• Provide skilled manpower, gate operators, and unskilled workers for flood control activities at Dhrafad Irrigation Scheme.
• Execute works as per Schedule ‘B’, including specific qualifications, applicable leads, lifts, and mix proportions.
• Prepare detailed construction planning and methodology supported with layouts, drawings, and calculations.
• Deploy appropriate equipment and plant capacity, ensuring cycle times match project requirements.
• Complete all tasks within the stipulated 5-month period.
• Ensure all work adheres to technical specifications outlined in tender documents, including safety and quality standards.
• Submit comprehensive proposals covering work methods, schedules, and resource deployment for review.
| Key Deliverables |
Description |
| Manpower Deployment |
Skilled, gate operators, and unskilled workers as per project needs |
| Construction Planning |
Detailed methodology, layouts, and drawings |
| Equipment Utilization |
List of machinery, capacity, and cycle times |
| Compliance |
Adherence to technical specifications and safety standards |
| Completion Timeline |
5 months from start date |
• The successful bidder must furnish a solvency certificate of 20% of the tender amount from a scheduled or nationalized bank.
• Bidders should read tender specifications carefully and prepare proposals accordingly, including all applicable qualifications and experience details.