft, conference Room wall Panneling 710 Sq Ft with switch Board and curtain re installation in SURAT, GUJARAT. Quantity: 145 issued by. Submission Deadline: 02-11-2026 13: 00: 00. View full details and respond.
Quantity
145
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
EMD Required
Yes
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Item Category
Wall Pannaling area 920 sqfeet , storage unit L X B X H - 8.5 X x 1.75 X 2.5 ft , storage unit L X B X H - 11.25 X 1.75 X 2.5 ft , storage unit for UPS L X B X H - 11.25 X 1.75 X 2.5 ft , Installation of pannel Light 22 W pure white 6k , AC reinstallation , Celling Fan reinstallation , wiring and installation of New switch Board for AC, Fan and Pannel Light at suitable location near entrance door , New Switch Board and wiring for computer and CPU Unit , Projector installation with new Clamp , Main Computer Switch Board including , curtain 8.75 ft X 6 ft , curtain 4.75 ft X 6 ft , conference Room wall Panneling 710 Sq Ft with switch Board and curtain re installation
Advisory Bank
State Bank of India
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Pre-Bid Date
14-10-2026 14:00:00
Pre-Bid Venue
ITI SURAT (MAHILA) BEHIND BHIMRAD POLICE CHECK POST BHIMRAD ALTHAN ROAD SURAT 395007
Max Delivery Days
45
Delivery Locations
1
Delivery Cities
Surat
Delivery Pincodes
395007
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Dhimmar Tejal Ajaybhai | 395007,GOVT. INDUSTRIAL TRAINING INSTITUTE, SURAT (MAHILA), OPP. POLICE CHECK POST, AT - BHIMRAD, PO - KHAJOD, TA - SURAT CITY, DI - SURAT | Surat | Gujarat | 395007 | 2 | 45 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Wall Pannaling area 920 sqfeet
plywood can be semi water proof,paneling should project 2 inches from the wall,laminate can be 2 ton color, laminate thichness should be 1.25 mm and cota stone surface
storage unit L X B X H - 8.5 X x 1.75 X 2.5 ft
plywood can be semi water proof,laminate can be 2 ton color, laminate thichness should be 1.25 mm and cota stone surface
storage unit L X B X H - 11.25 X 1.75 X 2.5 ft
plywood can be semi water proof,laminate can be 2 ton color, laminate thichness should be 1.25 mm and cota stone surface
storage unit for UPS L X B X H - 11.25 X 1.75 X 2.5 ft
plywood can be semi water proof,laminate can be 2 ton color, laminate thichness should be 1.25 mm and cota stone surface
Installation of pannel Light 22 W pure white 6k
22 W pure white 6k with wiring
AC reinstallation
Installation with wiring if required
Celling Fan reinstallation
Installation with wiring if required
wiring and installation of New switch Board for AC, Fan and Pannel Light at suitable location near entrance door
with New Modular Board
New Switch Board and wiring for computer and CPU Unit
with New Modular Board 2 Switch -4 plug compulsory
Projector installation with new Clamp
with adjustable Stand
Main Computer Switch Board including
with New Modular Board 8 Switch -8 plug compulsory
curtain 8.75 ft X 6 ft
Roller Type 8.75 ft X 6 ft
curtain 4.75 ft X 6 ft
Roller Type 4.75 ft X 6 ft
conference Room wall Panneling 710 Sq Ft with switch Board and curtain re installation
710 Sq Ft Panneling with reinstallation modular switch Board
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Wall Pannaling area 920 sqfeet | plywood can be semi water proof,paneling should project 2 inches from the wall,laminate can be 2 ton color, laminate thichness should be 1.25 mm and cota stone surface | 2 | no | suratm_con | 45 | |
| 2 | storage unit L X B X H - 8.5 X x 1.75 X 2.5 ft | plywood can be semi water proof,laminate can be 2 ton color, laminate thichness should be 1.25 mm and cota stone surface | 2 | no | suratm_con | 45 | |
| 3 | storage unit L X B X H - 11.25 X 1.75 X 2.5 ft | plywood can be semi water proof,laminate can be 2 ton color, laminate thichness should be 1.25 mm and cota stone surface | 2 | no | suratm_con | 45 | |
| 4 | storage unit for UPS L X B X H - 11.25 X 1.75 X 2.5 ft | plywood can be semi water proof,laminate can be 2 ton color, laminate thichness should be 1.25 mm and cota stone surface | 2 | no | suratm_con | 45 | |
| 5 | Installation of pannel Light 22 W pure white 6k | 22 W pure white 6k with wiring | 60 | no | suratm_con | 45 | |
| 6 | AC reinstallation | Installation with wiring if required | 4 | no | suratm_con | 45 | |
| 7 | Celling Fan reinstallation | Installation with wiring if required | 12 | no | suratm_con | 45 | |
| 8 | wiring and installation of New switch Board for AC, Fan and Pannel Light at suitable location near entrance door | with New Modular Board | 2 | no | suratm_con | 45 | |
| 9 | New Switch Board and wiring for computer and CPU Unit | with New Modular Board 2 Switch -4 plug compulsory | 48 | no | suratm_con | 45 | |
| 10 | Projector installation with new Clamp | with adjustable Stand | 2 | no | suratm_con | 45 | |
| 11 | Main Computer Switch Board including | with New Modular Board 8 Switch -8 plug compulsory | 2 | no | suratm_con | 45 | |
| 12 | curtain 8.75 ft X 6 ft | Roller Type 8.75 ft X 6 ft | 2 | no | suratm_con | 45 | |
| 13 | curtain 4.75 ft X 6 ft | Roller Type 4.75 ft X 6 ft | 4 | no | suratm_con | 45 | |
| 14 | conference Room wall Panneling 710 Sq Ft with switch Board and curtain re installation | 710 Sq Ft Panneling with reinstallation modular switch Board | 1 | no | suratm_con | 45 |
Discover companies most likely to bid on this tender