Armoured Vehicles Nigam Limited Tube Tender Avadi Chennai GOST 8734-75 & 8733-87 2025
Armoured Vehicles Nigam Limited
TIRUVALLUR, TAMIL NADU
Bid Publish Date
01-Jun-2026, 9:15 am
Bid End Date
22-Jun-2026, 9:00 am
Location
Progress
Quantity
2
Category
HOT SWAGGING MACHINE WITH TUBE
Bid Type
Two Packet Bid
Hindustan Aeronautics Limited (Department of Defence Production) in Nashik, Maharashtra seeks procurement of a Hot Swaging Machine with Tube and a Tube Straightener. The scope covers supply, installation, testing, commissioning and training of operators, with on-site statutory clearances if required. Delivery timelines are schedule-based: 9 months for the hot swaging machine and 6 months for the straightening machine from GeM contract placement. A minimum 12-month warranty from installation/acceptance is specified, with on-site installation by HAL within 30 days of machine receipt. Training for two HAL personnel is included. MSMEs have favorable payment terms: 15% advance against a BG, with the balance 85% within 30 days of receipt/acceptance; otherwise, full payment within 30 days. The bidder must upload signed technical compliance to ATT C documents and provide a signed compliance statement for the buyer's technical specifications.
Product: Hot Swaging Machine with Tube; Tube Straightener
Delivery: Hot swaging 9 months; straightening 6 months from contract placement
Warranty: 12 months from installation and acceptance at HAL site
Installation: On HAL site within 30 days of machine receipt
Training: 2 HAL personnel
Payment for MSMEs: 15% advance with BG; 85% within 30 days; or 100% within 30 days if advance not availed
EMD not specified in available data; bidders should verify with HAL
Delivery schedules are clearly defined for each machine type
Technical compliance must be signed and uploaded for evaluation
MSME terms: 15% advance against BG, 85% within 30 days of receipt/acceptance; or 100% within 30 days if advance not claimed.
Hot swaging machine within 9 months; straightening machine within 6 months from GeM contract placement.
Minimum 12-month warranty from installation/acceptance; on-site installation by vendor within 30 days of receipt at HAL site.
Capability to deliver and install hot swaging and tube straightening machinery at HAL Nashik site
Compliance with signed technical specifications and ATC requirements
MSME status confirmation and ability to provide advance BG if applicable
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
HOT SWAGGING MACHINE WITH TUBE , SWAGING TUBE STRAIGHTNER
Trusted by 5,000+ companies to find, track, and win government tenders.
Our team will walk you through the platform and help set up your profile — free, no commitment.
Our team will reach out to schedule your free session.
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Armoured Vehicles Nigam Limited
TIRUVALLUR, TAMIL NADU
N/A
BENGALURU URBAN, KARNATAKA
Indian Oil Corporation Limited
MATHURA, UTTAR PRADESH
N/A
UDAM SINGH NAGAR, UTTARAKHAND
N/A
ROHTAK, HARYANA
Tender Results
Loading results...
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN copy
Cancelled cheque copy
EFT Mandate copy certified by bank
Signed compliance to attached technical specifications
MSME category confirmation (Women/SC-ST)
Any statutory clearance documents (if applicable)
Proof of on-site installation capability and training plan
Key insights about MAHARASHTRA tender market
Bidders must prepare PAN, GSTIN, cancelled cheque, EFT mandate, and signed compliance to the technical ATC. Ensure delivery schedules: 9 months for hot swaging and 6 months for straightening, with 12-month warranty after installation. MSME terms may apply; submit BG for 15% advance if opting, otherwise 100% within 30 days.
Submit PAN, GSTIN, cancelled cheque, EFT mandate, and signed compliance to the Buyer Specification Document. Include proof of installation capability, training plan for two HAL personnel, and any MSME category confirmations. Ensure compliance with attached technical specifications to avoid rejection.
The hot swaging machine must be delivered within 9 months from contract placement; the tube straightening machine within 6 months. Installation/commissioning occurs at HAL site within 30 days of receipt, followed by operator training. Non-compliance may affect bid evaluation.
A minimum 12-month warranty starts from installation and acceptance at HAL site. The warranty covers material and workmanship; vendor must provide installation and initial training within the warranty period, with post-installation support as per vendor terms.
Yes. MSMEs may receive 15% advance against a BG of equivalent amount, with the balance 85% paid within 30 days of receipt/acceptance; alternatively, if advance is not sought, 100% payment is made within 30 days post-acceptance at HAL stores.
Upload signed compliance to the attached technical specifications (ATC) and ensure all items in the Buyer Specification Document are addressed. Non-compliance can lead to bid rejection; ensure operator training plan and installation procedures are included.
Scope includes supply, installation, testing, commissioning, operator training, and providing any required statutory clearances. The bid must reflect all cost components; ensure compatibility with HAL site installation requirements and schedule adherence.
Damodar Valley Corporation
📍 KODERMA, JHARKHAND
Bharat Heavy Electricals Limited (bhel)
📍 VELLORE, TAMIL NADU
Indian Army
📍 KUPWARA, JAMMU & KASHMIR
Council Of Scientific And Industrial Research (csir)
📍 CHENNAI, TAMIL NADU
Border Road Organisation
📍 LEH, JAMMU & KASHMIR
Sign up now to access all documents
Main Document
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS