Online UPS (?10 KVA) Without Battery Conforming To IS 16242 (Part 1)
Indian Army
INDORE, MADHYA PRADESH
Bid Publish Date
17-Jun-2026, 12:50 pm
Bid End Date
27-Jun-2026, 1:00 pm
Location
Progress
Quantity
9
Bid Type
Single Packet Bid
Western Railway, Indian Railways, invites bids for a 10 KVA online UPS without battery to conform to IS 16242 (Part 1), with installation at Ratlam, Madhya Pradesh 457001. Estimated scope includes procurement of UPS units with specified input/output AC 50 Hz voltage and potential factory warranty. The tender allows a ยฑ25% quantity variation and requires adherence to attachment specifications, including the single-item UPS requirement referenced as โUPS 1 KVAโ in ATC. The procurement emphasizes post-installation support, OEM warranty documentation, and GCC-compliant service coverage within India. This bid targets suppliers capable of supply, installation, testing, and ongoing maintenance, with emphasis on IS 16242 compliance and reliable after-sales service.
10 KVA online UPS without battery configuration
Input Voltage: AC 50 Hz
Output Voltage: AC 50 Hz
IS 16242 (Part 1) conformity
Inbuilt isolation transformer availability
OEM warranty documentation required at delivery
Quantity may vary by ยฑ25% of bid quantity during contract
Delivery period calculable per extended delivery terms with minimum 30 days
OEM warranty certificates required at delivery and after-installation support
GST to be verified by bidder; reimbursement as actuals or applicable rate
Upload all required certificates, ATC documents, and Corrigendum items
GST and pricing reimbursement as per actuals or quoted rate; no explicit advance/payment term in data provided
Option clause allows quantity change up to 25%; delivery timeline tied to last delivery order date with minimum 30 days; extended time calculated per formula
Not explicitly stated in provided data; standard procurement may apply LD for delays per contract terms
Experience in supplying and installing UPS systems with IS 16242 compliance
Demonstrated OEM authorization for the specified UPS model
Financial capability to sustain initial procurement and installation costs
Indicative service network with local installation and maintenance capability in India
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Online UPS (?10 KVA) Without Battery Conforming To IS 16242 (Part 1) (Q2)
End-to-end support โ bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation ยท 24h response
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
INDORE, MADHYA PRADESH
Ntro
BHOPAL, MADHYA PRADESH
Indian Space Research Organization
THIRUVANANTHAPURAM, KERALA
Canara Bank
RANCHI, JHARKHAND
Department Of Ex Sevicemen Welfare
SIKAR, RAJASTHAN
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| Performance Parameters | Rating (in KVA) | 1 |
| Performance Parameters | Input Voltage (AC, 50 Hz) | Single Phase, 160V - 260V |
| Performance Parameters | Output Voltage (AC, 50 Hz) | Single Phase, 230Vยฑ1%, |
| Construction | Availability of Inbuilt Isolation Transformer | No |
Discover companies most likely to bid on this tender
GST Registration Certificate
Permanent Account Number (PAN) Card
Experience Certificates for similar UPS installations
Financial Statements (last 3 years) or Turnover proof
Technical Compliance Certificates for IS 16242 (Part 1)
OEM Authorization / Authorisation Letter from UPS manufacturer
Warranty Certificates from OEM
Installation, Commissioning & Training Capability documentation
Service Centre Details near consignee destinations
Any additional bid-specific certificates as requested in ATC
Key insights about MADHYA PRADESH tender market
To bid, ensure IS 16242 (Part 1) compliance, obtain OEM authorization, and submit GST, PAN, experience, financials, and OEM warranty certificates. Prepare installation, commissioning, and training capability documents. Adhere to the option clause for ยฑ25% quantity variation and provide post-installation service details.
Submit GST registration, PAN, at least 3 years of UPS installation experience, financial statements, OEM authorization, technical compliance certificates, and OEM warranty certificates. Include installation and maintenance service details and service centers near consignee destinations.
Bidders must ensure IS 16242 (Part 1) conformity for the 10 KVA online UPS without battery, with OEM warranty documentation. Inbuilt isolation transformer availability should be verified and documented in the bid response.
The purchaser reserves the right to increase or decrease quantity up to 25% of bid quantity at contract placement and during the currency of the contract, with delivery time calculated per the extended period formula and minimum 30 days.
Bidders must provide installation, commissioning, training, troubleshooting, and maintenance service capability within India, with service centers near consignee destinations and OEM warranty coverage per the tender specifications.
GST applicability is bidder-determined; the purchaser will reimburse as per actuals or the applicable rate, up to the quoted GST percentage, with bidder responsible for correct GST compliance details.
OEM warranty certificates must be submitted at the time of delivery of goods, with the supplier guaranteeing rectification during the warranty period and providing a supported after-sales network in India.
Bidders should demonstrate capable installation, commissioning, and training teams, with documented service centers in India and proximity to Ratlam consignee locations to ensure timely after-sales support.
Muvattupuzha Municipality
๐ ERNAKULAM, KERALA
Karnataka Neeravari Nigam Limited (knnl)
๐ GADAG, KARNATAKA
Banaras Locomotive Works
๐ VARANASI, UTTAR PRADESH
Indo Tibetan Border Police (itbp)
๐ SHIVPURI, MADHYA PRADESH
Indian Air Force
๐ BUDGAM, JAMMU & KASHMIR
Sign up now to access all documents
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS