MT ITEMS 1,MT ITEMS 2,MT ITEMS 3,MT ITEMS 4,MT ITEMS 5,MT ITEMS 6,MT ITEMS 7,MT ITEMS 8
Indian Army
Bid Publish Date
21-Feb-2026, 2:38 pm
Bid End Date
03-Mar-2026, 3:00 pm
EMD
₹3,100
Progress
Quantity
429
Category
MT ITEMS 1
Bid Type
Two Packet Bid
Organization: Indian Army, Department Of Military Affairs. Procurement: Supply of goods for MT ITEMS 1 through MT ITEMS 8, 8 total items with unspecified quantities. EMD: ₹3,100. Inspection: Post-receipt inspection at consignee site by the Station Board of Officer; pre-dispatch inspection not mandatory unless specified. Scope: Only supply of goods; advance sample approval required within 10 days of contract award, with modifications communicated within 10 days. Payment/Delivery: Delivery period to be fixed upon sample approval; failure to approve may delay. Bid submission: EMD can be submitted as Fixed Deposit Receipt (FDR) in the name of THE COMMANDANT 11 FOD; hardcopy to be delivered within 5 days of bid end/open. Unique clause: if buyer delays sample approval, delivery period is adjusted without LD.
Product category: MT ITEMS 1 to MT ITEMS 8 (no explicit item-level specs provided)
Quantity: Not specified in BoQ (N/A for all items)
EMD: ₹3,100 (FDR allowed)
Inspection: Post-receipt inspection at consignee site by Station Board of Officer
Advance sample: 10 days for submission and 10 days for buyer feedback
Delivery: Period to be fixed post-sample approval; delay without LD for buyer sample approval delay
Formation of EMD/BSG: FDR pledged in name of THE COMMANDANT 11 FOD
Advance sample approval required within 10 days of award with 10-day modification cycle
Post-receipt inspection by Station Board of Officer; no pre-dispatch inspection unless ATC
EMD ₹3,100 with FDR/BDR options; hardcopy of documents due within 5 days
Delivery period to be fixed after sample approval; delays due to buyer sample approval incur no LD
Only supply of goods; no installation/service scope explicitly stated
No explicit payment schedule; bulk payment contingent on conformance to approved sample and contract terms after sample approval
Delivery timeline to be set post-advance sample approval; if buyer delays, delivery period adjusted without LD
No LD defined in the data; penalties to be governed by contract for deviations from approved sample
Eligibility to supply goods to Indian Army under GeM terms
Ability to furnish FDR-based EMD and provide hardcopy delivery within 5 days
Capability to perform post-receipt inspection at consignee site
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
Indian Army
Indian Army
Indian Army
Indian Army
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | MT ITEMS 1 | LV7/T-815 443-400-143-000 SPEEDOMETER | 137 | nos | lp1@11fod | 30 |
| 2 | MT ITEMS 2 | LV7/TATA DLD-NNK-11-6 RUBBER PACKING MAIN HOLE COVER | 49 | nos | lp1@11fod | 30 |
| 3 | MT ITEMS 3 | LV7/TATA DLD-NNK-3-34 SPANNER ADJUSTABLE 300MM | 89 | nos | lp1@11fod | 30 |
| 4 | MT ITEMS 4 | LV7/TATA DLD-NNK-17-18 STAINLESS STEEL BRUSH 5CM WIDTHX20CM WIT | 63 | nos | lp1@11fod | 30 |
| 5 | MT ITEMS 5 | LV7/TATA 257454107503 RUBBER CAP/(FOR ATT TERMINAL AND LUG) | 25 | nos | lp1@11fod | 30 |
| 6 | MT ITEMS 6 | LV7/TATA 257454108205 DOUBLE CLAMP (CABLE) | 21 | nos | lp1@11fod | 30 |
| 7 | MT ITEMS 7 | LV7/TATA 278614609201 WASHER | 20 | nos | lp1@11fod | 30 |
| 8 | MT ITEMS 8 | LV7/TATA 3223370380 SEALING RING | 25 | nos | lp1@11fod | 30 |
Discover companies most likely to bid on this tender
GST certificate
PAN card
Experience certificates (if any) related to prior goods supply
Financial statements or solvency proof
EMD submission proof (FDR or online payment receipt)
Technical bid documents (if applicable)
OEM authorizations or supplier confirmation (if required by buyer)
Any product certificates or compliance documents related to ‘goods supply’
Bidders must submit EMD ₹3,100 via acceptable forms (including FDR) and provide proof of submission. Prepare advance sample within 10 days of award, and respond to buyer modifications within 10 days. Post-receipt inspection will be conducted by the Station Board of Officer at the consignee site.
Required documents include GST certificate, PAN card, experience certificates, financial statements, EMD proof (FDR or online), technical bid (if applicable), OEM authorizations, and any product compliance certificates. Ensure hardcopy EMD reaches within 5 days after bid end date.
EMD amount is ₹3,100 and may be submitted as Fixed Deposit Receipt pledged in the name of THE COMMANDANT 11 FOD. Upload scanned copy of the FDR with bid and deliver the hardcopy to the buyer within 5 days of bid end/open.
Advance sample must be submitted within 10 days of contract award. The buyer will approve or request modifications within 10 days; if delayed by the buyer, the delivery period is reset without LD.
Post-receipt inspection is mandatory at the consignee site by the Station Board of Officer. Pre-dispatch inspection is not required unless specifically selected in ATC. Bulk supply must conform to the approved sample after inspection.
Scope is limited to the supply of goods; no installation or ancillary services are specified in the tender data. Quantities are not provided in the BoQ (N/A).
If the buyer delays, the delivery period is reset without liquidated damages. The supplier must adjust timelines to reflect the period of approval delay and continue to meet contract specifications.
No item-level standards are specified in the tender data. Bidders should rely on standard military procurement practices and provide any applicable OEM authorizations, GST, and quality certificates as required by the buyer.
Indian Army
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS