GEM

Indian Oil Corporation Limited Marketing Division Cylinder Components Tender 2025: Design, Manufacture, Testing at Manufacturer Works, Third-Party Inspection

Bid Publish Date

01-Jan-2026, 10:35 am

Bid End Date

12-Jan-2026, 11:00 am

Value

₹5,87,937

Progress

Issue01-Jan-2026, 10:35 am
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

1

Bid Type

Two Packet Bid

Key Highlights

  • Brand/OEM requirements not specified
  • Technical standards or certifications: Not specified in data
  • Special clauses: 25% quantity/duration adjustment option at contract issue or during execution
  • Eligibility criteria: manufacturing capability for design, test, and supply; third-party inspection readiness
  • Warranty/AMC: not specified
  • Penalties/LD: not specified
  • Delivery/installation: testing at manufacturer works and supply after inspection
  • Payment terms: not disclosed in data

Categories 6

Tender Overview

The Opportunity is issued by the Indian Oil Corporation Limited – Marketing Division for the design, manufacture, testing at manufacturer’s works, inspection by third party, and supply of a Cylinder Stay Plate, Foot Ring and VP Ring Rectification Unit. The project carries an estimated value of ₹587,937 and involves end-to-end fabrication and quality verification, including on-site or off-site testing as per project scope. The procurement emphasizes integrated design-to-supply service with mandatory third-party inspection and compliance to defined technical standards. A notable approval term is the quantity/duration adjustment option up to 25% at contract issuance or during execution. The location details are not disclosed, and the start/end dates are not specified. This tender targets qualified suppliers capable of end-to-end manufacturing, rigorous QA/testing, and timely delivery aligned with IOC’s specifications. The unique differentiator is the combined scope of design, manufacture, testing at origin, and third-party clearance before supply, under a single contract structure, with flexible quantity adjustments.

Technical Specifications & Requirements

  • Product scope includes: Cylinder Stay Plate, Foot Ring, and VP Ring Rectification Unit as described in the title.
  • Engagement covers: design, manufacture, testing at manufacturer works, third-party inspection, and supply into IOC systems.
  • Testing and quality assurance: third-party inspection to validate conformance prior to shipment.
  • Quantity/scale: no BOQ items recorded; potential 25% flexibility on contract quantity/duration.
  • Documentation: essential bid must reflect compliance with internal IOC processes and provide technical compliance data for sheet metal components.
  • The tender emphasizes end-to-end engineering deliverables rather than standalone procurement.

Terms, Conditions & Eligibility

  • Quantity/duration adjustment: up to 25% at contract issue or during execution.
  • EMD information not disclosed in available data; bidders should verify standard IOC EMD requirements.
  • Procurement framework conveys a single contract for design, manufacture, testing, inspection, and supply.
  • No BOQ items available; bidders should prepare to submit design and manufacturing capability documentation.
  • No explicit delivery timeline or payment terms published in the provided data; bidders should seek clarification in tender clarifications.
  • Compliance with third-party inspection processes and quality assurance protocols is mandatory.

Key Specifications

  • Product scope: Cylinder Stay Plate, Foot Ring, VP Ring Rectification Unit

  • Scope of work: design, manufacture, testing at manufacturer works, third-party inspection, supply

  • Testing: third-party inspection prior to shipment

  • Quantity flexibility: contract quantity/duration up to 25%

  • Documentation focus: technical compliance and manufacturing capability data

  • Delivery/installation: to be aligned with IOC requirements (not detailed here)

Terms & Conditions

  • EMD details not disclosed in available data; verify in official tender documents

  • Contract quantity/duration may be adjusted by 25% at issue or during execution

  • Single contract covering design, manufacture, testing, inspection, and supply

  • Third-party inspection is mandatory before supply

  • No BOQ items available; clarify scope and acceptance criteria with IOC

Important Clauses

Payment Terms

Not specified in data; bidders should consult tender documents for advance, milestone, and final payment terms

Delivery Schedule

Not specified; ensure clarity on testing, inspection, and shipment timelines during bid submission

Penalties/Liquidated Damages

Not specified; request clarity on LD/penalty framework in official terms

Bidder Eligibility

  • Manufacturing capability for metal components (design, fabricate, test)

  • Ability to arrange third-party inspection and comply with IOC QA processes

  • Financial capability to undertake a contract valued ~₹5.88 Lakh with potential quantity adjustments

Past Similar Tenders (Historical Results)

5 found

Custom Bid for Services - PROVIDING SERVICES FOR LINE JOBS AND CYLINDER HANDLING WORKS AT JALGAON L

Bharat Petroleum Corporation Ltd

JALGAON, MAHARASHTRA

Posted: 17 May 2025
Closed: 7 June 2025
GEM

Custom Bid for Services - NDT TESTING FIRE WATER TANK,Custom Bid for Services - SCAFFOLDING FOR THI

Hindustan Petroleum Corporation Ltd

SURAT, GUJARAT

Posted: 3 July 2025
Closed: 14 July 2025
GEM

Custom Bid for Services - HANDLING OF CYLINDER

Hindustan Petroleum Corporation Ltd

KOLKATA, WEST BENGAL

Posted: 7 October 2025
Closed: 22 October 2025
GEM

Custom Bid for Services - Works-contract for Fitting, welding, finishing, dye penetrant testing, ai

Bharat Heavy Electricals Limited (bhel)

BHOPAL, MADHYA PRADESH

Posted: 23 June 2025
Closed: 7 July 2025
GEM

Custom Bid for Services - Fabrication, Supply, Installation and testing of SS tanks, its pipping as

Bhabha Atomic Research Centre

MUMBAI, MAHARASHTRA

Posted: 11 September 2025
Closed: 20 October 2025
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST certificate

2

PAN card

3

Experience certificates (relevant manufacturing/design experience)

4

Financial statements (last 2-3 years)

5

EMD/Security deposit (as per IOC terms) - ensure submission mechanism

6

Technical bid documents illustrating design/manufacture capability

7

OEM authorizations (if subcontracting components)

8

Quality/ISO or equivalent certifications (if available)

Frequently Asked Questions

How to bid for IOC cylinder components tender in 2025?

Bidders should submit technical and financial bids with GST, PAN, and experience certificates, plus OEM authorizations if needed. Ensure third-party inspection capability and design/manufacture/testing commitments. The contract may allow up to 25% quantity/duration adjustments; clarify EMD and payment terms in the bid.

What documents are required for IOC Marketing Division procurement bids?

Required documents include GST certificate, PAN, last 2-3 years financial statements, experience certificates for relevant manufacturing, EMD/submission proof, technical compliance data, and OEM authorizations if subcontracting any part. Attach QA certifications if available.

What are the technical specifications for cylinder components in this IOC tender?

The scope includes Cylinder Stay Plate, Foot Ring, and VP Ring Rectification Unit with design/manufacture/testing at manufacturer works and third-party inspection. Exact material grades or dimensional specs are not provided; request detailed drawings and QA reports during bid clarification.

When is the bid submission deadline for this IOC procurement?

The official deadline is not disclosed in the provided data. Bidders should monitor IOC tender portal for updates and submit requests for extension if needed. Ensure readiness with all mandatory documents and QMS records before the closing date.

What are the EMD requirements for IOC cylinder components bid 2025?

EMD details are not specified in the extracted data. Bidders must verify the exact EMD amount, format (DD/online), and validity with IOC procurement terms and include the EMD document in the bid submission.

What is the scope of third-party inspection in IOC tender for cylinder parts?

A third-party inspection is mandatory to validate conformance before shipment. The bidder should provide inspection agency details, scope of inspection, and acceptance criteria aligned with IOC QA standards and any IS/ISO requirements specified in the tender.

How does the 25% quantity adjustment clause affect IOC bids for 2025?

The buyer may increase or decrease contract quantity or duration by up to 25% at contract issue, and the bidder must accept revised quantity or duration. Plan production and inventory accordingly with flexible scheduling and procurement plans.

What are the payment terms for IOC supplier contracts for cylinder parts?

Payment terms are not stated in the provided data. Bidders should seek explicit terms during clarification and ensure alignment with milestone-based payments and acceptance after third-party inspection, as applicable to the contract.

Similar Tenders

1 found
Urgent

Bhilai Steel Plant Custom Services Tender Durg Chhattisgarh 2025 - Removal, Cleaning & Installation of Gas/Oil Coolers for Compressors

Bhilai Steel Plant

📍 DURG, CHHATTISGARH

Est: ₹93.3 L
⏰ Deadline: 1 day left
🛒 Type: Service
View GEM

Explore More Opportunities

Quick Access