IND. MOTOR WITH BRAKE: 0.75 KW,THREE PHASE INDUCTION MOTOR (0.37KW),THREE PHASE INDUCTION MOTOR (0.
Bharat Earth Movers Limited (beml)
Bid Publish Date
09-Jul-2026, 10:26 am
Bid End Date
20-Jul-2026, 11:00 am
Location
Progress
Quantity
2
Category
Three phase induction Hoist Motor with INTEGRAL BRAKE of KW-15, Volt- 415 V+ /- 10% , AC, Amp-29,
Bid Type
Single Packet Bid
Damodar Valley Corporation invites bids for Three phase induction hoist motors with integral brake in two capacities: 1.1 kW and 15 kW, both at 415 V ±10% AC with current ratings of 2.9 A and 29 A respectively. The scope includes motors with an integral brake, aligning to DVN procurement needs in the material handling segment. The tender documents indicate an option to adjust quantity up to 25% of bid quantity during contract, with delivery timing tied to the last date of the original delivery order. Unique terms include delivery-time computation for increased quantity and possible extensions. This opportunity targets suppliers with experience in compact hoist motors and brake assemblies, and flexibility to scale within contract rates.
Three phase induction hoist motor with integral brake
KW 1.1 and KW 15 ratings
415 V ±10% AC supply
Current: 2.9 A (1.1 kW) and 29 A (15 kW)
Integrated brake assembly
No explicit standard numbers provided; verify compatibility with downstream DVN requirements
Option clause allows ±25% quantity change during and after award
Delivery period starts from the last date of original delivery order
Extended delivery time follows the (increased/original quantity) formula with a minimum 30 days
All bids must comply with buyer-added ATC and terms
EMD amount not disclosed in tender data
Payment terms are governed by the buyer-added ATC; no explicit schedule provided in data
Delivery begins from the last date of the original delivery order; extension formula applies for quantity variation
Not specified in data; refer to ATC for penalties or LDs
Experience in supplying induction motors with integral braking
Capability to scale quantity by ±25% within contract rates
Financial statements demonstrating solvency for procurement contracts
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Three phase induction Hoist Motor with INTEGRAL BRAKE of KW-1.1, Volt- 415 V+ /- 10% , AC, Amp-2.9, , Three phase induction Hoist Motor with INTEGRAL BRAKE of KW-15, Volt- 415 V+ /- 10% , AC, Amp-29,
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
180
Delivery Locations
1
Delivery Cities
Paschim Bardhaman
Delivery Pincodes
713321
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Kaushik Kumar Mukherjee | 713321,DVC- Durgapur Steel Thermal Power Station, Andal- 713321, Bardhaman, West Bengal, Bardhaman, 713321 | Paschim Bardhaman | West Bengal | 713321 | 1 | 180 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
TECHNICAL
TECHNICAL
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Bharat Earth Movers Limited (beml)
Advanced Weapons And Equipment India Limited
KANPUR NAGAR, UTTAR PRADESH
Nlc India Limited
BIKANER, RAJASTHAN
Armoured Vehicles Nigam Limited
THANE, MAHARASHTRA
Semiconductor Laboratory
Mohali, PUNJAB
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar hoist motor supply
Financial statements or solvency proof
EMD/Security deposit documentation (if required by ATC)
Technical bid documents showing compliance with motor-integrated brake
OEM authorization or dealership certificate (if bidding on OEM-branded items)
Any certificates validating compliance with applicable standards
Key insights about WEST BENGAL tender market
Bidders should submit GST, PAN, experience certificates, financials, EMD documentation, and OEM authorizations as per T&C. Ensure compliance for 3-phase induction hoist motors with integral brake at 415 V ±10% and confirm capacity variants 1.1 kW and 15 kW. Follow ATC delivery and quantity variation rules.
Required documents include GST certificate, PAN card, experience certificates for similar motors, financial statements, EMD documentation, technical bid documents, and OEM authorizations. Ensure compliance with buyer-added ATC terms and include any certification validating brake assembly suitability.
Motors must be three-phase induction with an integral brake, rated at 1.1 kW and 15 kW, operating on 415 V ±10% AC, with current ratings of 2.9 A and 29 A respectively. Detailed performance curves are not provided; bidders must confirm compatibility with DVN requirements and attach compliance certificates.
Delivery scheduling follows the last date of the original delivery order. If quantity increases by up to 25%, an extended delivery time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. Suppliers should plan for contingencies accordingly.
Eligibility includes demonstrated experience in supplying similar hoist motors with integrated brakes, sufficient financial capacity, and ability to meet quantity variation terms (±25%). Bidders should provide OEM authorizations and compliance certificates for the motor assemblies to qualify under DVN procurement.
The purchaser may vary quantity up to 25% at contract placement and during currency. The additional delivery time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. Extensions may be allowed to reach the full original delivery period.
Motors must operate at 415 V ±10% AC. This voltage tolerance ensures compatibility with standard industrial supply and aligns with the tender's rated current for each motor capacity (2.9 A for 1.1 kW and 29 A for 15 kW). Bidders must validate with equipment tests.
Tender data does not specify exact standards; bidders should supply documentation proving brake integration compliance and motor performance. Attach OEM certifications and any relevant quality approvals. Verify compatibility with Damodar Valley Corporation’s internal standards during bid submission.
Damodar Valley Corporation
📍 BARDHAMAN, WEST BENGAL
Andrew Yule And Company Limited
📍 NADIA, WEST BENGAL
Bharat Earth Movers Limited (beml)
📍 BANGALORE, KARNATAKA
Kiocl Limited
📍 DAKSHINA KANNADA, KARNATAKA
Munitions India Limited
📍 NALANDA, BIHAR
Sign up now to access all documents
Main Document
TECHNICAL
TECHNICAL
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS