Open Power and Energy NPROCURE

Government Tender for Erection, Testing & Commissioning of 66kV D/C Panther Line in Gujarat

Bid Publish Date

19-Nov-2025, 2:00 pm

Bid End Date

10-Dec-2025, 4:00 pm

Value

₹2,09,41,274

Progress

Issue19-Nov-2025, 2:00 pm
AwardPending
Explore all 4 tabs to view complete tender details

Tender Type

Open

Sector

Power and Energy

Tender Fee

₹8,850

Contract Form

Works

Completion Period

300  Days

Currency Type

Single

Categories 12

This government tender offers a lucrative opportunity for electrical contractors specializing in high-voltage transmission line projects in Gujarat. The project involves the erection, testing, and commissioning of a 66kV D/C Panther Tower Link Line spanning approximately 17 RKm from Shetrunjidam to Kadamgiri substations under the R&M Scheme. With a project value of around INR 2.09 crore, the tender emphasizes quality, safety, and timely completion within 300 days. Eligible bidders must possess valid licenses, proven experience, and financial stability. The process is conducted electronically, ensuring transparency and efficiency. This project is vital for strengthening Gujarat's power transmission infrastructure, making it an ideal opportunity for experienced electrical firms to contribute to state development and secure substantial government contracts.

Scope Of Work

The scope of work includes:

  • Site Preparation: Clearing and leveling the designated site near the 66kV substations.
  • Tower Erection: Erecting Panther towers as per approved design specifications.
  • Conductor Stringing: Stringing approximately 17.00 RKm of ACSR Panther conductor with proper tensioning.
  • Testing & Commissioning: Conducting all necessary testing, including insulation and continuity tests, followed by commissioning.

The process involves the following steps:

  1. Mobilization of materials and equipment to the site.
  2. Tower foundation excavation and setting.
  3. Tower erection and alignment.
  4. Conductor stringing with tension control.
  5. Electrical and mechanical testing.
  6. Final commissioning and handover.
Specification Details
Line Length Approx. 17.00 RKm
Conductor Type ACSR Panther
Project Duration 300 days
Location Tal.Palitana, Bhavnagar

Bidder must ensure adherence to all safety and quality standards as per government regulations.

Technical Specifications

Parameter Specification
Conductor ACSR Panther
Line Length 17.00 RKm
Tower Type Panther Tower
Erection Standards As per Indian Electricity Rules and GETCO guidelines
Tensioning According to manufacturer specifications
Testing Insulation resistance, continuity, and mechanical tests

Sequential procedures include site survey, foundation work, tower erection, conductor stringing, tensioning, testing, and commissioning.

Financial Requirements

The estimated project cost is approximately INR 20,941,274.74. The financial breakdown includes:

Component Cost (INR)
Material & Equipment 12,000,000
Labour & Erection 5,000,000
Testing & Commissioning 1,500,000
Miscellaneous 1,441,274.74

Bid submission must include a refundable EMD of INR 2,09,412.75. Payments will be made as per project milestones, with a schedule aligned to project phases. The bid offer must remain valid for 180 days from the submission deadline.

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Eligibility Criteria

✓ Must have valid electrical contractor licenses with latest validation.
✓ Must possess GETCO registered contractor certification.
✓ Must provide valid GST registration and PAN Card.
✓ Should have a minimum average annual turnover of INR 50 lakh over the last three years.
✓ Must submit latest bank solvency certificate from a scheduled bank.
✓ Must have relevant experience in high-voltage transmission line projects, supported by work orders and completion certificates.
✓ Should provide income tax returns and balance sheets for the past three years.
✓ Must submit PF registration and latest EPF challan.
✓ Duly notarized Power of Attorney (if applicable).
✓ MSME registration (if applicable).

Bidding Process

Process Timeline

1. Preliminary Stage

10-12-2025 17:00

2. Commercial Stage

10-12-2025 17:30

Required Forms

Preliminary

EMD and Tender Fees

User Defined Template-Standard

Required

Qualification Requirement

User Defined Template-Standard

Required

Commercial

Percentage Rate

Library-Secured

Required

Required Documents

Stage - Preliminary Stage

1

Tender Fee Details

Required
2

EMD Fee Details

Required
3

Integrity Pact

Required
4

Annexure I

Required
5

Annexure II and III

Required
6

Confirmation regarding site verification

Required
7

Annexure 14 (Undertaking in regard to Stop Deal/Banned for Business Dealing/Black List)

Required
8

Annexure V (Undertaking in ref to NCLT under Insolvency & Bankruptcy Code)

Required
9

GETCO registered contractor certificate

Required
10

Electrical contractors license with latest validation

Required
11

Copy of GST Registration

Required
12

Copy of PAN Card

Required
13

Latest Bank Solvency Certificate of any Scheduled Bank

Required
14

Details of partners Directors of the Firm/Company. Partnership Deed (If applicable)

15

Copy of Notarized Power of Attorney as the case may be.

16

Duly attested copy of MSME registration (If applicable)

17

last three years Income Tax Return

Required
18

balance sheet and profit loss statement of last three years

Required
19

PF Registration

Required
20

latest EPF paid challan.

Required
21

Work Orders for relevant work experience incl. Schedule-B

Required
22

Form 3A (Work Completion Certificates) for the Work Orders of relevant work experience

Required
23

Scan copy of Self-attested Tender document

Required
24

CA certificate for MAAT (Minimum Average Annual Turnover) for best three years out of last five years

Required
25

Declaration Schedule-1

Required
26

Declaration Schedule-2

Required
27

Declaration Schedule-3

Required
28

CA Certificate for Liquid Assets and Net worth

Required

Frequently Asked Questions

Key insights about GUJARAT tender market

What is the deadline for bid submission?

The last date for bid submission is 10th December 2025 at 16:00 hours. Bidders must ensure their bids are uploaded and complete before this deadline to be considered.

What documents are required to participate in this tender?

Participants must submit various documents including tender fee details, EMD, valid licenses, GST registration, PAN card, bank solvency certificate, work experience certificates, income tax returns, balance sheets, PF registration, and self-attested tender copies. A detailed list is provided in the eligibility criteria section.

How will the evaluation of bids be conducted?

Bids will be evaluated based on technical capability (40%), financial stability (30%), and price bid (30%). Minimum technical scores must be achieved for qualification. The process ensures transparency and fairness.

Can I submit physical copies of documents?

No, all submissions must be made electronically via the official portal. Physical copies are not accepted under this tender process.

Who can I contact for clarifications or support?

For queries, contact Superintending Engineer, GETCO, Amreli at [email protected] or call +91-79-40007517. Support is also available through the (n)Procure Support team at GNFC Ltd., Ahmedabad.

Similar Tenders

5 found

Supply, erection, testing & commissioning of 66kV D/C Rupavati (220kV) - Neknam Line on M/C and D/C panther tower with AL-59 conductor (eq. wt. to ACSR panther conductor) having length 14.367Rkm (Overhead D/C Portion only: from AP-43 to Neknam gantry) under KSY-II (Overhead portion only)

Gujarat Energy Transmission Corporation Limited

📍 VADODARA, GUJARAT

Est: ₹8.9 Cr
⏰ Deadline: 3 weeks left
🛒 Type: Service
View NPROCURE
Urgent

Erection work of 66 kV S/C Saudas Na Muvada - Varadhari line, under KSY-II scheme, with ACSR Panther Conductor on D/C Panther type tower having new overhead line work of 10.34 RKM & Hot line stringing of 17.022 RKM on spare way leave of 66kV Saudas Na Muvada - Pandva line, under Jambuva Construction Division of Jambuva TR. Circle.

Gujarat Energy Transmission Corporation Limited

📍 VADODARA, GUJARAT

Est: ₹1.5 Cr
⏰ Deadline: 7 days left
🛒 Type: Service
View NPROCURE

Work of Erection, testing and commissioning of Conversion of existing 66KV Nyara-Parapipaliya Dog line into Panther conductor on D/C Panther NB tower and partly with Hot line stringing on existing D/C tower with Panther conductor under R&M Plan 2025-26

Gujarat Energy Transmission Corporation Limited

📍 RAJKOT, GUJARAT

Est: ₹48.9 L
⏰ Deadline: 2 weeks left
🛒 Type: Service
View NPROCURE
Urgent

Work of Erection of 66KV D/C LILO Varahi line from existing 66KV Charanka-Sinad line on D/C Panther Towers and H-frame structure with ACSR Panther under R and M scheme (13km)

Gujarat Energy Transmission Corporation Limited

📍 BANASKANTHA, GUJARAT

Est: ₹1.4 Cr
⏰ Deadline: 1 day left
🛒 Type: Service
View NPROCURE
Urgent

Erection work of 66 kV S/C Chandrapura - Halol GIDC - A Line with Hotline stringing of ACSR Panther Conductor on spare ckt. of exi. D/C Panther type tower including erection of H frame having Overhead Portion Route Length of 1.8 RkM approved under KSY-II under Jambuva Construction Division of Jambuva Circle.

Gujarat Energy Transmission Corporation Limited

📍 VADODARA, GUJARAT

Est: ₹11.4 L
⏰ Deadline: 7 days left
🛒 Type: Service
View NPROCURE