Carrying out Remaining Incopmlete Work level Survey, Soil Investigation, Detailed Survey Work, Designing etc for Lowering, Laying and Jointing PVC GI Rising Gravity Pipeline from Village Level UG Sump to Faliya, Designing and Constructing of RCC Cistern ESR UGS at Faliya Level, and Pumping Machinery and Supply, Installation, Testing and Commissioning of Pumping Machineries at Existing UG Sump etc. under Remaining Incomplete Work Of Faliya Connectivity of DDSA Package 5 Part 1 and Part 2 Kanjeta Pipero RWSS including Operation and Maintenance For 24 Months For Existing Work and This Tender Scope Work. Tal:-D Baria, Dhanpur Dist.:-Dahod, Gujarat.
Executive Engineer, P.H.Works Division, JalBhavan, 1st Floor, Dahod-389151
DOHAD, GUJARATPosted 21 May9 Months
₹8.7 Cr
NPROCUREService34 DocumentsOpen
Category: Civil - All
Deadline
4 Jun 2026