ASM Half Shaft Rear,k Regulator Adopter,Hose Intak,Box Intak Clutch,Plate Groud Clutch Cover
Indian Army
KUPWARA, JAMMU & KASHMIR
Bid Publish Date
03-Jan-2026, 2:39 pm
Bid End Date
24-Jan-2026, 3:00 pm
Location
Progress
Quantity
7
Category
Support Bumper front matte Black
Bid Type
Two Packet Bid
Organization: Indian Army, Department Of Military Affairs. Location: Baramulla, Jammu & Kashmir - 193101. Product category: 组合件与部件套装,包含前保险杠前涂装件(Matte Black)、ASM Half Shaft rear、Kit Boot Plunging Joint、Washer Ring、O Ring 等五项。Quantity/Estimated Value: 未披露,BOQ 未给出具体数量。Delivery/Timing: 以原始交货日期为基准,含“增减25%”的可选条款,若执行时延,计算公式为 (增加数量/原始数量) × 原始交付期,最低30天。Unique differentiator: 明确包含选项扩量及相应的交货期限算法,强调样品在48小时内提交的时间约束。Context/Opportunity: 以军品供应链为主的招标,要求厂商具备快速响应能力与样品提交时效。
Product names: front bumper matte black, ASM Half Shaft rear, Kit Boot Plunging Joint, Washer Ring, O Ring
Quantity/Value: not disclosed; 25% quantity flex allowed
Sample requirement: all product samples due within 48 hours after opening tech bid
Delivery: base delivery period, with option to extend per clause; minimum 30 days for extended period
Documentation: PAN, GSTIN, cancelled cheque, EFT mandate required with bid
25% quantity variation allowed by purchaser
Samples must be provided within 48 hours of bid opening
Documents: PAN, GSTIN, cancelled cheque, EFT mandate required
Not explicitly defined in tender; bidders must align with standard Indian Army procurement terms and provide EFT-based payment methods as part of submission
Delivery period starts from the last date of original delivery order; extended period calculated by (additional quantity/original quantity) × original delivery period, minimum 30 days
Not specified; bidders should anticipate standard LD provisions tied to delivery delays per contract
Must submit PAN and GSTIN copies
Must provide cancelled cheque and EFT mandate certified by bank
Must comply with 48-hour sample submission for all products
Indian Army
KUPWARA, JAMMU & KASHMIR
Indian Army
TAWANG, ARUNACHAL PRADESH
Indian Army
AMBALA, HARYANA
Indian Army
PITHORAGARH, UTTARAKHAND
Indian Army
PITHORAGARH, UTTARAKHAND
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Support Bumper front matte Black | Not know | 1 | nos | ocfri3@18rr | 21 |
| 2 | ASM Half Shaft rear | Not know | 1 | nos | ocfri3@18rr | 21 |
| 3 | Kit Boot Plunging Joint | Not know | 1 | nos | ocfri3@18rr | 21 |
| 4 | Washer Ring | Not know | 2 | nos | ocfri3@18rr | 21 |
| 5 | O Ring | Not know | 2 | nos | ocfri3@18rr | 21 |
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN copy
Cancelled cheque copy
EFT Mandate copy certified by bank
Vendor code creation documents
Key insights about JAMMU AND KASHMIR tender market
Bidders must submit PAN Card copy, GSTIN copy, Cancelled Cheque, and EFT Mandate certified by bank along with vendor code creation documents. These form the core eligibility pack to participate in the Indian Army procurement from Baramulla, Jammu & Kashmir.
The Purchaser may increase or decrease quantity up to 25% at contract placement and during currency at contracted rates. Extended delivery time uses the formula (increased quantity ÷ original quantity) × original delivery period, with a minimum 30 days.
Sample of all products must be provided within 48 hours after open technical bid; failure to comply results in disqualification. Ensure you have rapid sample preparation and courier readiness.
The scope includes five items: Front bumper matte black, ASM Half Shaft rear, Kit Boot Plunging Joint, Washer Ring, and O Ring. Precise dimensions and compatibility details are not specified in the data provided.
Original delivery period is stated, with possible extension up to 25% of quantity. If exercised, extended time equals (additional quantity/original quantity) × original delivery period, minimum 30 days from last original delivery date.
Prepare core eligibility documents (PAN, GSTIN, EFT Mandate), ensure 48-hour sample readiness for all five components, adhere to 25% quantity flex rules, and align with standard Army payment terms and delivery calculations.
The data does not specify exact standards; bidders should align with typical military procurement quality controls, ensure traceability for each component, and be prepared to provide conformity/test certificates if requested.
Delivery terms are governed by the option clause allowing up to 25% quantity variation and the computed extended delivery period; minimum 30 days, with delivery starting from the last date of the original order.
Indian Army
📍 JALANDHAR, PUNJAB
Indian Air Force
📍 WEST DELHI, DELHI
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS