ZERO TOE LOAD FASTENING SYSTEM (ZTLF) : INSULATED ZTLF FOR 60 KG RAIL OVER H-BEAM SLEEPERS ON GIRDER BRIDGES (B.G.) WITH COMPLETE FITTINGS EXCLUDING ERC (FOR TRACK CIRCUITED AREA) (SPECIFICATION, DRAWING AND ITEM DETAILS AS MENTIONED IN SET DOCUMENTS ARE APPLICABLE) DRG: (RDSO) RDSO/T-9779 To RDSO/T-9789 ALT NIL SPEC: (RDSO) Specs for ZTLF system, (RDSO) T- 55-2025 Revision-01 SET DOC: SET Document FOR RT-9779 To RT-9789.
Organization Not Specified
ASSAMPosted 12 Aug
EMD: ₹2.3 L
IREPSGoods12 DocumentsOPEN
Category: General
Deadline
11 Sept 2026