TenderDekho Logo
GEM

Procurement Opportunity: Supply of VRF ductable air conditioner outdoor unit with inverter scroll Refer details as per Speci in BANGALORE, KARNATAKA

Bid Publish Date

08-Oct-2025, 2:13 pm

Bid End Date

27-Oct-2025, 2:00 pm

EMD

₹75,000

Latest Corrigendum Available

Progress

Issue08-Oct-2025, 2:13 pm
Corrigendum22-Oct-2025
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

15

Category

Supply of VRF ductable air conditioner outdoor unit with inverter scroll Refer details as per Specification

Bid Type

Two Packet Bid

Categories 43

Hindustan Aeronautics Limited (hal) has released a public tender for Supply of VRF ductable air conditioner outdoor unit with inverter scroll Refer details as per Specification, VRF Ductable Split unit Refer details as per specification, Supply of AHU communication kit and expansion kit suitable for 32 HP outdoor unit Refer details as per specification, if required for connection of indoor and outdoor unit as per site condition Refer details as per specification, Installation of double skin floor mounted air handling units details as per Specification, Copper Piping as per site condition Refer details as per Specification, Commissioning of of suitable rating as per site requirement Refer details as per specification, CPVC Dreain Pipe as per site condition Refer details as per Specification, Welding work Refer details as per Specification, Cable Tray GI perforated cable tray with cover for piping work Refer details as per Specification, N2 Pressure Vaccuming and commissioning Refer details as per Specification, Gas Charging Refer details as per Specification, Power Cable as per site requirement Refer details as per specification, Ducting work Refer details as per specification in BANGALORE, KARNATAKA. Quantity: 15. Submission Deadline: 27-10-2025 14: 00: 00. Download documents and apply online.

Documents 6

GeM-Bidding-8443937.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

High performance heating elements as per item 1 of attched specification document,Meter module anal

North East Frontier Railway

KARBI ANGLONG, ASSAM

Posted: 24 July 2025
Closed: 14 August 2025
GEM

Supply, Installation and Commissioning of Package Air Conditioners as per detailed specification

Hindustan Aeronautics Limited (hal)

KORAPUT, ODISHA

Posted: 30 May 2025
Closed: 20 June 2025
GEM

Supply, installation, testing and commissioning of Air dryer as per detailed Specification

Hindustan Aeronautics Limited (hal)

KORAPUT, ODISHA

Posted: 28 July 2025
Closed: 20 August 2025
GEM

2 HP starters as per item 1 of attached specification document,Three phase 5 HP starter as per item

North East Frontier Railway

KARBI ANGLONG, ASSAM

Posted: 11 September 2025
Closed: 3 October 2025
GEM

Wall Paneling,Embeded glass panel,PVC Flooring for OT as per tender specification,Laminar Air Flow,

Banaras Locomotive Works

VARANASI, UTTAR PRADESH

Posted: 29 September 2025
Closed: 14 October 2025
GEM

Bill of Quantities (BOQ) 14 Items

Item # Title Description Quantity Unit Consignee Delivery (Days)
1 Supply of VRF ductable air conditioner outdoor unit with inverter scroll Refer details as per Specification Supply of VRF ductable air conditioner outdoor unit with inverter scroll Refer details as per Specification 2 number con_plng_stores 90
2 VRF Ductable Split unit Refer details as per specification VRF Ductable Split unit Refer details as per specification 1 lot con_plng_stores 90
3 Supply of AHU communication kit and expansion kit suitable for 32 HP outdoor unit Refer details as per specification Supply of AHU communication kit and expansion kit suitable for 32 HP outdoor unit Refer details as per specification 1 lot con_plng_stores 90
4 if required for connection of indoor and outdoor unit as per site condition Refer details as per specification if required for connection of indoor and outdoor unit as per site condition Refer details as per specification 1 lot con_plng_stores 90
5 Installation of double skin floor mounted air handling units details as per Specification Installation of double skin floor mounted air handling units details as per Specification 1 lot con_plng_stores 90
6 Copper Piping as per site condition Refer details as per Specification Copper Piping as per site condition Refer details as per Specification 1 lot con_plng_stores 90
7 Commissioning of of suitable rating as per site requirement Refer details as per specification Commissioning of of suitable rating as per site requirement Refer details as per specification 1 lot con_plng_stores 90
8 CPVC Dreain Pipe as per site condition Refer details as per Specification CPVC Dreain Pipe as per site condition Refer details as per Specification 1 lot con_plng_stores 90
9 Welding work Refer details as per Specification Welding work Refer details as per Specification 1 lot con_plng_stores 90
10 Cable Tray GI perforated cable tray with cover for piping work Refer details as per Specification Cable Tray GI perforated cable tray with cover for piping work Refer details as per Specification 1 lot con_plng_stores 90
11 N2 Pressure Vaccuming and commissioning Refer details as per Specification N2 Pressure Vaccuming and commissioning Refer details as per Specification 1 lot con_plng_stores 90
12 Gas Charging Refer details as per Specification Gas Charging Refer details as per Specification 1 lot con_plng_stores 90
13 Power Cable as per site requirement Refer details as per specification Power Cable as per site requirement Refer details as per specification 1 lot con_plng_stores 90
14 Ducting work Refer details as per specification Ducting work Refer details as per specification 1 lot con_plng_stores 90

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Certificate (Requested in ATC)

2

OEM Authorization Certificate *In case any bidder is seeking exemption from Experience / Turnover Criteria

3

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum Updates

1 Update
#1

Update

22-Oct-2025

Extended Deadline

27-Oct-2025, 2:00 pm

Opening Date

27-Oct-2025, 2:30 pm