Indian Army Pully Crank Timing Belt… Bathinda Punjab Procurement 2025
Indian Army
BATHINDA, PUNJAB
Progress
Quantity
21
Category
Timing Belt
Bid Type
Two Packet Bid
The Indian Army, Department Of Military Affairs, Pathankot, Punjab seeks procurement of multiple automotive components including timing belt, idler pulley assembly, assembly auto tensioner, adhesive WT strip, transponder and RF key, stem buckle with micro switch RH, protective bag, rubber beading, air cleaner hose, coupling tube, air filter grid, and rubber pad. The scope covers 12 BOQ items with bulk supply needs and potential quantity variations up to ±25% under the option clause. A priority requirement is ISO 9001 certification from bidder or OEM, ensuring quality management parity with government standards. The contract emphasizes sample approval prior to bulk manufacturing and adherence to contracted rates during any quantity expansion. Pathankot location and military-grade specifications drive supplier selection, underscoring reliability, traceability, and timely delivery.
Product names: timing belt, idler pulley assembly, auto tensioner, adhesive WT strip, transponder and RF key, stem buckle with micro switch RH, protective bag, rubber beading, air cleaner hose, coupling tube, air filter grid, rubber pad
Standards: ISO 9001 (required for bidder or OEM)
Quality approach: advance sample approval; 2 samples within 5 days; modifications communicated within 5 days
Delivery: option to extend due to quantity variation up to 25%; delivery period recalculated as (additional quantity / original quantity) × original delivery period with minimum 30 days
BOQ: 12 items; quantities not disclosed; prepare for bulk supply under government procurement norms
Option for quantity adjustment up to 25% with corresponding delivery schedule adjustments
Advance sample approval required within 5 days; 2 samples, with modifications per buyer feedback
ISO 9001 certification mandatory for bidder or OEM; ensures quality management compliance
EMD amount not disclosed; standard government practice applies; vendor to prepare for payment terms post award
Delivery period starts after last date of original delivery order; extension possible based on option clause with minimum 30 days
LD not explicitly stated; deviations from approved samples may trigger contract termination or required modifications
Bidder or OEM must possess ISO 9001 certification
Experience in supplying automotive components or similar military-grade items
GST registration and valid PAN; ability to submit EFT mandate and bank verification
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Timing Belt , Idler Pulley Assy , Assy Auto Tensioner , Adhesive B WT Strip , Transponder and RF Key , Stem Buckle with Micro switch RH , Protective Bag , Rubber Beading , Air Cleaner Hose , Coupling Tube , Air Filter Grid , Rubber Pad
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
BATHINDA, PUNJAB
Indian Army
KANGRA, HIMACHAL PRADESH
Indian Army
KANGRA, HIMACHAL PRADESH
Indian Army
Indian Army
HISAR, HARYANA
Tender Results
Loading results...
Timing Belt
Timing Belt
Idler Pulley Assy
Idler Pulley Assy
Assy Auto Tensioner
Assy Auto Tensioner
Adhesive B WT Strip
Adhesive B WT Strip
Transponder and RF Key
Transponder and RF Key
Stem Buckle with Micro switch RH
Stem Buckle with Micro switch RH
Protective Bag
Protective Bag
Rubber Beading
Rubber Beading
Air Cleaner Hose
Air Cleaner Hose
Coupling Tube
Coupling Tube
Air Filter Grid
Air Filter Grid
Rubber Pad
Rubber Pad
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Timing Belt | Timing Belt | 1 | nos | hemant6002 | 15 | |
| 2 | Idler Pulley Assy | Idler Pulley Assy | 1 | nos | hemant6002 | 15 | |
| 3 | Assy Auto Tensioner | Assy Auto Tensioner | 1 | nos | hemant6002 | 15 | |
| 4 | Adhesive B WT Strip | Adhesive B WT Strip | 2 | nos | hemant6002 | 15 | |
| 5 | Transponder and RF Key | Transponder and RF Key | 2 | nos | hemant6002 | 15 | |
| 6 | Stem Buckle with Micro switch RH | Stem Buckle with Micro switch RH | 2 | nos | hemant6002 | 15 | |
| 7 | Protective Bag | Protective Bag | 2 | nos | hemant6002 | 15 | |
| 8 | Rubber Beading | Rubber Beading | 3 | nos | hemant6002 | 15 | |
| 9 | Air Cleaner Hose | Air Cleaner Hose | 2 | nos | hemant6002 | 15 | |
| 10 | Coupling Tube | Coupling Tube | 2 | nos | hemant6002 | 15 | |
| 11 | Air Filter Grid | Air Filter Grid | 1 | nos | hemant6002 | 15 | |
| 12 | Rubber Pad | Rubber Pad | 2 | nos | hemant6002 | 15 |
Discover companies most likely to bid on this tender
PAN Card
GSTIN
Cancelled cheque
EFT Mandate certified by Bank
ISO 9001 certification (bidder or OEM)
Experience certificates (related automotive components procurement)
Technical bid documents and OEM authorizations (if applicable)
Key insights about PUNJAB tender market
Bidders should ensure ISO 9001 certification for the bidder or OEM, submit GSTIN, PAN, cancelled cheque and EFT mandate, and be prepared for advance sample approval within 5 days of award. Prepare for up to ±25% quantity variation and comply with delivery timelines defined by the option clause.
Submit PAN, GSTIN, cancelled cheque, EFT mandate, and ISO 9001 certificate (bidder or OEM). Include experience certificates in automotive components, technical bid documents, and OEM authorizations if applicable. Ensure all documents align with Terms and Conditions.
The tender lists 12 items including timing belts, idler pulleys, auto tensioners, air cleaner hoses and more; while explicit dimensions are not given, emphasis is on ISO 9001 compliance and sample conformity for bulk production.
Advance samples must be submitted within 5 days of contract award; buyer will approve or request modifications within 5 days; delays in approval may extend the delivery period without LD.
The purchaser may increase or decrease the quantity up to 25% of bid quantity at contract placement and during the currency of the contract, with adjusted delivery times as specified by the option clause.
Submit PAN, GSTIN, cancelled cheque, EFT mandate, ISO 9001 certification, relevant experience certificates, and technical bid documents; ensure alignment with sample approval requirements and the 25% quantity variation policy.
Delivery period starts from the last date of the original delivery order; extended delivery time equals (additional quantity ÷ original quantity) × original delivery period, minimum 30 days; option clause may extend up to the original delivery period.
The procurement is led by the Indian Army under the Department of Military Affairs, with a Pathankot, Punjab location, seeking multiple automotive components including timing belts and transponder keys.
Indian Army
📍 DARJEELING, WEST BENGAL
Indian Army
📍 JHANSI, UTTAR PRADESH
Indian Army
📍 INDORE, MADHYA PRADESH
Indian Army
📍 TINSUKIA, ASSAM
Indian Army
📍 BATHINDA, PUNJAB
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS