data wall display
Haryana State Electronics Development Corporation Ltd. (hartron)
PANCHKULA, HARYANA
Bid Publish Date
23-Nov-2025, 11:47 am
Bid End Date
03-Dec-2025, 12:00 pm
Location
Progress
Quantity
6
Bid Type
Two Packet Bid
The Urban Development And Housing Department Bihar invites procurement for data wall display (Q2) with no BOQ items listed. The tender references standard option and turnover criteria, requiring third-party NABCB inspection and a two-year post-installation maintenance commitment. The scope emphasizes OEM turnover verification, positive net worth, and compliance with structured financial and eligibility demands. Unique terms include scalable quantity adjustments up to 25% during and after contract award, plus delivery-time calculations tied to original delivery periods. The opportunity targets suppliers with robust financials and compliance credentials, operating in the Bihar procurement landscape and aligned with government data display projects.
Data wall display product category (Q2) with potential 25% quantity variation
Delivery terms linked to original/extended delivery periods with ≥30 days minimum extension
Turnover verification for bidder and OEM over last three financial years
Positive net worth requirement for OEM
NABCB third-party inspection requirement
Two-year maintenance/AMC post-installation
Option clause permits ±25% quantity adjustment at contract and during currency
OEM turnover and positive net worth criteria must be demonstrated
NABCB third-party inspection is mandatory for bid submission
Not disclosed in data; bidders should prepare standard bid payment security and terms per buyer terms
Delivery period ties to last date of original delivery order; extensions calculated with minimum 30 days and limited to original period
Not specified in data; bidders should heed general LD norms in the absence of explicit values
Minimum average turnover over last three financial years as per bid document
Positive net worth as per last audited statement
OEM must meet turnover criteria or be compliant in bunch bids
NABCB-approved third-party inspection arrangement
Maintenance capability for two years post-installation
Haryana State Electronics Development Corporation Ltd. (hartron)
PANCHKULA, HARYANA
N/a
PARBHANI, MAHARASHTRA
Urban Administration And Devlopment
SAGAR, MADHYA PRADESH
Udanti Sitanadi Tiger Reserve Gariaband
RAIPUR, CHHATTISGARH
Directorate Of Collegiate Education
THRISSUR, KERALA
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Audited financial statements for last three years or CA/CMA certificate of turnover
OEM authorization for offered product
NABCB-approved third-party inspection arrangement details
Financial statements showing positive net worth
Experience certificates and installation references (if available)
Technical bid submission as per T&Cs
Key insights about BIHAR tender market
Bidders must submit GST, PAN, audited turnover for three years or CA/CMA certificate, OEM authorization, NABCB inspection details, and maintenance commitments. Ensure positive OEM net worth, provide turnover documentation, and comply with the 25% quantity option clause. Follow the buyer terms for delivery and payment as applicable.
Required documents include GST registration, PAN, three-year turnover evidence (audited balances or CA/CMA certificate), OEM authorization for the product, NABCB-inspection arrangement details, positive net worth proof, and installation references plus any technical bid compliance certificates.
No explicit product specs are provided; bidders must ensure NABCB third-party inspection readiness, OEM turnover compliance, and maintenance commitment for two years post-installation. The procurement allows up to 25% quantity variation and defines delivery-extension math with a 30-day minimum extension.
Delivery timing follows the last date of the original delivery order, with potential extensions calculated as (increased quantity ÷ original quantity) × original delivery period, and a minimum extension of 30 days. Extensions may be capped to the original period.
Bidders must arrange third-party NABCB-inspected assessment through a registered firm. Provide NABCB approval details and inspection plan as part of the technical bid to demonstrate compliance and readiness for acceptance testing.
OEMs must show positive net worth and meet the minimum average turnover over the last three financial years. In multi-item bids, the OEM of the highest-valued primary item must satisfy the turnover criterion.
A two-year post-installation maintenance commitment is required. Bidders should outline service levels, response times, and AMC terms to cover preventive maintenance, part replacement, and on-site support during the warranty period.
The purchaser may increase or decrease quantity up to 25% at contract placement and during the contract currency at contracted rates. Delivery time extensions are calculated accordingly, with a minimum 30-day extension, ensuring supply chain flexibility.
Indian Air Force
📍 JORHAT, ASSAM
Indian Air Force
Indian Army
📍 GANJAM, ODISHA
Centre For Development Of Advanced Computing (c-dac)
📍 THIRUVANANTHAPURAM, KERALA
Indian Air Force
📍 WEST DELHI, DELHI
Access all tender documents at no cost
Main Document
GEM_GENERAL_TERMS_AND_CONDITIONS
Main Document
GEM_GENERAL_TERMS_AND_CONDITIONS