Drone Propeller with arms,Drone Battery,Drone Battery Charging Hub,Drone Carry Bag,Drone Flying Con
Indian Army
EAST SIKKIM, SIKKIM
Progress
Quantity
37
Category
Muscle Memory Drone
Bid Type
Single Packet Bid
The Indian Army, Department Of Military Affairs, located in Ambala, Haryana, invites bids for a procurement package including Muscle Memory Drone, Camera Forward-Lacing/FPV Drone, Connectors, Battery Strip, and Canopy. The BOQ lists 5 items, but exact quantities and values are not disclosed. The tender emphasizes a flexible quantity option of up to 25% more than the bid quantity and a similar extension during contract currency at contracted rates. Bidders should consider the extended delivery time formula and ensure alignment with the purchaser’s original and extended delivery periods. This opportunity targets suppliers capable of delivering advanced aerial platforms and associated components within the specified regulatory framework. The ATC document indicates additional terms apply; bidders must review the uploaded ATC for compliance nuances. Unique aspects include the explicit option clause and a delivery-time calculation method, which influences project scheduling and risk planning.
Product names: Muscle Memory Drone, Camera FPR Drone, Connectors, Battery Strip, Canopy
BOQ items: 5 entries (quantities not disclosed in data)
Estimated value: not disclosed
EMD: not disclosed in tender data
Delivery: linked to original and extended periods per option clause
Standards/certifications: ATC may specify; review for IS/ISO requirements
Quality: no explicit performance metrics provided in data
25% quantity variation permitted during contract and currency at contracted rates
Delivery period extensions calculated with a minimum 30 days
ATC document governs additional terms and certifications; review mandatory
Purchaser may adjust order quantity by up to 25% at contract award and during currency at contracted rates.
Extended delivery time = (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.
Buyer uploaded ATC; bidders must view for additional standard, certification, or compliance requirements.
Experience in supplying drone systems or defense equipment to government or large entities
Compliance with reviewed ATC terms and any required certifications
Financial capacity evidenced by recent financial statements
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
EAST SIKKIM, SIKKIM
Indian Army
UDHAMPUR, JAMMU & KASHMIR
Indian Army
AMRITSAR, PUNJAB
Indian Army
BARAMULLA, JAMMU & KASHMIR
Indian Army
DODA, JAMMU & KASHMIR
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Muscle Memory Drone | same | 29 | nos | varunsampath | 16 |
| 2 | Camera FPR Drone | same | 2 | nos | varunsampath | 16 |
| 3 | Connectors | same | 2 | nos | varunsampath | 16 |
| 4 | Battery Strip | same | 3 | nos | varunsampath | 16 |
| 5 | Canopy | same | 1 | nos | varunsampath | 16 |
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates (similar drone/defense equipment supply)
Financial statements for last 2-3 years
EMD/Security deposit submission details (if required per ATC)
Technical bid documents demonstrating product compliance
OEM authorization letters (if bidding as an authorized dealer)
Any certifications specified in ATC (e.g., safety, quality standards)
Extended Deadline
05-Mar-2026, 9:00 am
Opening Date
05-Mar-2026, 9:30 am
Key insights about HARYANA tender market
Bidders should review the ATC for the Indian Army drone procurement in Ambala, confirm EMD requirements (if any), ensure GST/PAN compliance, and prepare bid documents including OEM authorizations, financials, and technical compliance certificates. The 25% quantity option affects planning and pricing strategy.
Prepare GST registration, PAN, 2-3 years financial statements, experience certificates for similar defense projects, OEM authorization letters, technical bid, and any ATC-stipulated certifications. Ensure compliance with delivery and payment terms as per ATC.
Delivery starts from the last date of the original delivery order with possible extensions if the option clause is invoked. Extended delivery time uses the formula (increased quantity/original quantity) × original delivery period, minimum 30 days.
EMD amount is not disclosed in the published tender data; bidders should verify the exact figure and submission method (DD/online) through the ATC or tender portal guidance.
The BOQ lists five items: Muscle Memory Drone, Camera FPV Drone, Connectors, Battery Strip, and Canopy. Quantities and unit details are not provided in the data and must be confirmed via the ATC.
Review the ATC for any standards such as IS/ISO certifications, safety, and quality requirements. The tender data does not specify exact standards; compliant bidders should align with typical defense equipment certifications.
Submit technical bid documents showing product compliance, OEM authorizations, and past performance on similar projects. Include delivery plans, risk mitigation, and a clear mapping to the five items: Muscle Memory Drone, Camera FPV Drone, Connectors, Battery Strip, Canopy.
The 25% option allows adjustments at contract award and during currency, potentially changing total value. Bidders should model pricing for increased/decreased volumes and ensure lead times meet the extended delivery windows defined by the formula.
Indian Army
📍 PUNE, MAHARASHTRA
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS