• Provide and lay RCC pipes ranging from 150mm to 350mm diameter (NP-2/NP-3/Np-4) in designated areas of Borsad.
• Repair existing drainage pipelines to ensure proper flow and prevent blockages.
• Excavate and prepare trenches according to technical specifications.
• Install new pipelines with appropriate bedding and backfilling.
• Connect pipelines to existing drainage networks.
• Test and commission the installed drainage systems.
| Specification |
Details |
| Pipe Diameter |
150mm to 350mm |
| Pipe Type |
RCC NP-2/NP-3/Np-4 |
| Length of work |
As per site requirement |
| Completion Period |
12 months |
- Mobilize resources and materials.
- Conduct site survey and prepare work plan.
- Execute excavation and pipe laying.
- Perform jointing, testing, and commissioning.
- Complete backfilling and site restoration.
- Final inspection and handover.
Key deliverables include detailed work reports, quality assurance documents, and completion certificates.