Fiber Cable 6 Core,Rack Mount LIU 24 Port,Rack Mount LIU 12 Port,Fiber Patch Cord LC to LC Core Swi
Indian Army
PUNE, MAHARASHTRA
Bid Publish Date
13-Oct-2025, 10:50 am
Bid End Date
15-Dec-2025, 5:00 pm
EMD
₹8,00,000
Value
₹8,00,00,000
Location
Progress
RAQuantity
553651
Category
Wireless Access Point (V2)
Bid Type
Two Packet Bid
A tender has been published for Chhatrapati Shahu Ji Maharaj University Kanpur Layer 2 Access Switch (V2) (Q2), Wireless Access Point (V2) (Q2), Networking / Server Rack (Q2), Small Form - Factor Pluggable Transceiver (Q2), Cat6 4pair UTP cable 305mtr in one box, Cat6 4pair UTP Outdoor cable 305mtr in one box, Information Outlet Cat 6, Face Plate with Gang box, 1 Meter UTP CAT 6 Patch Cord, 3 Meter UTP CAT 6Patch Cord, 24 Port CAT6 Patch Panel Fully Loaded, Single Mode fiber 24 core Armored UniTube, 12 Port Fibre Optic LIU Fully Loaded, 24 Port Fibre Optic LIU Fully Loaded, Fibre Patch Cord SC-LC SM, Duplex 2 meter, Online UPS 1 KVA with minumum 15 minutes backup, HDPE Pipe 40MM, 105x50mm DLP Raceway with accessories, 80x50mm DLP Raceway with accessories, 32 mm PVC Heavy Conduit with accessories ISI Mark, 40 mm PVC Heavy Casing with accessories ISI Mark, Flexible Pipe 25 40 mm, Laying of UTP Cable in Raceway Conduit Casing HDPE, Installation and Termination of I O User Side including I O punching, labelling and testing, Installation of Jack Panel including I O punching, labelling and testing, Installation of Face Plate and Gang Box including I O punching, labelling and testing, Trenching for outdoor UTP cables as per instructions including digging, Laying of HDPE pipes as per laying instructions for outdoor UTP cables including 32 40 mm HDPE pipe, Laying of Fibre Cable in HDPE pipes as per laying instructions including HDR drilling, HDPE pipe, fibre pulling, route markers, pits etc. , Digging the Concrete and Road Cutting, Supply and Installation 2 inch GI Pole for the Outdoor Access Point, Installation of Rack 32 15 9U, Installation of LIU including 26 Splicing, Installation of Switch, Installation of Access Point, Onsite Network Engineer for 5 Year Support, Construction of Huts as per design provided in KANPUR NAGAR, UTTAR PRADESH. Quantity: 553651 by. Submission Deadline: 15-12-2025 17: 00: 00. Check eligibility and apply.
Main Document
GEM_CATEGORY_SPECIFICATION
GEM_CATEGORY_SPECIFICATION
GEM_CATEGORY_SPECIFICATION
GEM_CATEGORY_SPECIFICATION
GEM_CATEGORY_SPECIFICATION
GEM_CATEGORY_SPECIFICATION
GEM_CATEGORY_SPECIFICATION
GEM_CATEGORY_SPECIFICATION
BOQ
BOQ
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
PUNE, MAHARASHTRA
Hqids
BHOPAL, MADHYA PRADESH
Upid Web Portal - Irrigation Department
LUCKNOW, UTTAR PRADESH
Indian Army
TIRUVALLUR, TAMIL NADU
Indian Council Of Agricultural Research (icar)
KOZHIKODE, KERALA
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Cat6 4pair UTP cable 305mtr in one box | University Network Project As per Specification1 | 180,190 | mtr | csjmuhimanshu | 30 |
| 2 | Cat6 4pair UTP Outdoor cable 305mtr in one box | University Network Project As per Specification2 | 11,150 | mtr | csjmuhimanshu | 30 |
| 3 | Information Outlet Cat 6 | University Network Project As per Specification3 | 2,838 | nos | csjmuhimanshu | 30 |
| 4 | Face Plate with Gang box | University Network Project As per Specification4 | 2,838 | nos | csjmuhimanshu | 30 |
| 5 | 1 Meter UTP CAT 6 Patch Cord | University Network Project As per Specification5 | 2,838 | nos | csjmuhimanshu | 30 |
| 6 | 3 Meter UTP CAT 6Patch Cord | University Network Project As per Specification6 | 2,838 | nos | csjmuhimanshu | 30 |
| 7 | 24 Port CAT6 Patch Panel Fully Loaded | University Network Project As per Specification7 | 136 | nos | csjmuhimanshu | 30 |
| 8 | Single Mode fiber 24 core Armored UniTube | University Network Project As per Specification8 | 13,800 | mtr | csjmuhimanshu | 30 |
| 9 | 12 Port Fibre Optic LIU Fully Loaded | University Network Project As per Specification10 | 34 | nos | csjmuhimanshu | 30 |
| 10 | 24 Port Fibre Optic LIU Fully Loaded | University Network Project As per Specification9 | 46 | nos | csjmuhimanshu | 30 |
| 11 | Fibre Patch Cord SC-LC SM, Duplex 2 meter | University Network Project As per Specification11 | 79 | nos | csjmuhimanshu | 30 |
| 12 | Online UPS 1 KVA with minumum 15 minutes backup | University Network Project As per Specification18 | 31 | nos | csjmuhimanshu | 30 |
| 13 | HDPE Pipe 40MM | University Network Project As per Specification12 | 15,550 | mtr | csjmuhimanshu | 30 |
| 14 | 105x50mm DLP Raceway with accessories | University Network Project As per Specification13 | 2,500 | mtr | csjmuhimanshu | 30 |
| 15 | 80x50mm DLP Raceway with accessories | University Network Project As per Specification14 | 2,000 | mtr | csjmuhimanshu | 30 |
| 16 | 32 mm PVC Heavy Conduit with accessories ISI Mark | University Network Project As per Specification15 | 21,460 | mtr | csjmuhimanshu | 30 |
| 17 | 40 mm PVC Heavy Casing with accessories ISI Mark | University Network Project As per Specification16 | 51,950 | mtr | csjmuhimanshu | 30 |
| 18 | Flexible Pipe 25 40 mm | University Network Project As per Specification17 | 2,710 | mtr | csjmuhimanshu | 30 |
| 19 | Laying of UTP Cable in Raceway Conduit Casing HDPE | University Network Project As per Specification19 | 191,340 | mtr | csjmuhimanshu | 30 |
| 20 | Installation and Termination of I O User Side including I O punching,labelling and testing | University Network Project As per Specification20 | 2,838 | nos | csjmuhimanshu | 30 |
| 21 | Installation of Jack Panel including I O punching, labelling and testing | University Network Project As per Specification21 | 136 | nos | csjmuhimanshu | 30 |
| 22 | Installation of Face Plate and Gang Box including I O punching, labelling and testing | University Network Project As per Specification22 | 2,838 | nos | csjmuhimanshu | 30 |
| 23 | Trenching for outdoor UTP cables as per instructions including digging | University Network Project As per Specification23 | 11,150 | mtr | csjmuhimanshu | 30 |
| 24 | Laying of HDPE pipes as per laying instructions for outdoor UTP cables including 32 40 mm HDPE pipe | University Network Project As per Specification24 | 15,550 | mtr | csjmuhimanshu | 30 |
| 25 | Laying of Fibre Cable in HDPE pipes as per laying instructions including HDR drilling, HDPE pipe, fibre pulling, route markers, pits etc. | University Network Project As per Specification25 | 13,800 | mtr | csjmuhimanshu | 30 |
| 26 | Digging the Concrete and Road Cutting | University Network Project As per Specification26 | 2,000 | mtr | csjmuhimanshu | 30 |
| 27 | Supply and Installation 2 inch GI Pole for the Outdoor Access Point | University Network Project As per Specification27 | 13 | nos | csjmuhimanshu | 30 |
| 28 | Installation of Rack 32 15 9U | University Network Project As per Specification28 | 34 | nos | csjmuhimanshu | 30 |
| 29 | Installation of LIU including 26 Splicing | University Network Project As per Specification29 | 80 | nos | csjmuhimanshu | 30 |
| 30 | Installation of Switch | University Network Project As per Specification30 | 90 | nos | csjmuhimanshu | 30 |
| 31 | Installation of Access Point | University Network Project As per Specification31 | 295 | nos | csjmuhimanshu | 30 |
| 32 | Onsite Network Engineer for 5 Year Support | University Network Project As per Specification32 | 2 | manpower | csjmuhimanshu | 30 |
| 33 | Construction of Huts as per design provided | University Network Project As per Specification33 | 2 | nos | csjmuhimanshu | 30 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC)
Additional Doc 4 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Extended Deadline
15-Dec-2025, 5:00 pm
Opening Date
15-Dec-2025, 5:30 pm
Extended Deadline
03-Dec-2025, 5:00 pm
Opening Date
03-Dec-2025, 5:30 pm
Extended Deadline
28-Nov-2025, 5:00 pm
Opening Date
28-Nov-2025, 5:30 pm
Extended Deadline
25-Nov-2025, 5:00 pm
Opening Date
25-Nov-2025, 5:30 pm
Extended Deadline
15-Nov-2025, 6:00 pm
Opening Date
15-Nov-2025, 6:30 pm
Extended Deadline
12-Nov-2025, 5:00 pm
Opening Date
12-Nov-2025, 5:30 pm
Extended Deadline
05-Nov-2025, 5:00 pm
Opening Date
05-Nov-2025, 5:30 pm
Start
01-Feb-2026, 3:00 pm
End
04-Feb-2026, 1:45 pm
Duration: 71 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
Sign up now to access all documents
Main Document
GEM_CATEGORY_SPECIFICATION
GEM_CATEGORY_SPECIFICATION
GEM_CATEGORY_SPECIFICATION
GEM_CATEGORY_SPECIFICATION
GEM_CATEGORY_SPECIFICATION
GEM_CATEGORY_SPECIFICATION
GEM_CATEGORY_SPECIFICATION
GEM_CATEGORY_SPECIFICATION
BOQ
BOQ
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS