LV7 TATA STORME FILTER CARTRIDGE,LV7 TATA STORME NEEDLE ROLLER BEARING,LV7 T 815 CONTROL VALVE,LV7
Indian Army
JODHPUR, RAJASTHAN
Progress
Quantity
19
Category
LV7 MARUTI VALVE GUIDE
Bid Type
Two Packet Bid
The opportunity is issued by the Indian Army, under the Department Of Military Affairs, for procurement of multiple LV7 vehicle spare parts including Maruti valve guide, LV7 Scorpio head light bulb, LV7 HMV gasket cover cylinder head, LV7 Tata Storme rubber hose UC pipe, LV1 R90 hose, LV7 Tata Storme tie rod end, and LV7 Tata Storme steering end. The BOQ lists 7 total items with unspecified quantities, and a flexible quantity option up to 25% during contract execution. A requirement to submit a material sample before bid closure and an ATC clause granting delivery-adjustment rights is stated. Turnover and past experience criteria are clearly specified in the terms. This tender targets Army logistics and vehicle spares supply in a framework that allows quantity adjustments and extended delivery windows while maintaining contracted rates. The procurement emphasizes standard compliance and demonstrable capability to supply auto components to a high-security government buyer, with emphasis on supplier readiness for multiple LV7 vehicle spares.
Product/service names and categories: LV7 vehicle spare parts including Maruti valve guide, Scorpio head light bulb, Tata Storme hoses and steering components
Quantities: not disclosed; BOQ indicates 7 items with N/A quantities
EMD/Estimated value: not disclosed in provided data
Experience: proof via contracts, invoices, execution certificates or third-party notes
Quality/standards: no explicit standard codes listed in data; defence-grade procurement context implies compliance
Option clause allows +/- 25% quantity variation at contract placement and during currency with adjusted delivery times
Turnover criteria require three-year average turnover with auditable financials
Past experience proof acceptable in multiple formats including client certifications and invoices
Sample submission is mandatory before bid deadline
Not specified in data provided; bidders should expect standard defence procurement payment terms upon bid submission
Delivery period begins from last date of original delivery order; extended time calculated as (increased quantity / original quantity) × original delivery period, minimum 30 days
Not detailed; ATC may include material acceptance rights; penalties not explicitly defined in data supplied
Three-year average turnover criterion with auditable documents
Experience proof acceptable via contracts, invoices, and client certs
Ability to submit a material sample before bid end date
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
LV7 MARUTI VALVE GUIDE , LV7 SCORPIO HEAD LIGHT BULB , LV7 HMV GASKET COVER CYLINDER HEAD , LV7 TATA STORME RUBBER HOSE UC PIPE , LV1 R90 HOSE , LV7 TATA STORME TIE ROD END , LV7 TATA STORME STEERING END
Trusted by 5,000+ companies to find, track, and win government tenders.
Our team will walk you through the platform and help set up your profile — free, no commitment.
Our team will reach out to schedule your free session.
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
JODHPUR, RAJASTHAN
Indian Army
JODHPUR, RAJASTHAN
Indian Army
JODHPUR, RAJASTHAN
Indian Army
JODHPUR, RAJASTHAN
Indian Army
JODHPUR, RAJASTHAN
Tender Results
Loading results...
LV7 MARUTI VALVE GUIDE
LV7 MARUTI VALVE GUIDE
LV7 SCORPIO HEAD LIGHT BULB
LV7 SCORPIO HEAD LIGHT BULB
LV7 HMV GASKET COVER CYLINDER HEAD
LV7 HMV GASKET COVER CYLINDER HEAD
LV7 TATA STORME RUBBER HOSE UC PIPE
LV7 TATA STORME RUBBER HOSE UC PIPE
LV1 R90 HOSE
LV1 R90 HOSE
LV7 TATA STORME TIE ROD END
LV7 TATA STORME TIE ROD END
LV7 TATA STORME STEERING END
LV7 TATA STORME STEERING END
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | LV7 MARUTI VALVE GUIDE | LV7 MARUTI VALVE GUIDE | 2 | nos | [email protected] | 15 | |
| 2 | LV7 SCORPIO HEAD LIGHT BULB | LV7 SCORPIO HEAD LIGHT BULB | 1 | nos | [email protected] | 15 | |
| 3 | LV7 HMV GASKET COVER CYLINDER HEAD | LV7 HMV GASKET COVER CYLINDER HEAD | 6 | nos | [email protected] | 15 | |
| 4 | LV7 TATA STORME RUBBER HOSE UC PIPE | LV7 TATA STORME RUBBER HOSE UC PIPE | 2 | nos | [email protected] | 15 | |
| 5 | LV1 R90 HOSE | LV1 R90 HOSE | 3 | nos | [email protected] | 15 | |
| 6 | LV7 TATA STORME TIE ROD END | LV7 TATA STORME TIE ROD END | 3 | nos | [email protected] | 15 | |
| 7 | LV7 TATA STORME STEERING END | LV7 TATA STORME STEERING END | 2 | nos | [email protected] | 15 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Certified Audited Balance Sheets or CA certificate showing three-year turnover
Past experience documents: contract copies, invoices, client execution certificates or equivalent
Sample submission documentation for the supplied items
Technical bid documents and any OEM authorizations or certifications if applicable
Key insights about RAJASTHAN tender market
Bidders must submit all required documents, including GST, PAN, turnover proof, past experience proofs, and a material sample before the bid deadline. Ensure compliance with the option clause and provide evidence of capability to supply LV7 Maruti valve guides, Scorpio head bulbs, and Tata Storme components.
Required submissions include GST certificate, PAN card, audited balance sheets or CA turnover certificate for three years, contract/invoice-based experience proofs, client certifications, and the mandatory material sample. OEM authorizations should be provided if applicable.
Delivery starts from the last date of the original delivery order; quantity can be increased up to 25% during contract; extended delivery time uses the formula (increased quantity/original quantity) × original delivery period with a minimum of 30 days.
Submit proof such as contract copies with invoices and self-certification, execution certificates from clients, or equivalent third-party notes showing successful delivery of similar vehicle spares for defence or large-scale fleets.
While explicit standards are not listed, the procurement context implies defence-grade quality with supplier capability to deliver Maruti valve guides, Scorpio head bulbs, and Tata Storme hoses; bidders should provide relevant certifications or OEM authorizations where available.
A material sample must be submitted before the last date of bid submission; ensure the sample corresponds to the LV7 Maruti valve guide and other listed parts to qualify for technical evaluation.
Indian Army
📍 JODHPUR, RAJASTHAN
Indian Army
📍 JODHPUR, RAJASTHAN
Indian Army
📍 JODHPUR, RAJASTHAN
Indian Army
📍 JODHPUR, RAJASTHAN
Indian Army
📍 LALITPUR, UTTAR PRADESH
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS