NTPC Limited Earthing & Lightning Protection Adequacy Study Tender Bhavnagar/Bharuch Gujarat 2025
Ntpc Limited
BHARUCH, GUJARAT
Bid Publish Date
18-Jun-2026, 6:43 pm
Bid End Date
29-Jun-2026, 11:00 am
Location
Progress
Quantity
1
Bid Type
Two Packet Bid
NTPC Limited invites bids for an earthing and lightning protection system adequacy study for the Switchyard Main Plant and Off-Site areas at the NTPC Telangana State Thermal Power Project, located in Karimnagar, Telangana 505001. The procurement category is a Custom Bid for Services focused on technical feasibility and protection system adequacy. The BOQ lists zero items, and the estimated value and EMD are not disclosed in the available data, with related ATC/SLA documents uploaded for bidders to review. This tender requires assessment expertise rather than supply of hardware, and the primary differentiator is the depth of electrical protection system analysis for a large switchyard environment. Unique aspects include reliance on NTPC-specific site conditions and integration with existing switchyard infrastructure. This opportunity is relevant to consultants specialized in substation protection, earthing design, and lightning protection studies.
Product/Service: Earthing and Lightning Protection System Adequacy Study for Switchyard Main Plant and Off-Site areas
Scope: Technical consultancy for adequacy assessment, not hardware supply
Location: NTPC Telangana State Thermal Power Project, Karimnagar, Telangana
Estimated value: Not disclosed in available data
EMD: Not disclosed in available data; see ATC/SLA
Experience: HV protection study capability for large switchyards implied
Standards/Compliance: Not explicitly listed; align with industry best practices for earthing and protection
EMD amount and payment terms to be clarified in ATC/SLA attachments
Delivery schedule to be defined in buyer’s SLA; bidders must align with NTPC project timelines
ATC/SLA documents govern scope, deliverables, and penalties if any
Payment terms are defined in the ATC/SLA attachments; bidders should review these documents for milestones and currency.
Delivery schedule will be specified in the ATC/SLA; bidders must plan deliverables to meet site review and final reporting deadlines.
Any LD provisions will be described in the ATC/SLA; bidders should prepare risk mitigation and compliance plans accordingly.
Experience in high voltage protection studies and earthing systems for large substation projects
Demonstrated capability to prepare adequacy and feasibility reports
Compliance with NTPC procurement practices and ATC/SLA terms
Tender Category
Service
Bid To RA
No
Bid To RA Enabled
No
Item Category
Custom Bid for Services - 200148540 Earthing and Lightning Protection System Adequacy study for Switchyard Main Plant and Off-Site areas at NTPC Telangana STPP NTPC Telangana
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
SCOPE_OF_WORK
PAYMENT
OTHER
OTHER
OTHER
BOQ
OTHER
ATC
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Ntpc Limited
BHARUCH, GUJARAT
Ntpc Limited
NAGPUR, MAHARASHTRA
Ntpc Limited
KOKRAJHAR, ASSAM
Ntpc Limited
GAUTAM BUDDHA NAGAR, UTTAR PRADESH
Ntpc Limited
RAEBARELI, UTTAR PRADESH
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for earthing/ lightning protection/ HV protection studies
Financial statements (last 2-3 years) or solvency certificate
EMD document (if mandated in ATC) or alternative security as per terms
Technical bid documents outlining methodology and team qualifications
OEM authorizations or certifications if subcontracting work is involved
ATC/SLA attachments provided by NTPC
Any site-specific safety or quality certifications referenced in terms
Key insights about TELANGANA tender market
Bidders must review the ATC/SLA attachments for scope, submission format, and required documents. Prepare GST, PAN, experience certificates, and financials; include methodology and team qualifications. Ensure HV protection study experience and site familiarity; EMD (if required) must accompany the proposal.
Required documents include GST registration, PAN, experience certificates for HV protection studies, financial statements, technical bid with methodology, EMD document if mandated, and OEM authorizations if subcontracting is involved; refer to ATC/SLA for any additional site-specific certificates.
The tender calls for an adequacy study for earthing and lightning protection for the switchyard and off-site areas; exact standards are not specified in the data. Bidders should apply industry best practices and NTPC site-specific considerations as outlined in ATC/SLA documents.
The precise deadline is not provided in the available data; bidders should consult the uploaded ATC/SLA attachments for the final submission date and any pre-bid meeting schedule.
EMD amount is not disclosed in the current data; bidders must verify the EMD details within the ATC/SLA attachments and comply with payment mode and validity as specified.
The tender data does not list explicit standards; bidders should align with general HV protection and earthing practices and comply with NTPC site requirements as per ATC/SLA; obtain clarified standard references from the buyer.
Qualified electrical protection consultants with HV switchyard experience should prepare the deliverables, including adequacy reports, recommendations, and compliance mappings; ensure alignment with NTPC ATC/SLA requirements and site conditions.
Deliverables likely include feasibility assessment, adequacy evaluation, recommended improvements, and final reporting; exact formats and milestones will be defined in the ATC/SLA attachments accompanying the tender.
Ntpc Limited
📍 KARIM NAGAR, TELANGANA
Ntpc Limited
📍 KARIM NAGAR, TELANGANA
Ntpc Limited
📍 KARIM NAGAR, TELANGANA
Brahmaputra Cracker And Polymer Limited
📍 DIBRUGARH, ASSAM
Oil And Natural Gas Corporation Limited
📍 VADODARA, GUJARAT
Sign up now to access all documents
Main Document
OTHER
OTHER
SCOPE_OF_WORK
PAYMENT
OTHER
OTHER
OTHER
BOQ
OTHER
ATC
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS