Removal of spilled over coal, fine dust and wet coal at head end area of BCN-1A/B tunnel along the conveyor, TP-1 including FG-3 and 4 floor, MH-2, module-1 to 10 and tail end area at MH-1 including HGTU by head loads on to running conveyor, apron feeder floor and BCN-2AB tunnel including FG-1 and 2 floor by head loads on to running conveyor required in MM/CHP/BTPS from 01.08.2026 or actual date of commencement of work to 30.11.2026.
Organization Not Specified