Indian Army Hose & Fuel Pipe Tender Ajmer Rajasthan 2025 – High Pressure Pipe, ISO Proply, Fuel Filter Standards
Indian Army
Ajmer, RAJASTHAN
Bid Publish Date
06-Jan-2026, 3:31 pm
Bid End Date
27-Jan-2026, 2:00 pm
Progress
Quantity
50
Bid Type
Two Packet Bid
Directorate Of Purchase And Stores invites bids for High Pressure Fire Fighting Hose with Delivery Couplings as per IS 14933 (Q2). Quantity: 50. Submission Deadline: 27-01-2026 14: 00: 00. Submit your proposal before the deadline.
Indian Army
Ajmer, RAJASTHAN
Punjab National Bank
UJJAIN, MADHYA PRADESH
Indian Army
DARJEELING, WEST BENGAL
Indian Army
DODA, JAMMU & KASHMIR
Indian Army
Pathankot, PUNJAB
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| GENERIC | Type of Hose | Type B (Hose to which on elastomeric outer coating or covering has been applied or incorporated as reinforcement to give the hoses very low absorption of liquids such as oils, greases, acid and alkalis, etc, and has high resistance to abrasion and direct heat.) |
| CONSTRUCTIONAL | Nominal Diameter (As per clause 3-2 and 3-3 of IS 14933:2001 Latest Amendment) | 63.0 |
| CONSTRUCTIONAL | Hose Length (As per clause 4 of IS 14933:2001 Latest Amendment) | 15.0 |
| CONSTRUCTIONAL | Mass/Metres (max) (in grams) (As per clause 5 of IS 14933:2001 Latest Amendment) | 550 gram for 63 mm Diameter |
| CONSTRUCTIONAL | Test Requirements | Hydrostatic Proof Pressure Test as per Clause 10 of IS 14933:2001 Latest Amendment, Hydrostatic Burst Pressure Test as per Clause 11 of IS 14933:2001 Latest Amendment, Kink Test as per Clause 12 of IS 14933:2001 Latest Amendment, Adhesion Test as per Clause 13 of IS 14933:2001 Latest Amendment, Abrasion Resistance as per Clause 14 of IS 14933:2001 Latest Amendment, Accelerated Ageing Test as per Clause 15 of IS 14933:2001 Latest Amendment, Change in length of Hose As per clause 16.1 and 16.2 of IS 14933-2001 Latest Amendment |
| CONSTRUCTIONAL | Additional Test Requirements for Type-B Hose (Hint: Select NA for Type-A Hose) | Ozone Resistance as per clause 17.1 of IS 14933:2001 Latest Amendment, Oil Resistance as per clause 17.2 of IS 14933:2001 Latest Amendment, Heat Resistance as per clause 17.3 of IS 14933:2001 Latest Amendment, NA |
| FIRE HOSE DELIVERY COUPLINGS, BRANCH PIPE, NOZZLES AND NOZZLE SPANNER | Size of Delivery Coupling (as per clause 5-3 of IS 903:1993 Latest Amendment) | 63.0 |
| FIRE HOSE DELIVERY COUPLINGS, BRANCH PIPE, NOZZLES AND NOZZLE SPANNER | Material of Delivery Coupling | Stainless steel as per Clause 5.2.6 of IS 903:1993 Latest Amendment |
| FIRE HOSE DELIVERY COUPLINGS, BRANCH PIPE, NOZZLES AND NOZZLE SPANNER | Binding with Delivery Coupling (Hint: Select NA if not applicable) | Binding of Delivery Coupling with hose after riveting and providing good quality canvas paddings (10 cm width) with 16 SWG copper wire. |
| FIRE HOSE DELIVERY COUPLINGS, BRANCH PIPE, NOZZLES AND NOZZLE SPANNER | Additional Accessories included in the scope of supply with Delivery Coupling (Hint: Select NA if not applicable) | Nozzles as per Clause 7 of IS 903:1993 Latest Amendment |
| FIRE HOSE DELIVERY COUPLINGS, BRANCH PIPE, NOZZLES AND NOZZLE SPANNER | Material of Branch Pipe (as per clause 6-1 of IS 903:1993 Latest Amendment) (Hint: Select NA if Branch Pipe is not part of supply) | Stainless steel as per Clause 5.2.6 of IS 903:1993 Latest Amendment |
| FIRE HOSE DELIVERY COUPLINGS, BRANCH PIPE, NOZZLES AND NOZZLE SPANNER | Shape and Dimension of the Branch Pipe (Hint: Select NA if Branch Pipe is not part of supply) | As per Clause 6.2 of IS 903:1993 Latest Amendment |
| FIRE HOSE DELIVERY COUPLINGS, BRANCH PIPE, NOZZLES AND NOZZLE SPANNER | Hydraulic Test Requirement of Branch Pipe (Hint: Select NA if Branch Pipe is not part of supply) | As per Clause 6.3 of IS 903:1993 Latest Amendment |
| FIRE HOSE DELIVERY COUPLINGS, BRANCH PIPE, NOZZLES AND NOZZLE SPANNER | Material of Nozzles (as per clause 7-1 of IS 903:1993 Latest Amendment) (Hint: Select NA if Nozzle is not part of supply) | Stainless steel as per Clause 5.2.6 of IS 903:1993 Latest Amendment |
| FIRE HOSE DELIVERY COUPLINGS, BRANCH PIPE, NOZZLES AND NOZZLE SPANNER | Size of nozzles (as per clause 7-2 of IS 903:1993 Latest Amendment) (Hint: Select NA if Nozzle is not part of supply) | NA |
| FIRE HOSE DELIVERY COUPLINGS, BRANCH PIPE, NOZZLES AND NOZZLE SPANNER | Hydraulic Test Requirements of Nozzles (Hint: Select NA if Nozzle is not part of supply) | As per Clause 7.3 of IS 903:1993 Latest Amendment |
| FIRE HOSE DELIVERY COUPLINGS, BRANCH PIPE, NOZZLES AND NOZZLE SPANNER | Material of Nozzle Spanner (Hint: Select NA if Nozzle Spanner is not part of supply) | As per Clause 8.1 of IS 903:1993 Latest Amendment |
| FIRE HOSE DELIVERY COUPLINGS, BRANCH PIPE, NOZZLES AND NOZZLE SPANNER | Shape and dimension of Nozzle spanner (Hint: Select NA if Nozzle Spanner is not part of supply) | As per Clause 8.2 of IS 903:1993 Latest Amendment |
| FIRE HOSE DELIVERY COUPLINGS, BRANCH PIPE, NOZZLES AND NOZZLE SPANNER | Anti-corrosive treatment of Nozzle spanner (Hint: Select NA if Nozzle Spanner is not part of supply) | As per Clause 8.3 of IS 903:1993 Latest Amendment |
| FIRE HOSE DELIVERY COUPLINGS, BRANCH PIPE, NOZZLES AND NOZZLE SPANNER | Deflection Test Requirement for Nozzle spanner (Hint: Select NA if Nozzle Spanner is not part of supply) | As per Clause 8.4 of IS 903:1993 Latest Amendment |
Discover companies most likely to bid on this tender
Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
North Eastern Electric Power Corporation Limited
📍 Wokha, NAGALAND
Yantra India Limited
Eastern Coalfields Limited
📍 DHANBAD, JHARKHAND
North Eastern Electric Power Corporation Limited
📍 DIBRUGARH, ASSAM
Indian Army
📍 JALANDHAR, PUNJAB
Sign up now to access all documents
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS