Urban Development Department Uttar Pradesh Submersible Pump Set Tender BUDAUN 2026 IS 8034:2018 ISI Marked
N/a
BUDAUN, UTTAR PRADESH
Bid Publish Date
30-Jan-2026, 12:40 pm
Bid End Date
16-Feb-2026, 5:00 pm
Value
₹3,93,100
Location
Progress
Quantity
1
Bid Type
Two Packet Bid
Organization: E-municipalities - Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh; Product: Submersible Pump Set (Three Phase) as per IS 8034:2018 with ISI Marked designation; Estimated Value: ₹393,100.00; Location: Uttar Pradesh; Delivery/Scope: IS 8034:2018 compliant pump set with motor rating, control panel, and discharge performance metrics. Unique terms include a 25% quantity option and bulk-supply advance sample approvals within 5 days of award. Key differentiator: explicit ISI/standard compliance, energy rating indicator, and OEM turnover criteria. Tender targets UP urban development procurement for essential water-pumping infrastructure.
Product: Submersible pump set (Three Phase) as per IS 8034:2018
Standards: IS 8034:2018; ISI marking required
Electrical: Motor rating; maximum current at rated voltage/frequency
Control panel: Starter, ISI marked MCB/main switch, ammeter, voltmeter, water level indicator, single-phase preventer
Performance: Discharge capacity (LPH); Discharge head
Energy rating: BEE Energy Star Rating (0 if not applicable)
50-25% quantity variation rights during contract and currency
Advance sample approval within 5 days of contract award
Turnover criteria for bidder and OEM with required documentation
Not detailed in data; verify in final bid terms and conditions
Delivery period linked to original order; extended period rules apply with 30-day minimum guidance
Not specified here; confirm LD provisions in final tender documentation
Minimum 3 years turnover history with audited statements or CA/CMA certificate
OEM turnover criteria satisfied for the offered pump model
Compliance with IS 8034:2018 and ISI marking; advanced sample submission within 5 days
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
N/a
BUDAUN, UTTAR PRADESH
E-municipalities - Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh
BULANDSHAHR, UTTAR PRADESH
E-municipalities - Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh
BULANDSHAHR, UTTAR PRADESH
E-municipalities - Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh
CHANDAULI, UTTAR PRADESH
E-municipalities - Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh
CHANDAULI, UTTAR PRADESH
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| GENRIC | Product ISI Marked | No |
| CONSTRUCTION | Motor rating | 22.0 |
| CONSTRUCTION | Maximum current at rated voltage and frequency | 57.0 |
| CONSTRUCTION | Control Pannel with starter,ISI marked MCB /main switch,ammeter,voltmeter and water level indicator and single phase preventer | No |
| PERFORMANCE | Discharge capacity (LPH) | 136800 |
| PERFORMANCE | Discharge Head | 42.0 |
| PERFORMANCE | BEE Energy Star Rating (Hint: In case star rating is not applicable please select "0") | 3, 4, 5, 0 Or higher |
Discover companies most likely to bid on this tender
GST registration certificate
PAN card copies
Audited financial statements for last 3 years or CA/CMA turnover certificate
OEM authorization (if applicable)
Experience certificates for similar pump supply projects
Technical bid documents demonstrating ISI 8034:2018 compliance
Advance sample submission confirmation and test reports (within 5 days of award)
Extended Deadline
12-Feb-2026, 1:00 pm
Opening Date
12-Feb-2026, 1:30 pm
Key insights about UTTAR PRADESH tender market
Bidders must meet turnover criteria for last 3 years, provide audited statements or CA/CMA certificate, and demonstrate IS 8034:2018 compliance with ISI marking. Submit OEM authorization if necessary, and provide advance pump samples within 5 days of award for buyer approval.
Required documents include GST and PAN, 3-year turnover proof (audited or CA/CMA), OEM authorization, experience certificates for similar projects, ISI/8034:2018 compliance certificates, and advance sample submission confirmation with test data.
Pumps must be ISI marked and IS 8034:2018 compliant; three-phase motor with specified motor rating and maximum current, control panel with starter, ISI marked MCB, ammeter, voltmeter, water level indicator, and single-phase preventer; performance metrics include discharge capacity and head with energy rating as applicable.
Quantity may vary up to 25% at contract placement and during the contract period. Delivery period rules reference original delivery plus extended time calculations; minimum extension is 30 days, with adjustments based on extended quantities.
Within 5 days of contract award, the bidder must submit advance samples for buyer approval. Buyer may approve or require modifications before bulk manufacturing, ensuring adherence to contract specifications.
BEE Energy Star Rating is required where applicable; if not applicable, the tender specifies a rating of 0. Ensure documentation indicates energy efficiency details or justification if rating is not available.
The OEM must meet the minimum average annual turnover over the last 3 years as per bid documents; in bunch bids, the OEM for the highest bid value must satisfy this criterion with audited statements or CA/CMA certificates.
Specific LD provisions are not provided here; bidders should review the final tender terms for LD rates, caps, and payment penalties tied to delays, including delivery commencement rules and calculation methods.
N/a
📍 BUDAUN, UTTAR PRADESH
E-nagar Palika Government Of Madhya Pradesh
📍 RAISEN, MADHYA PRADESH
Modern Coach Factory Raebareli
East Central Railway
📍 DHANBAD, JHARKHAND
E-municipalities - Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh
Sign up now to access all documents
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS