48 Core Single Mode unarmourmed Optical Fiber Cable,24 Core Single Mode unarmoured OFC,Cemented Pip
Indian Air Force
DIBRUGARH, ASSAMPosted 1 May
EMD: ₹96,024
GEMGoods4 Documents
Category: 48 Core Single Mode unarmourmed Optical Fiber Cable , 24
Core Single Mode unarmoured OFC , Cemented Pipe Dia
150mm for routing of OFC under ground , OFC Splice
Enclosure , GI Pipe for road crossing dia 150mm ,
Construction of manhole Cemented dimension 04 ft X 04 ft
X 04 ft with iron cover , 48 core FDF LIU , 24 core FDF LIU ,
144 core FDF LIU , Route markers , CatVI UTP Cable , CatVI
STP cable , RJ45 24 Port Patch Panel , RJ45 Keystone Jack ,
IO Box , Casing Capping 1 inch X 6 ft , Casing Capping
2inchX 6 ft , Casing Capping 4inchX 2inch X 6 ft , Laying and
installtion of UTP STP cable in casing caping , Velcro for
routingtieing OFC patch cord , High Density OFC cable
raceway Made of High density PVC, Colour Yellow , Inter
facility Buffer cable 48 core OFC Patch cord with LC
Connector at both end 5Mtr , Inter facility Buffer cable 24
core OFC Patch cord with LC Connector at both end 5Mtr ,
05 Mtr OFC patch cord duplex for inter connectivity , 10 Mtr
OFC patch cord duplex for inter connectivity , 02 Mtr LC to
LC OFC patch cord duplex , 01 Mtr LC to LC OFC patch cord
duplex , 02 Mtr UTP patch cord , 01 Mtr UTP patch cord ,
Armored UG cable of 200 pair , DP Box of 200 pair for UG
cable termination with krone module INCLUDING
INSTALLATION , Digging and laying of OFC and JFC at depth
of 1.65 Mtr and 2 ft width as per BSNL IAF standards to lay
multiple OFCs in two separate concrete pipes , Splicing of
24 and 48 core OFC at existing site 2 equipment room and
NFS PKG site , Provision of iron rack mounting stand as per
rack dimensions for positioning of equipment and server
rack Dimension , Metallic OFC cable raceway passing inside
raised flooring from OFC entry point to HD FDF of dimension
60 ft long x 1 ft wide x 4 inch height including installation ,
Procurement and installation of DC electric power cable
50Sq mm , Procurement and installation of DC Electric
Distribution Box , Procurement and installation of 10 Sq mm
4 core electric power cable , Procurement and installation of
25 Sq mm 4 core flexible electric copper cable ,
Procurement and installation of distribution box 150 Amps ,
Procurement and installation of eyelet lugs cable 50 Sq ,
Procurement and installation of eyelet lugs cable 10 Sq ,
Procurement and installation of eyelet lugs cable 25 Sq ,
Removal of 42 U Rack from existing site and installation with
grouting at new site , MCCB 150 Amps , 3 Phase MCB 63
Amps , Single Phase Two Pole MCB 32 Amps , Single Phase
Two Pole MCB 63 Amps , 3 Phase SPD Type1 , Cable Tray
with cover for Electric cables including installation
Deadline
22 May 2025