SUPPLY OF 47.5 KG STRAIGHT CONVEYOR SECTION,SUPPLY OF STRAIIGHT CONVEYOR SECTION GI COATED WITHOUT
Hindustan Petroleum Corporation Ltd
Progress
RAQuantity
298
Category
DESIGN SPLY OF CONVEYOR FOR 14.2 19 KG
Bid Type
Two Packet Bid
Hindustan Petroleum Corporation Ltd announces a tender for DESIGN SPLY OF CONVEYOR FOR 14. 2 19 KG, DESIGN SPLY OF DRIVE SECTION FOR 14. 2 19KG, DESIGN AND SUPPLY OF 90 DEG BEND CONVEYOR, DESIGN AND SUPPLY OF TAIL END SECTION, DESIGN AND SUPPLY OF COMMON TAIL END, E C OF CHAIN CONVEYOR SYSTEM FOR 14. 2 19, E C OF CONVEYOR DRIVE SECTION, DISM. 14. 2 19 KG CONVEYOR SYSTEM DRIVE SECTIONS TAIL ENDS, DESIGN SPLY OF CONVEYOR FOR 47. 5KG 35KG CYLINDER, DESIGN SPLY OF DRIVE SECTION FOR 47. 5KG 35KG CYLINDER CONVEYOR, DESIGN AND SUPPLY OF 90 DEG BEND CONVEYOR FOR 47. 5KG 35KG CYLINDER CONVEYOR, DESIGN AND SUPPLY OF TAIL END SECTION FOR 47. 5KG 35KG CYLINDER CONVEYOR, E C CHAIN CONV SYSTEM FOR 47. 5KG 35KG CYLINDER CONVEYOR, E C OF CONVEYOR DRIVE SECTION FOR 47. 5KG 35KG CYLINDER CONVEYOR, DISM. 47. 5KG 35KG CONVEYOR SYSTEM DRIVE SECTIONS TAIL ENDS in PALAKKAD, KERALA. Quantity: 298. Submission Deadline: 16-05-2025 09: 00: 00. Last date to apply is approaching fast!
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
DESIGN SPLY OF CONVEYOR FOR 14.2 19 KG , DESIGN SPLY OF DRIVE SECTION FOR 14.2 19KG , DESIGN AND SUPPLY OF 90 DEG BEND CONVEYOR , DESIGN AND SUPPLY OF TAIL END SECTION , DESIGN AND SUPPLY OF COMMON TAIL END , E C OF CHAIN CONVEYOR SYSTEM FOR 14.2 19 , E C OF CONVEYOR DRIVE SECTION , DISM. 14.2 19 KG CONVEYOR SYSTEM DRIVE SECTIONS TAIL ENDS , DESIGN SPLY OF CONVEYOR FOR 47.5KG 35KG CYLINDER , DESIGN SPLY OF DRIVE SECTION FOR 47.5KG 35KG CYLINDER CONVEYOR , DESIGN AND SUPPLY OF 90 DEG BEND CONVEYOR FOR 47.5KG 35KG CYLINDER CONVEYOR , DESIGN AND SUPPLY OF TAIL END SECTION FOR 47.5KG 35KG CYLINDER CONVEYOR , E C CHAIN CONV SYSTEM FOR 47.5KG 35KG CYLINDER CONVEYOR , E C OF CONVEYOR DRIVE SECTION FOR 47.5KG 35KG CYLINDER CONVEYOR , DISM. 47.5KG 35KG CONVEYOR SYSTEM DRIVE SECTIONS TAIL ENDS
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Hindustan Petroleum Corporation Ltd
Hindustan Petroleum Corporation Ltd
SURAT, GUJARAT
Hindustan Petroleum Corporation Ltd
KRISHNA, ANDHRA PRADESH
Hindustan Petroleum Corporation Ltd
SURAT, GUJARAT
Irel (india) Limited
KOLLAM, KERALA
Tender Results
Loading results...
DESIGN SPLY OF CONVEYOR FOR 14.2 19 KG
DESIGN SPLY OF CONVEYOR FOR 14.2 19 KG
DESIGN SPLY OF DRIVE SECTION FOR 14.2 19KG
DESIGN SPLY OF DRIVE SECTION FOR 14.2 19KG
DESIGN AND SUPPLY OF 90 DEG BEND CONVEYOR
DESIGN AND SUPPLY OF 90 DEG BEND CONVEYOR
DESIGN AND SUPPLY OF TAIL END SECTION
DESIGN AND SUPPLY OF TAIL END SECTION
DESIGN AND SUPPLY OF COMMON TAIL END
DESIGN AND SUPPLY OF COMMON TAIL END
E C OF CHAIN CONVEYOR SYSTEM FOR 14.2 19
E C OF CHAIN CONVEYOR SYSTEM FOR 14.2 20
E C OF CONVEYOR DRIVE SECTION
E C OF CONVEYOR DRIVE SECTION
DISM. 14.2 19 KG CONVEYOR SYSTEM DRIVE SECTIONS TAIL ENDS
DISM. 14.2 19 KG CONVEYOR SYSTEM DRIVE SECTIONS TAIL ENDS
DESIGN SPLY OF CONVEYOR FOR 47.5KG 35KG CYLINDER
DESIGN SPLY OF CONVEYOR FOR 47.5KG 35KG CYLINDER
DESIGN SPLY OF DRIVE SECTION FOR 47.5KG 35KG CYLINDER CONVEYOR
DESIGN SPLY OF DRIVE SECTION FOR 47.5KG 35KG CYLINDER CONVEYOR
DESIGN AND SUPPLY OF 90 DEG BEND CONVEYOR FOR 47.5KG 35KG CYLINDER CONVEYOR
DESIGN AND SUPPLY OF 90 DEG BEND CONVEYOR FOR 47.5KG 35KG CYLINDER CONVEYOR
DESIGN AND SUPPLY OF TAIL END SECTION FOR 47.5KG 35KG CYLINDER CONVEYOR
DESIGN AND SUPPLY OF TAIL END SECTION FOR 47.5KG 35KG CYLINDER CONVEYOR
E C CHAIN CONV SYSTEM FOR 47.5KG 35KG CYLINDER CONVEYOR
E C CHAIN CONV SYSTEM FOR 47.5KG 35KG CYLINDER CONVEYOR
E C OF CONVEYOR DRIVE SECTION FOR 47.5KG 35KG CYLINDER CONVEYOR
E C OF CONVEYOR DRIVE SECTION FOR 47.5KG 35KG CYLINDER CONVEYOR
DISM. 47.5KG 35KG CONVEYOR SYSTEM DRIVE SECTIONS TAIL ENDS
DISM. 47.5KG 35KG CONVEYOR SYSTEM DRIVE SECTIONS TAIL ENDS
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | DESIGN SPLY OF CONVEYOR FOR 14.2 19 KG | DESIGN SPLY OF CONVEYOR FOR 14.2 19 KG | 70 | meter | rahulp | 30 | |
| 2 | DESIGN SPLY OF DRIVE SECTION FOR 14.2 19KG | DESIGN SPLY OF DRIVE SECTION FOR 14.2 19KG | 4 | pieces | rahulp | 30 | |
| 3 | DESIGN AND SUPPLY OF 90 DEG BEND CONVEYOR | DESIGN AND SUPPLY OF 90 DEG BEND CONVEYOR | 4 | pieces | rahulp | 30 | |
| 4 | DESIGN AND SUPPLY OF TAIL END SECTION | DESIGN AND SUPPLY OF TAIL END SECTION | 4 | pieces | rahulp | 30 | |
| 5 | DESIGN AND SUPPLY OF COMMON TAIL END | DESIGN AND SUPPLY OF COMMON TAIL END | 2 | pieces | rahulp | 30 | |
| 6 | E C OF CHAIN CONVEYOR SYSTEM FOR 14.2 19 | E C OF CHAIN CONVEYOR SYSTEM FOR 14.2 20 | 80 | meter | rahulp | 30 | |
| 7 | E C OF CONVEYOR DRIVE SECTION | E C OF CONVEYOR DRIVE SECTION | 4 | pieces | rahulp | 30 | |
| 8 | DISM. 14.2 19 KG CONVEYOR SYSTEM DRIVE SECTIONS TAIL ENDS | DISM. 14.2 19 KG CONVEYOR SYSTEM DRIVE SECTIONS TAIL ENDS | 30 | meter | rahulp | 30 | |
| 9 | DESIGN SPLY OF CONVEYOR FOR 47.5KG 35KG CYLINDER | DESIGN SPLY OF CONVEYOR FOR 47.5KG 35KG CYLINDER | 30 | meter | rahulp | 30 | |
| 10 | DESIGN SPLY OF DRIVE SECTION FOR 47.5KG 35KG CYLINDER CONVEYOR | DESIGN SPLY OF DRIVE SECTION FOR 47.5KG 35KG CYLINDER CONVEYOR | 2 | pieces | rahulp | 30 | |
| 11 | DESIGN AND SUPPLY OF 90 DEG BEND CONVEYOR FOR 47.5KG 35KG CYLINDER CONVEYOR | DESIGN AND SUPPLY OF 90 DEG BEND CONVEYOR FOR 47.5KG 35KG CYLINDER CONVEYOR | 2 | pieces | rahulp | 30 | |
| 12 | DESIGN AND SUPPLY OF TAIL END SECTION FOR 47.5KG 35KG CYLINDER CONVEYOR | DESIGN AND SUPPLY OF TAIL END SECTION FOR 47.5KG 35KG CYLINDER CONVEYOR | 4 | pieces | rahulp | 30 | |
| 13 | E C CHAIN CONV SYSTEM FOR 47.5KG 35KG CYLINDER CONVEYOR | E C CHAIN CONV SYSTEM FOR 47.5KG 35KG CYLINDER CONVEYOR | 30 | meter | rahulp | 30 | |
| 14 | E C OF CONVEYOR DRIVE SECTION FOR 47.5KG 35KG CYLINDER CONVEYOR | E C OF CONVEYOR DRIVE SECTION FOR 47.5KG 35KG CYLINDER CONVEYOR | 2 | pieces | rahulp | 30 | |
| 15 | DISM. 47.5KG 35KG CONVEYOR SYSTEM DRIVE SECTIONS TAIL ENDS | DISM. 47.5KG 35KG CONVEYOR SYSTEM DRIVE SECTIONS TAIL ENDS | 30 | meter | rahulp | 30 |
Experience Criteria
Past Performance
Bidder Turnover
OEM Annual Turnover
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Start
27-May-2025, 6:00 pm
End
29-May-2025, 10:00 am
Duration: 40 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | A S MECHANICAL SYSTEMS PRIVATE LIMITED Under PMA | - | 15-05-2025 23:19:39 | |
| 2 | A&K AUTOMATION Under PMA | - | 15-05-2025 16:59:34 | |
| 3 | AVNI ENTERPRISES Under PMA | - | 15-05-2025 11:40:45 | |
| 4 | ELECO ENGINEERING Under PMA | - | 14-05-2025 16:29:20 | |
| 5 | EMRAD PROJECTS PRIVATE LIMITED Under PMA | - | 15-05-2025 14:07:52 | |
| 6 | LAYCOCK ENGINEERS PRIVATE LIMITED Under PMA | - | 15-05-2025 16:49:16 | |
| 7 | MARUTHI ENGINEERING EQUIPMENTS Under PMA | - | 13-05-2025 15:29:05 | |
| 8 | NINETEEN SPECTRON PRIVATE LIMITED Under PMA | - | 16-05-2025 08:34:08 | |
| 9 | PAM SYSTEMS PRIVATE LIMITED Under PMA | - | 15-05-2025 17:57:56 | |
| 10 | SREE LAXMI ENGINEERING Under PMA | - | 15-05-2025 16:33:12 | |
| 11 | SUPERTECH ENGINEERS Under PMA | - | 15-05-2025 13:25:50 |
These are the final prices after the reverse auction event. Prices may be lower than initial bids.
| Rank | Seller | Final Price | Item |
|---|---|---|---|
| L1 | A&K AUTOMATION(MSE,MII) Under PMA Winner | ₹19,68,000 | Item Categories : DESIGN SPLY OF CONVEYOR FOR 14.2 19 KG,DESIGN SPLY OF DRIVE SECTION FOR 14.2 19KG,DESIGN AND SUPPLY |
| L2 | NINETEEN SPECTRON PRIVATE LIMITED (MSE,MII) Under PMA | ₹19,72,800 | Item Categories : DESIGN SPLY OF CONVEYOR FOR 14.2 19 KG,DESIGN SPLY OF DRIVE SECTION FOR 14.2 19KG,DESIGN AND SUPPLY |
| L3 | SREE LAXMI ENGINEERING (MSE,MII) Under PMA | ₹23,78,691 | Item Categories : DESIGN SPLY OF CONVEYOR FOR 14.2 19 KG,DESIGN SPLY OF DRIVE SECTION FOR 14.2 19KG,DESIGN AND SUPPLY |
| L4 | A S MECHANICAL SYSTEMS PRIVATE LIMITED (MSE,MII) Under PMA | ₹24,12,000 | Item Categories : DESIGN SPLY OF CONVEYOR FOR 14.2 19 KG,DESIGN SPLY OF DRIVE SECTION FOR 14.2 19KG,DESIGN AND SUPPLY |
| L5 | SUPERTECH ENGINEERS (MSE,MII) Under PMA | ₹26,43,200 | Item Categories : DESIGN SPLY OF CONVEYOR FOR 14.2 19 KG,DESIGN SPLY OF DRIVE SECTION FOR 14.2 19KG,DESIGN AND SUPPLY |
🎉 L1 Winner
A&K AUTOMATION(MSE,MII) Under PMA
Final Price: ₹19,68,000
Key insights about KERALA tender market
The eligibility requirements include being a registered entity, possessing experience in designing and supplying conveyor systems, and having technical personnel with expertise in this area. Bidders must also demonstrate their ability to adhere to industry standards and previously completed relevant projects, ensuring a proven track record in similar works.
Bidders are required to submit a valid business registration certificate, relevant quality assurance certificates to demonstrate compliance with industry standards, and any additional documentation that showcases past projects related to conveyor systems. This is crucial to proving eligibility and technical competence in the proposal.
The registration process involves creating an account on the designated tender platform. Bidders must complete the registration form, attach the necessary certificates and documentation, and ensure compliance with all submission guidelines provided in the tender notice. Following successful registration, bidders can access and submit their proposals.
Accepted document formats typically include PDF, DOCX, and XLSX. Bidders should ensure their documents are prepared in these formats to facilitate smooth evaluation during the tender process. Clear naming conventions and organized submission of all documents are recommended for ease of review.
Bidders are required to provide an Earnest Money Deposit (EMD) as part of the proposal submission. Additionally, performance security may also be required post-award to ensure compliance with contract terms and obligations. Payment terms will be outlined in the finalized contract following tender evaluation and award.
Hindustan Petroleum Corporation Ltd
📍 KOTA, RAJASTHAN
Nuclear Power Corporation Of India Limited
📍 TIRUNELVELI, TAMIL NADU
Indian Army
📍 PUNE, MAHARASHTRA
Garden Reach Ship Builders And Engineers Limited (grse)
📍 KOLKATA, WEST BENGAL
Hindustan Copper Limited
📍 BALAGHAT, MADHYA PRADESH
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS