Pilibhit Tiger Reserve Circle Solar PV Water Pumping Systems Tender Uttar Pradesh MNRE Q3 2025
Pilibhit Tiger Reserve Circle
PILIBHIT, UTTAR PRADESH
Bid Publish Date
07-Jul-2026, 9:21 am
Bid End Date
17-Jul-2026, 10:00 am
EMD
₹16,440
Location
Progress
Quantity
1
Bid Type
Two Packet Bid
Rural Development Department Uttar Pradesh invites bids for a Solar Photovoltaic Water Pumping System (V2) under MNRE specifications for the Hardoi, Uttar Pradesh location. The tender references EMD ₹16,440 and follows GeM portal processes. Scope includes performance-based solar pumping equipment meeting Model Number, PV array capacity (Wp), motor pump-set HP, shut-off head (m), and water output (L/day) parameters. The contract contemplates quantity variation up to 25% during award and currency, with delivery periods linked to the original delivery timeline and extended periods calculated per the option clause. Unique aspects include mandatory site inspection and GeM upload requirements, with installation and commissioning resources to be provided by the bidder. The procurement emphasizes compliance with MNRE solar pumping standards and local deployment in Hardoi.
Solar PV water pumping system per MNRE V2
Model Number as per tender
PV array capacity in Wp
Motor pump-set HP rating
Shut-off head in meters
Water output in liters per day
Must include installation and commissioning scope
Performance testing per MNRE protocol
EMD amount ₹16,440; submission via GeM
Quantity may vary ±25% during/after placement
Site inspection is mandatory prior to bid submission
Upload GST, PAN, and statutory registrations on GeM
Installation resources must be available; warranty terms to be clarified
No explicit payment schedule provided; terms to follow GeM/Bid conditions and contract award
Delivery period linked to original delivery date with option-based extensions; minimum extension 30 days
LDs not clearly specified; ensure compliance with delivery and performance benchmarks per GeM terms
Experience in supplying solar pumping equipment per MNRE V2
Demonstrated ability to install and commission on-site in Uttar Pradesh
Financial capacity to handle ₹ up to the estimated contract value (if defined) and EMD readiness
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Solar Photovoltaic Water Pumping Systems (V2) as per MNRE Specification (Q3)
Advisory Bank
State Bank of India
Payment Timelines
Payments shall be made to the Seller within 44 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
365
Delivery Locations
1
Delivery Cities
Hardoi
Delivery Pincodes
241202
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Mohit Dubey | 241202,BDO office bharwaan Hardoi | Hardoi | Uttar Pradesh | 241202 | 1 | 365 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
GEM_CATEGORY_SPECIFICATION
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Pilibhit Tiger Reserve Circle
PILIBHIT, UTTAR PRADESH
N/a
KHERI, UTTAR PRADESH
N/a
JYOTIBA PHULE NAGAR, UTTAR PRADESH
E-municipalities - Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh
JALAUN, UTTAR PRADESH
N/a
BHANDARA, MAHARASHTRA
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| Performance Parameter | Type of Solar Pumping System | Shallow Well (Surface) Solar Pumping Systems with D.C. Motor /PMSM/SRM, Shallow Well (Surface) Solar Pumping Systems with A.C. Induction Motor, Solar Deep Well (Submersible) Pumping Systems with D.C. Motor /PMSM/SRM, Solar Deep Well (Submersible) Pumping Systems with A.C. Induction Motor |
| Performance Parameter | Model Number of SPV Water Pumping System | Model-1, Model-2, Model-3, Model-4, Model-5, Model-6, Model-7, Model-8, Model-9, Model-10, Model-11, Model-12, Model-13, Model-14, Model-15, Model-16, Model-17, Model-18, Model-19, Model-20, Model-21, Model-22, Model-23, Model-24, Model-25, Model-26, Model-27, Model-28, Model-29, Model-30, Model-31, Model-32, Model-33, Model-34, Model-35, Model-36, Model-37, Model-38, Model-39 |
| Performance Parameter | Power of Solar Photovoltaic (PV) Array [in Watt-peak(Wp)] | 900, 1800, 2700, 4800, 6750, 9000, 11250, 18000, 20250, 22500, 13500, 15750, 1200, 3000 |
| Performance Parameter | Motor Pump-Set Capacity (in HP) | 1, 2, 3, 5, 7.5, 10, 12.5, 20, 22.5, 25, 15, 17.5 |
| Performance Parameter | Shut Off Dynamic Head (in meters) | 12, 25, 45, 100, 150, 70, 180, 225, 300, 375 |
| Performance Parameter | Water Output (in Liters per day) | 42000 (from a total head of 30 meters), 42000 (from a total head of 70 meters), 43200 (from a total head of 100 meters), 45000 (from a total head of 70 meters), 45600 (from a total head of 30 meters), 50400 (from a total head of 100 meters), 60750 (from a total head of 100 meters), 63000 (from a total head of 30 meters), 63000 (from a total head of 50 meters), 67200 (from a total head of 70 meters), 68400 (from a total head of 30 meters), 69000 (from a total head of 50 meters), 70875 (from a total head of 100 meters), 72000 (from a total head of 70 meters), 75375 (from a total head of 150 meters), 81000 (from a total head of 100 meters), 81000 (from a total head of 250 meters), 84375 (from a total head of 150 meters), 89100 (from a total head of 10 meters), 90000 (from a total head of 200 meters), 90000 (from a total head of 250 meters), 90450 (from a total head of 150 meters), 91125 (from a total head of 250 meters), 94500 (from a total head of 70 meters), 94500 (from a total head of 100 meters), 95625 (from a total head of 120 meters), 99000 (from a total head of 10 meters), 99000 (from a total head of 200 meters), 100800 (from a total head of 50 meters), 105000 (from a total head of 30 meters), 101250 (from a total head of 70 meters), 101250 (from a total head of 100 meters), 101250 (from a total head of 150 meters), 101250 (from a total head of 200 meters), 101250 (from a total head of 250 meters), 105525 (from a total head of 150 meters), 106875 (from a total head of 120 meters), 110400 (from a total head of 50 meters), 111375 (from a total head of 200 meters), 112500 (from a total head of 200 meters), 114000 (from a total head of 30 meters), 114750 (from a total head of 120 meters), 118125 (from a total head of 100 meters), 118125 (from a total head of 150 meters), 120600 (from a total head of 150 meters), 121500 (from a total head of 100 meters), 123750 (from a total head of 200 meters), 126000 (from a total head of 70 meters), 128250 (from a total head of 120 meters), 132300 (from a total head of 20 meters), 133875 (from a total head of 120 meters), 135000 (from a total head of 70 meters), 135000 (from a total head of 150 meters), 135675 (from a total head of 150 meters), 141750 (from a total head of 50 meters), 141750 (from a total head of 100 meters), 148500 (from a total head of 20 meters), 149625 (from a total head of 120 meters), 150750 (from a total head of 150 meters), 151875 (from a total head of 150 meters), 153000 (from a total head of 120 meters), 155250 (from a total head of 50 meters), 157500 (from a total head of 70 meters), 162000 (from a total head of 100 meters), 165375 (from a total head of 100 meters), 168000 (from a total head of 30 meters), 168750 (from a total head of 70 meters), 168750 (from a total head of 150 meters), 171000 (from a total head of 120 meters), 172125 (from a total head of 120 meters), 178200 (from a total head of 10 meters), 182250 (from a total head of 100 meters), 182400 (from a total head of 30 meters), 189000 (from a total head of 50 meters), 189000 (from a total head of 70 meters), 189000 (from a total head of 100 meters), 191250 (from a total head of 120 meters), 192375 (from a total head of 120 meters), 198000 (from a total head of 10 meters), 202500 (from a total head of 70 meters), 202500 (from a total head of 100 meters), 207000 (from a total head of 50 meters), 212625 (from a total head of 100 meters), 213750 (from a total head of 120 meters), 220500 (from a total head of 70 meters), 235200 (from a total head of 20 meters), 236250 (from a total head of 30 meters), 236250 (from a total head of 50 meters), 236250 (from a total head of 70 meters), 236250 (from a total head of 100 meters), 252000 (from a total head of 70 meters), 256500 (from a total head of 30 meters), 264000 (from a total head of 20 meters), 267300 (from a total head of 10 meters), 270000 (from a total head of 70 meters), 283500 (from a total head of 50 meters), 283500 (from a total head of 70 meters), 297000 (from a total head of 10 meters), 303750 (from a total head of 70 meters), 315000 (from a total head of 30 meters), 315000 (from a total head of 70 meters), 330750 (from a total head of 20 meters), 330750 (from a total head of 50 meters), 337500 (from a total head of 70 meters), 342000 (from a total head of 30 meters), 371250 (from a total head of 20 meters), 378000 (from a total head of 50 meters), 393750 (from a total head of 30 meters), 441000 (from a total head of 20 meters), 425250 (from a total head of 50 meters), 465750 (from a total head of 50 meters), 472500 (from a total head of 30 meters), 472500 (from a total head of 50 meters), 475200 (from a total head of 10 meters), 495000 (from a total head of 20 meters), 517500 (from a total head of 50 meters), 528000 (from a total head of 10 meters), 551250 (from a total head of 20 meters), 551250 (from a total head of 30 meters), 630000 (from a total head of 30 meters), 661500 (from a total head of 20 meters ), 668250 (from a total head of 10 meters), 742500 (from a total head of 10 meters), 990000 (from a total head of 10 meters), 1113750 (from a total head of 10 meters), 1237500 (from a total head of 10 meters), 618750 (from a total head of 20 meters), 427500 (from a total head of 30 meters), 258750 (from a total head of 50 meters), 742500 (from a total head of 20 meters), 513000 (from a total head of 30 meters), 310500 (from a total head of 50 meters), 598500 (from a total head of 30 meters), 362250 (from a total head of 50 meters), 684000 (from a total head of 30 meters), 414000 (from a total head of 50 meters) |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar solar pumping projects
Financial statements (last 2-3 years)
EMD submission proof (online/DD as applicable)
Technical bid documents and manufacturer/OEM authorizations
TS drawings and specifications (as applicable)
Site Inspection Certificate (pre-bid)
Key insights about UTTAR PRADESH tender market
Bidders must register on the GeM portal, submit EMD ₹16,440, upload GST/PAN, experience certificates, and OEM authorizations, complete site inspection requirements, and ensure MNRE V2 standards compliance for SPV water pumping systems. Include model numbers, PV array capacity, and water output data.
Required documents include GST certificate, PAN, recent financial statements, technical bid, OEM authorization, site inspection certificate, and EMD proof. Upload model numbers and performance parameters (Wp, HP, head, daily output) as per tender specifics.
Key specs include Model Number, PV array power (Wp), Motor Pump-Set Capacity (HP), Shut Off Head (m), and Water Output (L/day); all must align with MNRE V2 performance parameters and MNRE testing protocols.
EMD amount is ₹16,440. Submit via GeM online payment or as specified by tender guidelines, ensuring reference to GeM payment gateway with the bid submission.
Site inspection is mandatory before bidding; obtain a Site Inspection Certificate from the designated Junior Engineer/Authorized Officer and upload it to GeM along with the technical bid.
The purchaser may adjust quantity by up to 25%; delivery period may extend based on the formula (Increased quantity / Original quantity) × Original delivery period, with a minimum extension of 30 days.
Bidders must comply with MNRE V2 specifications for SPV pumping systems; ensure model, head, and output meet MNRE performance parameters and obtain relevant certifications listed in the tender terms.
The bidder must provide on-site installation, commissioning, and required resources; ensure proper transport, unloading, installation, and commissioning, with installation-related requirements documented in the submission.
District Rural Development Agency Dahod
📍 DAHOD, GUJARAT
Hingoli District Panchayats
📍 HINGOLI, MAHARASHTRA
Hingoli District Panchayats
📍 HINGOLI, MAHARASHTRA
Pune District Panchayats
📍 PUNE, MAHARASHTRA
N/a
📍 DAHOD, GUJARAT
Sign up now to access all documents
Main Document
GEM_CATEGORY_SPECIFICATION
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS