Punjab National Bank Air Conditioner Procurement Wall Mount ISI Marked to IS1391 Part 2 2026 Tender
Punjab National Bank
MUMBAI, MAHARASHTRA
Progress
Quantity
6
Bid Type
Single Packet Bid
The Industrial Training Department of Kerala seeks supply and installation of ISI Marked Split Air Conditioners, Wall Mount Type compliant with IS 1391 (Part 2) (Q2). The procurement targets units delivered to the GOVT. ITI ARAKUZHA, Meenkunnam P.O., AAROOR, Ernakulam, Kerala. Specifications emphasize Performance Parameters (room stores, AC size, nominal tonnage, compressor type per BEE Star Label, BEE rating) and Warranty (minimum standard, compressor, PCB). The tender instructs suppliers to adhere to option clauses allowing quantity variations up to 25% during award and currency, with delivery timelines linked to original/extended orders. A clear emphasis on OEM-led installation and training is noted.
EMD amount and exact delivery timeline are not disclosed in tender data; bidders should confirm amounts and schedules.
Quantity flexibility up to 25% is allowed at contract award and during currency; delivery extensions follow a calculated formula.
Installation and commissioning must be performed by OEM-certified personnel or OEM-authorized resellers; training included.
GST treatment is bidder’s responsibility; reimbursement as actuals or applicable rate, whichever is lower, with percentage linked to quoted GST.
Delivery period tied to original order date; option time extensions calculated as (increased quantity/original quantity) × original delivery period, minimum 30 days.
Not explicitly specified in data; verify during bid submission and contract finalization.
3 years of govt or PSU supply experience for similar AC products
Regular manufacturing/supply of similar category products with contract copies for each year
Not under liquidation or bankruptcy; sign undertaking to this effect
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2)
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Ernakulam
Delivery Pincodes
686672
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Paulson I P | 686672,GOVT. ITI, ARAKUZHA ARAKUZHA P.O, MUVATTUPUZHA, ERNAKULAM, KERALA 686672 Pincode - 686672 | Ernakulam | Kerala | 686672 | 6 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Punjab National Bank
MUMBAI, MAHARASHTRA
Punjab National Bank
MUMBAI, MAHARASHTRA
Odisha Police
KHORDHA, ODISHA
Central Institute Of Plastics Engineering And Technology (cipet)
CHENNAI, TAMIL NADU
Mecon Limited
RANCHI, JHARKHAND
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| Performance Parameters | Description of Stores | Wall Mount Type Split Air Conditioner with copper evaporator and condenser, reusable air filter and standard accessories [3 meter Refrigerant Interconnecting Copper Pipe, 1 meter PVC insulated sheathed power cable(as per IS 694), Drain pipe, Remote] |
| Performance Parameters | Size of Air Conditioner | Medium [suitable for room area between 130-180 sq. ft.] |
| Performance Parameters | Compressor Type as per BEE Star Rating Label | Inverter - Variable Speed |
| Performance Parameters | Nominal Capacity of Air Conditioner (in Ton) | 1.3 Ton - 1.7 Ton |
| Performance Parameters | Classification By Function | Cooling Only |
| Performance Parameters | BEE Star Rating | 3 Star |
| Warranty and Test Reports | Minimum Standard Warranty on Air Conditioner (in years) | 1.0 |
| Warranty and Test Reports | Warranty on Compressor | 10.0 Or higher |
| Warranty and Test Reports | Warranty on PCB | 5 Or higher |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Key insights about KERALA tender market
Bidders must submit product compliance with ISI IS 1391 (Part 2), provide BEE Star Rating documentation, and include minimum standard warranty details for AC, compressor, and PCB. Include OEM authorizations, 3-year govt supply experience, GST registration, and EMD per tender terms. Delivery to Ernakulam address is required.
Required documents include GST certificate, PAN card, experience certificates, financial statements, EMD/Security deposit, technical bid documents, and OEM authorization. If End User Certificate is requested, provide in the buyer’s format. Ensure installation capacity by OEM-certified personnel.
Specifications specify Wall-mounted split AC, ISI Mark IS 1391 (Part 2), nominal capacity in tons, compressor type per BEE label, and BEE star rating. Warranty requirements cover the AC unit, compressor, and PCB; installation must be by OEM-certified resources; IPv6 clause may indicate IT readiness.
Delivery timelines align with the original delivery order; if the option clause is exercised, time extensions are calculated as (increased quantity/original quantity) × original delivery period, with a minimum of 30 days. Final dates are contract-determined post bid evaluation.
The tender requires a minimum standard warranty on the air conditioner, plus separate compressor warranty and PCB warranty. Exact durations should be confirmed in the bid document; ensure OEM-backed coverage and service support within Kerala.
Eligibility requires at least 3 years of regular govt/PSU supply of similar AC products, demonstrated contracts for each year, and solid financial standing (no liquidation). Installation must be by OEM-certified personnel, with valid GST and OEM authorizations where applicable.
Scope includes installation, commissioning, testing, configuration, and training conducted by OEM or OEM-certified personnel. Training details specify the number of employees to be trained, with the OEM/authorized reseller responsible for on-site guidance and handover.
Mahanadi Coalfields Limited
📍 ANGUL, ODISHA
Punjabi University Patiala
📍 PATIALA, PUNJAB
Accountant General, Maharashtra
📍 MUMBAI, MAHARASHTRA
N/a
📍 KARNAL, HARYANA
N/a
Sign up now to access all documents
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS