TenderDekho Logo
GEM

Procurement Opportunity: Round the clock operation,monitoring and Preventive Maintenance For 1st Year,Round the clock operat in RANCHI, JHARKHAND

Bid Publish Date

14-Jul-2026, 5:54 pm

Bid End Date

04-Aug-2026, 7:00 pm

EMD

₹3,13,340

Value

₹1,04,44,679

Location

RANCHI , JHARKHAND

Progress

Issue14-Jul-2026, 5:54 pm
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

301503

Category

Round the clock operation,monitoring and Preventive Maintenance For 1st Year

Bid Type

Two Packet Bid

Categories 144

AGITATORS FLEET OWNER SPECTROSCOPIC EQUIPMENT ELECTRICAL WIND MILL ENERGY PROJECT APPARELS CONTROLLER SWITCHES APFC PANEL FIRE HOSES ARCHERY BOW STRINGS BARITONE HORNS SAFETY GADGET MISCELLANEOUS VALVE PAINTING ANGLE GLOBE VALVES STRUCTURE FABRICATION CUTTING MACHINE POWER CABLE RESPONSE INDICATOR CABBING EQUIPMENTS TUBE AND FITTING ARNO STARTING CONTACTOR SENSOR BUS CABLE SWITCH YARD AMC OF COMPUTER AMC OF DESKTOP MOBILE VEHICLE SWITCHING APPARATUS STEEL FURNITURE ARC VALVE DIGITAL THERMOMETER INTRUDER ALARM PHOTOCOPIER MACHINE AIR REGULATORS WELL TESTING EQUIPMENTS AGRICULTURAL PUMP ELECTRICAL WIRE SENSOR SUPPLY XLPE CABLE CENTRIFUGAL PUMP OPERATION MAINTENANCE CLOTHING MAGNET VALVE AMC OF ELECTRONIC HYDRAULIC JACK MECHANICAL EQUIPMENT ELECTRICAL SUBSTATION MI TANK IRRIGATION PUMPS PANEL STOMACHERS MAINTENANCE CONTRACT OF ELECTRONIC INDICATING AND RECORDING INSTRUMENTS PUMPS ENGINE POWER PRESSURE INDICATORS REFRIGERATED INCUBATORS CENTRIFUGAL MACHINE ATM HYDRANT LINE FLOW REGULATOR PETROLEUM FUELS COILED CABLE MACHINERY REPAIRS FLUID MECHANICS EQUIPMENT BUILDING MAINTENANCE ALARM SYSTEMS SKILLED MANPOWER CONTROL PANEL LFH CABLE GLUCOMETER FIRE ALARM PANEL CONTACTORS SKILLED PERSONNEL LABORATORY PRESSES PNEUMATIC VALVES ULTRA SOUND THERAPY PUMP VALVES PNEUMATIC PRESSURE GAUGE SMOKE DETECTORS ANEROID BLOOD PRESSURE UNIT SOUNDER VALVES HYDRAULIC MACHINES PRINTER REPAIR POWER WIRE WATER SUPPLY PROJECT PRESSURE REGULATOR TECHNICAL SERVICES ANIMAL LABORATORY EQUIPMENT BELL CONTROLLER ACETYLENE BOX OIL PUMP TRANSPORTATION OF DIESEL VALVE WATER LEVEL RECORDER AXLE COUNTER PRESSURE MEASURING AND CONTROL INSTRUMENTS FUME HOODS WELLHEAD EQUIPMENT BODYWEIGHT MEASURING SCALE ERECTION OF STRUCTURAL FIRE SUPPRESSION SYSTEM SOLENOID VALVES TURBINE PUMPS ROUTINE MAINTENANCE LFH WIRE INDUCTION MOTORS ANAESTHESIA MACHINE SUPPLY OF ENGINE SUMP PUMPS BOILER MOUNTING VALVE FIRE ALARM SYSTEMS CABLE AXIAL SPLIT PUMPS PLC PANEL FIRE BREATHING APPARATUS FABRICATOR WATER TRANSMISSION MACHINE FLAME DETECTORS SUBMERSIBLE PUMP GAUGE LIFT IRRIGATION BATTERY FLOAT SWITCHES MANUAL CALL POINT DETECTOR BOILER VALVE WATER PUMP CABLE SUPPLY PUMPING MACHINEY ELECTROMAGNET METAL PRODUCTS FIRE FIGHTING EQUIPMENT BOYLES APPARATUS BURGLAR ALARM MOTOR VEHICLES MANUFACTURING SERVICES AMC OF AIR CONDITION

Public procurement opportunity for Airports Authority Of India Round the clock operation, monitoring and Preventive Maintenance For 1st Year, Round the clock operat in RANCHI, JHARKHAND. Quantity: 301503 issued by. Submission Deadline: 04-08-2026 19: 00: 00. View full details and respond.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Advisory Bank

State Bank of India

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

730

Delivery Locations

1

Delivery Cities

Ranchi

Delivery Pincodes

834002

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Joshua Kindo834002,BIRSA MUNDA AIRPORT, RANCHIRanchiJharkhand83400212730-

Authority Records

MINISTRY OF CIVIL AVIATIONAIRPORTS AUTHORITY OF INDIA

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9606607.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Procurement Opportunity: TCFHP/e-Tender/25-26/25 dt. 30.12.2025 in DINAJPUR UTTAR, WEST BENGAL

WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD

DINAJPUR UTTAR, WEST BENGAL

Posted: 9 January 2026
Closed: 30 January 2026
EPROCURE

Procurement Opportunity: TCFHP/e-Tender/25-26/24 dt. 30.12.2025 in DARJEELING, WEST BENGAL

WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD

DARJEELING, WEST BENGAL

Posted: 9 January 2026
Closed: 30 January 2026
EPROCURE

Contract Bidding Open For TCFHP/e-Tender/26-27/04 dt. 12.05.2026 in DARJEELING, WEST BENGAL

WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD

DARJEELING, WEST BENGAL

Posted: 19 May 2026
Closed: 9 June 2026
EPROCURE

Procurement Opportunity: Providing One Year Fully Comprehensive Maintenance Contract with 24x7 Round the Clock Operator for all the System Installed in Super Specialty Hospital Under Shri Vasantrao Naik Government Medical College and Hospital at Yavatmal in YAVATMAL, MAHARASHTRA

Public Works Department Mantralaya

YAVATMAL, MAHARASHTRA

Posted: 18 June 2026
Closed: 25 June 2026
EPROCURE

Contract Bidding Open For R/M of Machinery for the year 2025-26. in WEST, DELHI

Irrigation and Flood Control

WEST, DELHI

Posted: 12 December 2025
Closed: 19 December 2025
EPROCURE

Bill of Quantities (BOQ) 61 Items Sign in for GEM prices

#1

Round the clock operation,monitoring and Preventive Maintenance For 1st Year

Round the clock operation,monitoring and Preventive Maintenance For 1st Year

12 months Delivery: 730 days
#2

Round the clock operation,monitoring and Preventive Maintenance For 2nd Year

Round the clock operation,monitoring and Preventive Maintenance For 2nd Year

12 months Delivery: 730 days
#3

Repair of existing split case or radially split case type Centrifugal pump 75HP to 105HP

Repair of existing split case or radially split case type Centrifugal pump 75HP to 105HP

1 each Delivery: 730 days
#4

Repair of existing split case or radially split case type Centrifugal pump 7.5HP to 12.5HP

Repair of existing split case or radially split case type Centrifugal pump 7.5HP to 12.5HP

1 each Delivery: 730 days
#5

Repair of burnt out Induction motor 75HP to 105HP

Repair of burnt out Induction motor 75HP to 105HP

1 each Delivery: 730 days
#6

Repair of burnt out Induction motor 7.5HP to 12.5HP

Repair of burnt out Induction motor 7.5HP to 12.5HP

1 each Delivery: 730 days
#7

Providing one welder and one Khalasi along with Electric welding gas cutting machine

Providing one welder and one Khalasi along with Electric welding gas cutting machine

120 hrs Delivery: 730 days
#8

Maintenance and Service Contract for 105HP Kirloskar Make Diesel Engine Quarterly Visit per Diesel Engine

Maintenance and Service Contract for 105HP Kirloskar Make Diesel Engine Quarterly Visit per Diesel Engine

8 each Delivery: 730 days
#9

Maintenance and Service Contract for 105HP Kirloskar Make Diesel Engine B Check per Diesel Engine

Maintenance and Service Contract for 105HP Kirloskar Make Diesel Engine B Check per Diesel Engine

1 each Delivery: 730 days
#10

Maintenance and Service Contract for 105HP Kirloskar Make Diesel Engine C Check per Diesel Engine

Maintenance and Service Contract for 105HP Kirloskar Make Diesel Engine C Check per Diesel Engine

1 each Delivery: 730 days
#11

Maintenance and Service Contract for 80 HP Mahindra Make Diesel Engine Quarterly Visit per Diesel Engine

Maintenance and Service Contract for 80 HP Mahindra Make Diesel Engine Quarterly Visit per Diesel Engine

8 each Delivery: 730 days
#12

Maintenance and Service Contract for 80 HP Mahindra Make Diesel Engine B Check per Diesel Engine

Maintenance and Service Contract for 80 HP Mahindra Make Diesel Engine B Check per Diesel Engine

1 each Delivery: 730 days
#13

Maintenance and Service Contract for 80 HP Mahindra Make Diesel Engine C Check per Diesel Engine

Maintenance and Service Contract for 80 HP Mahindra Make Diesel Engine C Check per Diesel Engine

1 each Delivery: 730 days
#14

Quarterly Periodic Preventive Service Visit Siemens make Fire Alarm Control Panel at NITB

Quarterly Periodic Preventive Service Visit Siemens make Fire Alarm Control Panel at NITB

8 job Delivery: 730 days
#15

Quarterly Periodic Preventive Service Visit Bosch make Fire Alarm Control Panel at TBCT Building

Quarterly Periodic Preventive Service Visit Bosch make Fire Alarm Control Panel at TBCT Building

8 job Delivery: 730 days
#16

Quarterly Periodic Preventive Service Visit Kidde make Fire Alarm Control Panel at Old ATC Tower

Quarterly Periodic Preventive Service Visit Kidde make Fire Alarm Control Panel at Old ATC Tower

8 job Delivery: 730 days
#17

Breakdown Service visits for attending complaints Siemens make Fire Alarm Control Panel at NITB

Breakdown Service visits for attending complaints Siemens make Fire Alarm Control Panel at NITB

4 job Delivery: 730 days
#18

Breakdown Service visits for attending complaints Bosch make Fire Alarm Control Panel at TBCT Building

Breakdown Service visits for attending complaints Bosch make Fire Alarm Control Panel at TBCT Building

4 job Delivery: 730 days
#19

Breakdown Service visits for attending complaints Kidde make Fire Alarm Control Panel at Old ATC Tower

Breakdown Service visits for attending complaints Kidde make Fire Alarm Control Panel at Old ATC Tower

4 job Delivery: 730 days
#20

Providing and fixing of 6mm thick Glazed Glass for fire hose cabinaet box

Providing and fixing of 6mm thick Glazed Glass for fire hose cabinaet box

10 sqmtr Delivery: 730 days
#21

Painting of Electrical Panels Pumps Panels Earth pit covers Fire Hydrant Boxes exposed Fire Hydrant Pipelines etc

Painting of Electrical Panels Pumps Panels Earth pit covers Fire Hydrant Boxes exposed Fire Hydrant Pipelines etc

300 sqmtr Delivery: 730 days
#22

Supply replacement installation testing and commissioning of Siemens FireFinder XLS Device Loop Card

Supply replacement installation testing and commissioning of Siemens FireFinder XLS Device Loop Card

1 job Delivery: 730 days
#23

Supply replacement installation testing and commissioning of Siemens FireFinder XLS Power Supply Charger Module

Supply replacement installation testing and commissioning of Siemens FireFinder XLS Power Supply Charger Module

1 job Delivery: 730 days
#24

Supply replacement installation testing and commissioning of LCD Display Unit for Bosch make Fire Alarm Control panel

Supply replacement installation testing and commissioning of LCD Display Unit for Bosch make Fire Alarm Control panel

1 job Delivery: 730 days
#25

Supply and Refilling of NOVEC 1230

Supply and Refilling of NOVEC 1230

80 kgs Delivery: 730 days
#26

Supply and Replacement of existing Gas Suppression Panel

Supply and Replacement of existing Gas Suppression Panel

2 each Delivery: 730 days
#27

Supply and Installation of Three Pole Contactors 7.5HP to 12.5HP

Supply and Installation of Three Pole Contactors 7.5HP to 12.5HP

2 each Delivery: 730 days
#28

Supply and Installation of Three Pole Contactors 75HP to 105HP

Supply and Installation of Three Pole Contactors 75HP to 105HP

2 each Delivery: 730 days
#29

Supply of following spares 25mm Gun-metal Air release valve

Supply of following spares 25mm Gun-metal Air release valve

5 each Delivery: 730 days
#30

Supply of following spares 100mm dia dial Pressure guages

Supply of following spares 100mm dia dial Pressure guages

5 each Delivery: 730 days
#31

Supply of following spares 25mm Forged brass Ball Valve

Supply of following spares 25mm Forged brass Ball Valve

5 each Delivery: 730 days
#32

Supply of following spares Intelligent Multi-criterion Smoke Detector for Siemens make FACP

Supply of following spares Intelligent Multi-criterion Smoke Detector for Siemens make FACP

60 each Delivery: 730 days
#33

Supply of following spares Intelligent Multi-criteria Heat Detector for Siemens make FACP

Supply of following spares Intelligent Multi-criteria Heat Detector for Siemens make FACP

15 each Delivery: 730 days
#34

Supply of following spares Single Output Control Module for Siemens make FACP

Supply of following spares Single Output Control Module for Siemens make FACP

10 each Delivery: 730 days
#35

Supply of following spares Single Input Monitor Module for Siemens make FACP

Supply of following spares Single Input Monitor Module for Siemens make FACP

10 each Delivery: 730 days
#36

Supply of following spares Fault Isolator Module for Siemens make FACP

Supply of following spares Fault Isolator Module for Siemens make FACP

10 each Delivery: 730 days
#37

Supply of following spares Manual Call Point for Indoor for Siemens make FACP

Supply of following spares Manual Call Point for Indoor for Siemens make FACP

10 each Delivery: 730 days
#38

Supply of following spares Response Indicator for Siemens make FACP

Supply of following spares Response Indicator for Siemens make FACP

10 each Delivery: 730 days
#39

Supply of following spares Duct Detector for Siemens make FACP

Supply of following spares Duct Detector for Siemens make FACP

5 each Delivery: 730 days
#40

Supply of following spares Electrical Sounder with Strobe Hooter

Supply of following spares Electrical Sounder with Strobe Hooter

5 each Delivery: 730 days
#41

Supply of following spares 12V 180Ah Sealed Maintenace Free Battery

Supply of following spares 12V 180Ah Sealed Maintenace Free Battery

4 each Delivery: 730 days
#42

Supply of following spares 12V 18Ah Sealed Maintenace Free Battery

Supply of following spares 12V 18Ah Sealed Maintenace Free Battery

24 each Delivery: 730 days
#43

Supply of following spares 12V 7Ah Sealed Maintenace Free Battery

Supply of following spares 12V 7Ah Sealed Maintenace Free Battery

20 each Delivery: 730 days
#44

Supply of following spares 2C x 1.5 sqmm FRLS armoured cable

Supply of following spares 2C x 1.5 sqmm FRLS armoured cable

600 metre Delivery: 730 days
#45

Supply of following spares Multi criteria Detector with inbuilt fault isolator for Bosch make FACP

Supply of following spares Multi criteria Detector with inbuilt fault isolator for Bosch make FACP

20 each Delivery: 730 days
#46

Supply of following spares Control Module with inbuilt fault isolator for Bosch make FACP

Supply of following spares Control Module with inbuilt fault isolator for Bosch make FACP

5 each Delivery: 730 days
#47

Supply of following spares Monitor Module with inbuilt fault isolator for Bosch make FACP

Supply of following spares Monitor Module with inbuilt fault isolator for Bosch make FACP

5 each Delivery: 730 days
#48

Supply of following spares Manual Call Point with inbuilt fault isolator for Bosch make FACP

Supply of following spares Manual Call Point with inbuilt fault isolator for Bosch make FACP

5 each Delivery: 730 days
#49

Supply of following spares Conventional Smoke Detector

Supply of following spares Conventional Smoke Detector

5 each Delivery: 730 days
#50

Supply of following spares Multi-criteria Detector with Fault Isolator Base for Kidde make FACP

Supply of following spares Multi-criteria Detector with Fault Isolator Base for Kidde make FACP

20 each Delivery: 730 days
#51

Supply of following spares Single Input Control Module for Kidde make FACP

Supply of following spares Single Input Control Module for Kidde make FACP

5 each Delivery: 730 days
#52

Supply of following spares Single Action Manual Call Point for Kidde make FACP

Supply of following spares Single Action Manual Call Point for Kidde make FACP

5 each Delivery: 730 days
#53

Supply of following spares Adapter with OP 24 VDC and 1 Amp

Supply of following spares Adapter with OP 24 VDC and 1 Amp

6 each Delivery: 730 days
#54

Supply of following spares Solenoid Valve for Gas Suppression System

Supply of following spares Solenoid Valve for Gas Suppression System

2 each Delivery: 730 days
#55

Supply of following spares Colour Coded Pressure gauge for gas suppression system

Supply of following spares Colour Coded Pressure gauge for gas suppression system

2 each Delivery: 730 days
#56

Supply of following spares Manual Release Switch suitable for existing Gas Suppression Panel

Supply of following spares Manual Release Switch suitable for existing Gas Suppression Panel

2 each Delivery: 730 days
#57

Supply of following spares Manual Abort Switch suitable for existing Gas Suppression Panel

Supply of following spares Manual Abort Switch suitable for existing Gas Suppression Panel

2 each Delivery: 730 days
#58

Supply of following spares Supply of Smoke Detector Testing Kit comprising aerosol dispenser

Supply of following spares Supply of Smoke Detector Testing Kit comprising aerosol dispenser

2 each Delivery: 730 days
#59

Supply of following spares Supply of Smoke Detector Test Aerosol

Supply of following spares Supply of Smoke Detector Test Aerosol

10 each Delivery: 730 days
#60

Supply of following spares Supply of Float switch sensor

Supply of following spares Supply of Float switch sensor

6 each Delivery: 730 days
#61

DSR 2025 E and M Rs 300000

DSR 2025 E and M Rs 300000

300,000 each Delivery: 730 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

Additional Doc 1 (Requested in ATC)

6

Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

7

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Similar Tenders

5 found

Procurement Opportunity: Round the clock Maintenance of Internal and External Electrical installations, Room Air Conditioners, Water Coolers, HVLS Fans, Boom Barrier, Scissor Lift, Sliding Gates etc., at Integrated Air Cargo Complex at Chennai Airport, Chennai for two years in CHENNAI, TAMIL NADU

AAI Cargo Logistics and Allied Services Company Ltd

📍 CHENNAI, TAMIL NADU

EMD: ₹10.1 L
Est: ₹3.4 Cr
⏰ Deadline: 2 weeks left
🛒 Type: Works
View EPROCURE
Urgent

Tender Notice for Providing Round the Clock watch and ward services to ALHW Office and Guest House Complex, including maintenance of Gardens for the year 2026-27. in NICOBARS, ANDAMAN AND NICOBAR ISLANDS

Andaman Lakshadweep Harbour Works

📍 NICOBARS, ANDAMAN AND NICOBAR ISLANDS

EMD: ₹23,168
Est: ₹11.6 L
⏰ Deadline: 3 days left
🛒 Type: Works
View EPROCURE

Government Tender Published for NIET_WBPHE_06_ND_26_27 in NADIA, WEST BENGAL

PHE

📍 NADIA, WEST BENGAL

EMD: ₹57,878
Est: ₹28.9 L
⏰ Deadline: 2 weeks left
🛒 Type: Works
View EPROCURE
Urgent

Contract Bidding Open For WBPHED/EE/AMD/ NIeT-07 of 2026-2027/4 in PASCHIM BARDHAMAN, WEST BENGAL

PHE

📍 PASCHIM BARDHAMAN, WEST BENGAL

EMD: ₹36,800
⏰ Deadline: 4 days left
🛒 Type: Service
View EPROCURE
Urgent

Procurement Opportunity: WBPHED/EE/TD/NIeT_17/2025-2026 (3rd Call) in MEDINIPUR EAST, WEST BENGAL

PHE

📍 MEDINIPUR EAST, WEST BENGAL

EMD: ₹31,770
Est: ₹15.9 L
⏰ Deadline: 4 days left
🛒 Type: Works
View EPROCURE