The estimated project cost is ₹532,807.20, which includes manpower wages, safety gear, and administrative expenses. Payment will be made in installments based on milestones achieved and verified by the Deputy Executive Engineer.
| Cost Breakdown |
Amount (₹) |
| Labour wages |
Included |
| Safety and gear |
Included |
| Administrative costs |
Included |
| Contingency |
As per contract |
Bidders must submit a detailed financial proposal along with the bid, including breakdowns of wages, benefits, and other expenses. Payment terms are linked to project milestones and verified deliverables. All financial documents should be valid and conform to the guidelines specified in the tender.