Shade Net House
Directorate Of Horticulture,jammu
JAMMU, JAMMU & KASHMIR
Bid Publish Date
04-Jul-2026, 7:30 pm
Bid End Date
13-Jul-2026, 6:00 pm
Location
Progress
Quantity
400
Bid Type
Two Packet Bid
The Director General Of National Cadet Corps (dgncc) seeking a complete Shade Net House solution in COOCH BEHAR, WEST BENGAL with integrated fogging and drip irrigation. Scope includes supply, installation, testing, commissioning, operator training, and statutory clearances where applicable. Key features include a complete structure package with anti-leak foggers, ISI-mark water tank, IS 4985 IS 13488 compliant piping, and LLDPE laterals. Estimated value and EMD are not disclosed, but the contract emphasizes comprehensive delivery, quality assurance, and onsite support. A 25% quantity option during contract execution is explicitly allowed, with extended delivery timelines calculated proportionally and minimum 30 days. Unique requirement: 95% transparency and a mandatory sample submission prior to participation. This tender targets suppliers capable of turnkey completion from foundation to final commissioning, including training and documentation.
Shade Net House with IS 4985/IS 13488 compliant drip irrigation components
Fogging system including overhead foggers, motor, pressure meter, control valve, flush valve, ISI water tank and filtration
Foundation/Civil works included
Ante room with interior sliding door and exterior hinge door with locking
Zig-Zag spring net locking in aluminium profiles
25% quantity variation allowed during contract; extended delivery with proportional timeline
Turnkey scope: supply, installation, testing, commissioning, operator training, and statutory clearances
Mandatory pre-participation sample submission and 95% transparency
IS/ISI-compliant components for fogging and irrigation; IS 4985/13488 referenced
Payment terms not specified; bidders should anticipate standard government practice and negotiate with purchaser per contract, with clarity on milestones after commissioning.
Delivery period may be extended by up to 25% for additional quantity; minimum extension time is 30 days; schedule tied to last date of original/delivered orders.
Penalties/LDs to be defined in final contract; ensure compliance with delivery timelines and quality benchmarks; clause implies potential financial remedies for delays or non-conformities.
Experience in supply, installation, testing, and commissioning of shade net houses or agricultural net structures
Demonstrated capability for fogging and drip irrigation integration with ISI/IS 4985/13488 standards
Financial stability evidenced by recent financial statements and adequate capitalization
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Shade Net House (Q3)
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
GEM_CATEGORY_SPECIFICATION
GEM_GENERAL_TERMS_AND_CONDITIONS
Directorate Of Horticulture,jammu
JAMMU, JAMMU & KASHMIR
Indian Army
JAISALMER, RAJASTHAN
Indo Tibetan Border Police (itbp)
SRINAGAR, JAMMU & KASHMIR
N/a
AHMEDABAD, GUJARAT
Directorate Of Horticulture
SURENDRA NAGAR, GUJARAT
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| GENERIC | Product description | A Shade house is a structure enclosed by agro nets or any other woven material to allow required sunlight, moisture and air to pass through the gaps |
| GENERIC | Required / Offered size in the range of | 200 square meter to 560 square meter |
| GENERIC | Shape | Flat Shape |
| GENERIC | Bays width | 8 Meter x 4 Meter |
| GENERIC | Corridor size | 2 Meter |
| GENERIC | Side height | 3 Meter |
| GENERIC | Center height | 4 Meter |
| GENERIC | Grid size | 8 meter x 4 meter |
| GENERIC | Covering material (to be fixed top and all four sides) | UV stabilized 75 % shade net |
| GENERIC | Humidity / irrigation | With Fogging system |
| STRUCTURE (COMPLETE SET) | Zig-Zag spring made up of (to lock and hold nets in aluminium profile) | 2 mm thick steel coated with plastic |
| FOUNDATION / CIVIL WORK | Foundation work | Foundation, including poles, trusses, pillars and concrete work at site shall be the responsibility of the Seller and Seller shall Install / Erect and Commission the structure on the foundation |
| ANTE ROOM | Interior sliding door and exterior hinge type door made up of | Anodized aluminium section with 6 mm thick FRP (Fibre-reinforced plastic ) |
| ANTE ROOM | Provision of locking facility with both door (interior and exterior door) | For both Exterior and Interior door |
| FOGGING SYSTEM | Overhead anti-leak four way foggers | Of 28 litre/hour at 3 meter x 3 meter distance |
| FOGGING SYSTEM | Working pressure for fogging system | 4 to 6 bar pressure with average droplet size 50 to 100 μm (micron) |
| FOGGING SYSTEM | Type of Fogger | Hanging type |
| FOGGING SYSTEM | Pipe | 16 mm LLDPE (10 Kg/square cm) |
| FOGGING SYSTEM | Motor – one number with electric cable connection and fitted with arrangement of protection from rainwater | ISI marked 1.5 HP monoback pump |
| FOGGING SYSTEM | Filter (Screen) | With discharge facility of 25 cubic meter/hour |
| FOGGING SYSTEM | Pressure meter | 10 bar rating |
| FOGGING SYSTEM | Arrangement of return gutter | N.A |
| FOGGING SYSTEM | Provision of Control valve assembly | Yes |
| FOGGING SYSTEM | Provision of Flush valve | Yes |
| FOGGING SYSTEM | Provision of ISI mark Water tank of appropriate size | Yes |
| DRIP IRRIGATION | Net work pipes (PVC pipes conforming to IS 4985 : 2000 as amended up to date) | Main PVC pipes of 63 mm 6 kg - Sub main PVC pipe o f 50 mm 6 kg (used as lateral for drip irrigation) and Drain PVC pipes of 40 mm 6 kg |
| DRIP IRRIGATION | Fitting and accessories | Heavy duty (including the PVC, Elbow, Tee bend by using solvent cement, filter flanged, GI wires and other necessary accessories) conforming to IS 7834 (Part I) / latest |
| DRIP IRRIGATION | Inline tube – conforming to IS 13488 / latest | Inline hydrogel 16 mm drip lining and among each row with 2 litter per hour normal flow rate |
| DRIP IRRIGATION | LLDPE lateral pipe | Misting line with 16 mm |
| DRIP IRRIGATION | Head connector | Head connector and gasket rubber grommet connect the PVC sub main pipe line |
| DRIP IRRIGATION | Barbed connector | Barbed connector 16 mm to connect the inline hydrogel lateral to sub line |
| DRIP IRRIGATION | Filtration system | Disk and sand filter of matching capacity with automatic mechanism |
| DRIP IRRIGATION | Air release valve (for Long lasting and safe operation of the system) | Yes |
| DRIP IRRIGATION | Control valve (for timely opening and closing system) | Yes |
| WARRANTY | Warranty period in number of years (from the date of installation) | 2, 3, 4, 5 Or higher |
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates for shade net houses / agricultural infrastructure
Financial statements (last 2-3 years)
EMD/Security deposit proof
Technical bid documents and compliance statements
OEM authorizations or certifications for fogging and irrigation components
Site-specific installation plan and safety approvals (if any)
Extended Deadline
13-Jul-2026, 6:00 pm
Opening Date
13-Jul-2026, 6:30 pm
Key insights about WEST BENGAL tender market
Bidders must submit GST, PAN, experience certificates, and financial statements, along with technical compliance and OEM authorizations. Include IS 4985/13488 compliant drip irrigation details, fogging system specs, and a sample before participation. Ensure 95% transparency and complete scope covers installation and training.
Required documents include GST registration, PAN card, 2-3 year financial statements, experience certificates for similar projects, EMD proof, technical bid, OEM authorizations for fogging and irrigation components, installation plan, and safety certifications as applicable.
Fogging system components must be ISI marked where applicable, with IS 4985 and IS 13488 compliant piping, ISI water tank, filtration, pressure meter, control valve, and a rain-protected motor. Ensure compatibility with aluminium framed shade net structures.
Delivery timelines can be extended up to 25% for additional quantity; minimum extension is 30 days. The schedule ties to the last date of the original order, with proportional increase for extra quantity, ensuring orderly commissioning.
Payment terms are not explicitly stated; bidders should anticipate standard government practice and seek milestone-based payments after installation and commissioning, with clear acceptance criteria and performance verification before final settlement.
A sample must be submitted before participation, ensuring 95% transparency as per buyer ATC clauses. Include a representative fogging and drip irrigation sub-assembly and a layout of the shade net structure for evaluation.
Eligibility requires experience certificates for similar shade net projects, financial statements showing stability, OEM authorizations for core components, and technical compliance documentation demonstrating ISI/IS 4985/13488 alignment and safety standards.
Scope covers supply, installation, testing, commissioning, operator training, and providing any required statutory clearances. It also includes documentation and handover with warranty or support terms to be finalized in the contract.
Central Civil Services Cultural And Sports Board
📍 CENTRAL DELHI, DELHI
Nuclear Power Corporation Of India Limited
📍 CHITTORGARH, RAJASTHAN
Office Of Dg (ace)
📍 PUNE, MAHARASHTRA
Navsari Agricultural University Navsari
📍 NAVSARI, GUJARAT
Gujarat Mineral Development Corporation (gmdc)
📍 VADODARA, GUJARAT
Sign up now to access all documents
Main Document
GEM_CATEGORY_SPECIFICATION
GEM_GENERAL_TERMS_AND_CONDITIONS