Indian Army UPS 1KVA, DVD Writer Internal Slim, SMPS, Keyboard & Mouse, CMOS Battery Tender Sonitpur Assam 2026
Indian Army
SONITPUR, ASSAM
Bid Publish Date
22-Jan-2026, 6:05 pm
Bid End Date
02-Feb-2026, 7:00 pm
Progress
Quantity
20
Category
Maintenance box EPSON L1460
Bid Type
Two Packet Bid
The Indian Army, Department Of Military Affairs, seeks procurement of maintenance peripherals including Maintenance box EPSON L1460, Maintenance box EPSON EP9350, UPS Bty 12V-2AH, Pickup roller set, and Keyboard. The BOQ lists 5 items with unspecified quantities, and the estimated value is not disclosed. The buyer reserves a 25% quantity variation at contract award and during currency, at contracted rates. Deliveries commence from the last date of the original delivery order, with potential extensions tied to the option clause. This tender emphasizes OEM authorization, MSME and data sheet compliance, and strict document submission as critical evaluation criteria. The opportunity targets suppliers capable of ISO 9001-2015 and data-proven warranty/after-sales terms. The procurement aims to standardize maintenance peripherals for Army operations, with emphasis on product delivery assurance and non-disclosure commitments. The tender includes mandatory commercial and technical attestation to ensure supply continuity and compliance with government procurement norms.
Keywords: tender in India, Indian Army procurement, Department Of Military Affairs tender, maintenance peripherals, EPSON L1460, EPSON EP9350, UPS 12V-2AH, pickup roller set, computer keyboard procurement
Maintenance box EPSON L1460
Maintenance box EPSON EP9350
UPS Battery 12V-2AH
Pickup roller set
Keyboard
Option Clause allows ±25% quantity change at award and during contract
Delivery period starts from last date of original delivery order
ISO 9001-2015 and OEM authorization required
Data sheet, confidentiality, warranty, and service support certificates mandatory
Rejection for incomplete/incorrect documents
Payment terms to be defined in contract; delivery extensions may affect timelines.
Delivery period begins after the original delivery order; option clause allows extension via formula, minimum 30 days.
Not explicitly stated; rejection criteria emphasize compliance failures.
Must hold OEM Authorization Certificate for supplied items
Must demonstrate ISO 9001-2015 compliance or equivalent
CA-certified financial standing or bank solvency evidence
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
SONITPUR, ASSAM
Dg Of Defence Estate
LEH, JAMMU & KASHMIR
Indian Army
DODA, JAMMU & KASHMIR
Indian Army
JAMMU, JAMMU & KASHMIR
Indian Army
BARAMULLA, JAMMU & KASHMIR
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Maintenance box EPSON L1460 | Maintenance box EPSON L1460 | 1 | nos | 31.kp | 15 |
| 2 | Maintenance box EPSON EP9350 | Maintenance box EPSON EP9350 | 2 | nos | 31.kp | 15 |
| 3 | UPS Bty 12V-2AH | UPS Bty 12V-2AH | 10 | nos | 31.kp | 15 |
| 4 | Pickup roller set | Pickup roller set | 2 | nos | 31.kp | 15 |
| 5 | Keyboard | Keyboard | 5 | nos | 31.kp | 15 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
OEM Authorization Certificate
Data Sheet of the Product
ISO 9001-2015 certificate (if available)
Warranty Certificate
Bank Solvency Certificate or CA-certified financial statements
MII Certificate (if applicable)
Non-Disclosure and Confidentiality Certificates
Non-Blacklisting Certificate
Copy of ECS Mandate From
Pan and GST copies, canceled cheque
Bidders must submit GST, PAN, OEM authorization, data sheet, warranty certificate, non-disclosure, non-blacklist certificates, ECS mandate, and bank solvency or CA-certified financials. Ensure ISO 9001-2015 compliance and include service support details to meet ATC criteria.
The purchaser may increase or decrease quantity up to 25% at contract award and during the currency at contracted rates. Additional delivery time is calculated as (increased quantity ÷ original quantity) × original period, with a minimum of 30 days, or up to the original delivery period.
The bid covers EPSON L1460 and EP9350 maintenance boxes, plus a 12V-2AH UPS battery, pickup roller set, and keyboard. Specific model numbers and data sheets are mandatory, along with OEM certification and confidentiality documentation.
Suppliers must provide ISO 9001-2015 certification, OEM authorization, data sheet, warranty certificate, confidentiality, non-disclosure, and non-blacklist certificates. MII certificate and bank solvency may be required per ATC clauses.
Delivery begins from the last date of the original delivery order, with extension times calculated per the option clause. If quantity increases, the additional time follows the (A ÷ B) × B formula, but never less than 30 days.
Bidders must present bank solvency or CA-certified financial statements, along with GST and PAN. This ensures financial capability to sustain OEM-grade supply and post-sale support as per ATC requirements.
The BOQ lists five items: Maintenance box EPSON L1460, Maintenance box EPSON EP9350, UPS Battery 12V-2AH, Pickup roller set, and Keyboard. Quantities are not specified in the available data; compliance with data sheet and OEM terms is essential.
Submit ISO 9001-2015 certificate, combine with OEM authorization, data sheet, and warranty terms. Ensure product delivery assurance and confidentiality certificates are included, as missing certifications can lead to rejection per ATC.
Indian Army
📍 MEERUT, UTTAR PRADESH
Controller General Of Defence Accounts
📍 LEH, JAMMU & KASHMIR
Indian Army
📍 LEH, JAMMU & KASHMIR
Indian Army
📍 UDHAMPUR, JAMMU & KASHMIR
Indian Army
📍 AMRITSAR, PUNJAB
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS