โข Laying storm water pipelines across designated areas in Vatwa Ward, ensuring proper alignment and capacity.
โข Constructing catch pits at specified locations to facilitate effective water drainage and prevent flooding.
โข Repairing existing catch pits at various sites to restore functionality.
โข Ensuring compliance with technical specifications and safety standards.
โข Site clearance and preparation before commencing work.
โข Post-construction testing and quality checks to verify proper installation.
| Key Deliverables |
Specifications |
| Storm water pipelines |
Diameter: 150mm to 300mm, Material: PVC/RC |
| Catch pits |
Dimensions: 1m x 1m, Reinforced concrete |
| Repair works |
Includes cleaning, sealing, and structural repairs |
- Site survey and marking of pipeline routes and catch pit locations.
- Procurement of materials as per specifications.
- Laying pipelines following approved drawings.
- Construction and repair of catch pits.
- Final inspection and handover of completed work.
All work must adhere to local municipal standards and safety regulations.