TenderDekho Logo
GEM

Indian Air Force Fume Extraction Unit Tender for Soldering Fumes in India 2026 - CE RoHS, Demonstration & Training

Bid Publish Date

12-Jun-2026, 11:34 am

Bid End Date

20-Jun-2026, 12:00 pm

Location

CHANDIGARH , CHANDIGARH

Progress

Issue12-Jun-2026, 11:34 am
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

3

Bid Type

Two Packet Bid

Key Highlights

  • CRITICAL: CE marked fume extraction unit for soldering fumes with ROHS compliance
  • MANDATORY: Demonstration and operator training included in procurement scope
  • OPTION CLAUSE: Up to 25% quantity variation during contract with corresponding delivery time calculations
  • EMD requirements aligned to standard government practice (amount not disclosed in data)
  • Delivery timeframe governed by original delivery period; extended period rules apply
  • Qualification: Bidders must fill compliance matrix with firm stamp to avoid disqualification
  • Warranty: Specific years to be clarified in the final tender; ensure warranty coverage post-installation
  • Brand/OEM: No explicit brand requirement; ensure CE/ROHS and IS/quality certifications if applicable

Categories 8

Tender Overview

Organization: Indian Air Force (Department Of Military Affairs) | Product: Fume extraction unit for soldering fumes | Location: Not disclosed (India) | Category: Fume extraction unit, soldering fumes | Estimated Value/EMD: Not disclosed; scope limited to supply of goods | Delivery/Scope: Only supply of Goods with option to scale quantity by up to 25%; delivery period details not specified | Differentiators: CE marked, ROHS marked, demonstration and training included, warranty terms to be confirmed | Context: Government procurement for metalworking safety equipment; emphasis on standards compliance and post-purchase support

Technical Specifications & Requirements

  • Product name: Fume extraction unit for soldering fumes | Standards: CE marked, ROHS marked | Key specs (not fully detailed in tender):
    • Power consumption: Not specified; require supplier data
    • Stages of filtration: Not specified; expect multi-stage filtration
    • Filter surface area: Not specified; bidders must provide vendor data sheets
    • Number of channels: Not specified; bid should clarify capacity
    • Maximum flow rate: Not specified; must be specified in technical bid
    • Noise level: Not specified; provide measured dB
    • Maximum turbine vacuum: Not specified; provide performance data
    • Speed regulator: Required for fume extraction
    • Training & demonstration: Included in scope
    • Warranty: Not specified; determine duration

Terms, Conditions & Eligibility

  • EMD/Delivery Terms: Not disclosed; bidders must comply with standard government EMD requirements and option clause allowing ±25% quantity adjustment at contracted rates
  • Delivery Timeline: Not specified; delivery commencement aligned to order terms with extended period rules if option clause is exercised
  • Documents: Must download and sign compliance matrix; upload with firm rubber stamp
  • Warranty & Support: Warranty period to be specified in bid; demonstration and training included
  • Scope: Purchase of goods only; no service scope implied; adherence to buyer terms required

Key Specifications

  • Product: Fume extraction unit for soldering fumes

  • Standards: CE marked, ROHS marked

  • Key parameters to be provided by bidder: power consumption, filtration stages, filter surface area, number of channels, maximum flow rate, noise level, maximum turbine vacuum, speed regulator

  • Include: demonstration and operator training requirements, warranty duration

  • Delivery: supply-only contract with option for quantity adjustment up to 25%

Terms & Conditions

  • EMD and standard government procurement compliance are required

  • Up to 25% quantity variation allowed during and after contract

  • Complete supply of goods with demonstration, training, and warranty terms

  • Compliance matrix to be downloaded, filled, and submitted with rubber-stamped signature

Important Clauses

Payment Terms

Payment terms to be defined in final bid; ensure alignment with government procurement norms and any negotiated advances or milestones

Delivery Schedule

Delivery period governed by original delivery order; extended time calculation applies when option clause is exercised

Penalties/Liquidated Damages

Penalties or LD provisions to be specified in the tender; ensure compliance with deadlines and performance benchmarks

Bidder Eligibility

  • Experience in supplying safety-related ventilation or fume extraction units to defense or government bodies

  • Proven capability to meet CE and ROHS certification requirements

  • Financial stability evidenced by latest audited statements

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Fume extraction unit for filteration of soldering fumes (Q3)

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN AIR FORCE

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9458642.pdf

Main Document

CATALOG-Specification-1

CATALOG Specification

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Fume extraction unit for filteration of soldering fumes

Directorate Of Purchase And Stores

MUMBAI, MAHARASHTRA

Posted: 18 February 2026
Closed: 3 March 2026
GEM

Fume extraction unit for filteration of soldering fumes

Bharat Electronics Limited (bel)

GHAZIABAD, UTTAR PRADESH

Posted: 22 April 2025
Closed: 2 May 2025
GEM

Fume extraction unit for filteration of soldering fumes

Bharat Electronics Limited (bel)

HYDERABAD, TELANGANA

Posted: 9 January 2025
Closed: 11 February 2025
GEM

Fume extraction unit for filteration of soldering fumes

Southern Railway

COIMBATORE, TAMIL NADU

Posted: 14 January 2026
Closed: 5 February 2026
GEM

Fume extraction unit for filteration of soldering fumes

Electronics Corporation Of India Limited

HYDERABAD, TELANGANA

Posted: 10 June 2025
Closed: 20 June 2025
GEM

Technical Specifications 1 Item

Item #1 Details

View Catalog
Category Specification Requirement
GENERIC Power consumption 120 W
GENERIC Stages of filteration 3(Pre filter, main filter and gas filter)
GENERIC Filter surface area(In sq. mtr.) Others
GENERIC No of channels 2
GENERIC Maximum flow rate >/=190 cubic m/h
GENERIC Noise level 51 dB,at a distance of 1m
GENERIC Maximum turbine vaccum 3000 pa
GENERIC Speed regulator for fume extraction 4
GENERIC CE marked Yes
GENERIC ROHS Marked Yes
GENERIC Demonstration and training Yes
WARRANTY Warranty(In years) 1

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar safety equipment procurement

4

Financial statements (latest audited) or equivalent

5

EMD/Security deposit payment proof

6

Technical bid documents and product data sheets

7

OEM authorizations (if applicable) and CE/ROHS certification copies

8

Compliance matrix filled and signed with firm stamp

Frequently Asked Questions

How to bid for the IAF fume extraction unit tender 2026 in India

Bidders must submit GST, PAN, experience certificates, financials, EMD proof, technical data sheets, OEM authorizations if required, and the signed compliance matrix. Ensure CE and ROHS certificates are included; delivery terms follow the option clause for up to 25% quantity variation.

What documents are required for the soldering fumes unit tender in India

Submit GST registration, PAN, audited financial statements, experience certificates for similar safety equipment, EMD document, technical bid with product data, OEM authorization (if applicable), CE/ROHS certificates, and the compliance matrix signed with official stamp.

What standards and certifications are required for the fume extractor

The tender requires CE marking and ROHS compliance; bidder should provide certification copies and ensure technical data demonstrates conformance to these standards, along with safety and installation documentation.

When is the delivery timeline and option clause for quantity variation

Delivery timelines align to the original delivery order; the option clause permits up to 25% quantity variation during contract, with time adjustments calculated as (additional/original quantity) × original period, minimum 30 days.

What is the scope of supply for the IAF unit tender

Scope is limited to supply of goods only; no on-site services are specified in the provided terms, though demonstration and training are included as part of the tender requirements.

What should be included in the compliance matrix for submission

Download the matrix, mark Yes/No for each clause, and upload with firm rubber stamp; non-compliance may lead to disqualification, and no clarification will be asked later.

What warranty terms should bidders anticipate for the fume extractor

Warranty duration is not specified in the data; bidders should specify a clear warranty period in their bid and ensure post-purchase support and replacement policies are documented.

Similar Tenders

5 found
Urgent

Fume extraction unit for filteration of soldering fumes

Bharat Electronics Limited (bel)

📍 BANGALORE, KARNATAKA

⏰ Deadline: 2 days left
🛒 Type: Goods
View GEM
Urgent

North Eastern Railway Fume Extraction Unit Tender for Soldering Fumes 120W 3-Stage Filtration 250 m3/h CE/ROHS 2026

North Eastern Railway

📍 GORAKHPUR, UTTAR PRADESH

⏰ Deadline: 5 days left
🛒 Type: Goods
View GEM

Indian Army Advanced Polarization Microscope and Solder Fume Extraction Tender Leh Jammu & Kashmir 2026

Indian Army

📍 LEH, JAMMU & KASHMIR

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM
Urgent

Welding Fume Extraction System

Indian Navy

📍 RAIGAD, MAHARASHTRA

⏰ Deadline: 6 days left
🛒 Type: Goods
View GEM

Fume Extraction System Duct, Bend & Chimney.

Bharat Heavy Electricals Limited (bhel)

📍 HARIDWAR, UTTARAKHAND

⏰ Deadline: 3 weeks left
🛒 Type: Goods
View GEM