TenderDekho Logo
Gear Box state-wide in Andaman & Nicobar

Gear Box Tenders in Andaman & Nicobar

Access live Gear Box procurement tenders in Andaman & Nicobar state

Location
Authority
0

E-285: Servicing of filling valves and replacement of Air and lub oil inlet pipe lines (Size= 25mm)

Indian Coast Guard

NICOBARS, ANDAMAN & NICOBARPosted 16 Dec
GEMGoods6 Documents
Category: E-285: Servicing of filling valves and replacement of Air and lub oil inlet pipe lines (Size= 25mm) , E-284: Servicing and overhauling of portable lub oil pump is to be carried out and proved. , E-282: OBM gear box produces abnormal sound. To be overhauled Make: Mercury 25HP , E-283: 02 nos Domestic RO plant not producing FW. Servicing to be carried out including Spares , E-281: 06 Nos fire hydrants no holding pressure. Locking pins and seals to be replaced and proved
Deadline
6 Jan 2025
View Details

Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C 428; E095 A

Indian Coast Guard

SOUTH ANDAMANS, ANDAMAN & NICOBARPosted 21 Feb
GEMService4 Documents
Category: Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C 428; E095 Abnormal noise observed from AHU compartment of AC plant DIDR carried out by ship staff suspect bearings are worn out Following jobs to be undertaken a.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C 428; E096Fire and General Service pump Discharge valve not holding Valve to be repairedOverhauled and proved for satisfactory operation Size 65 NB; Service Provid.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C 428; E097Lub oil leakage observed from Stbd DA oil drain pipe line Pipe line to be renewedfabricated as sample In way jobs opening of old pipe and fitment of new .. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C 428; E099Copper line of pressure gauges of following pumps Fire and Bilge pump KFWA pump FWater pump uprootedpin hole same to be renewed as per sample along with .. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C 428; E100Sea water leakage observed view multiple pin holes from AC system pipe line Pipe line to be fabricatedrenewed All inway job include removal of fitted pip.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C 428; E101Hydraulic door closure for Water jet entrance door uprooted and door closure to be repaired fitment of the same with suitable fastners to be carried out .. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C 428; E102Anti rust coating of both shaft from gear box to bulk head area were peeled off antirust coat to be applied on both shaftLength 04 Mtr; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C 428; E103Low air flow and ice formation observed on evaporator coil and air not cooling as per requirement of AC plant DI carried out by SS and found evaporator c..
Deadline
27 Feb 2025
View Details

Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C414 campbell

Indian Coast Guard

SOUTH ANDAMANS, ANDAMAN & NICOBARPosted 21 Feb
GEMService4 Documents
Category: Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C414 campbell way; E66 Port DA sea water suction line punctured at various places Same to be renewed repaired Mat SS Dia 40mm Length 2 mtr; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C414 campbell way; E67 DA emergency sea water suction line punctured and cracked at various places Same to be renewed repaired Mat SSDia 50mm Length 2 mtr; Service .. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C414 campbell way; E68 SME Gear box sea water cooling line punctured at various places Same to be renewed repaired mat SS dia 50mm Length 2Mtr; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C414 campbell way; E70 Water jet compartment bilge suction line punctured near STBD DA Same to be places Repaired Mat SS Dia 40mm Length 4 Mtrs; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C414 campbell way; E71 Pressure gauges of all pump to be calibrated renewed In way jobs including replaced defective guage lines and fittings Qty 13 Nos; Service Pr.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C414 campbell way; E78 WireMess gratings of ER ventilation are deteriorated Same to be renewed fabricated as per sample Mat MS Qty 04 Nos L2 meter B2 Meter; Service.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C414 campbell way; E79 ER Ventilation water drain trey deteriorated Same to be renewed fabricated as per sample MatSS Qty 04 Nos Length 2 Meter Breadth 2 Meter; Ser.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C414 campbell way; E80 Overhaul Diesel driven pump to be undertaken worn out parts to be replaced Diesel driven pump and engine to be scrubbed and one coat of prime.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C414 campbell way; E81 Overhauling of diving air compressor to be undertaken and worn out parts to be replaced Compressor and Engine to be scrubbed one coat of prim.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C414 campbell way; L42 WJ STBD exhausts blower motor getting tripped instantly after switching ON Suspect motor winding short circuited and bearing worn out Defect .. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C414 campbell way; L46 Hanging support of WJ port blower found deteriorated Same to be repaired and system to be proved Mat MS; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C414 campbell way; L47 Wiremess fencing for main engine and DAs batteries deteriorated Same to be repaired Mat AL Length 2m Height 1M; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C414 campbell way; L48 Navigation Communication battery cover for protection from Rain Moisture on flag deck to be fabricated Mat Al Length 100 cm Hieght 30CM; Serv..
Deadline
27 Feb 2025
View Details

Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C-424; E 085

Indian Coast Guard

SOUTH ANDAMANS, ANDAMAN & NICOBARPosted 28 Mar
GEMService4 Documents
Category: Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C-424; E 085 Both DA exhaust Line Sea water leakage and salt formation observed in both DA exhaust line In way job includes a Test water injection pipe and nozzle .. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C-424; E 086 Chequered Plate Chequered plates carpet area approx 12 mtrs in engine room and water Jet are highly rusted deteriorated All plates along with supportin.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C-424; E 087 Lagging lagging is required to be renewed at below mentined location a Hot lagging in engine room on port and stbd side Area 5 sqmtrs b Aluminium laggi.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C-424; E 088 Port Gear box sea water cooling line Following jobs to be undertaken on Gear box sea water cooler cooling pipe line a Chemical cleaning of port gear bo..
Deadline
3 Apr 2025
View Details
Chat with us