VZ8100101620,VZ8100101639,VZ8100101647,VZ8100101655,VZ8100101663,VZ8100101671
Bharat Heavy Electricals Limited (bhel)
VISAKHAPATNAM, ANDHRA PRADESH
Bid Publish Date
18-Jun-2026, 6:05 pm
Bid End Date
29-Jun-2026, 2:00 pm
Location
Progress
Quantity
6
Category
VZ9700002004 SO 8136 1st Boiler
Bid Type
Two Packet Bid
Bharat Heavy Electricals Limited (BHEL) invites bids for boiler-related equipment/services tied to multiple identified boiler models in the VISAKHAPATNAM, ANDHRA PRADESH region. The procurement covers several boiler variants associated with the 1st, 2nd, and 3rd boiler sets, as per the BOQ and tender terms. The package references six items across boiler configurations, with an emphasis on supplier readiness to meet delivery timelines under option clauses. The contract includes a flexible quantity clause (up to 25% increase/decrease) and extended delivery considerations, making timely, compliant supply critical. The opportunity requires compliance with the purchaser’s delivery methodology and rate-based execution, aligned to contract terms and the option-usage framework.
Boiler-related equipment/services for 6 items across 1st, 2nd, and 3rd boiler configurations
Delivery timeline as per last date of original delivery order with option clause
25% quantity variation allowed during award and currency
Delivery extension formula: (additional quantity / original quantity) × original delivery period (days); minimum 30 days
Review ATC for any additional technical or installation requirements
No explicit technical standards listed in the provided data; bidders should rely on ATC and internal BHEL procurement standards
Option clause allows 25% quantity variation at contract and during currency
Delivery timelines commence from the last date of original delivery order
Additional time calculation includes minimum 30 days extension
Payment terms are not detailed in the summary; bidders must refer to ATC for milestone-based payments and currency terms.
Delivery period starts after the original delivery order date; extension times follow the option clause with the 30-day minimum.
Penalty details are not specified here; consult ATC for LD clauses and performance penalties.
Experience in boiler equipment procurement or related heavy industrial components
Ability to scale delivery under 25% quantity variation
Compliance with GST, PAN, and financial viability documentation as per ATC
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
VZ9700002004 SO 8136 1st Boiler , VZ9700002012 SO 8136 1st Boiler , VZ9700002004 SO 8194 2nd Boiler , VZ9700002012 SO 8194 2nd Boiler , VZ9700002004 SO 8195 3rd Boiler , VZ9700002012 SO 8195 3rd Boiler
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Bharat Heavy Electricals Limited (bhel)
VISAKHAPATNAM, ANDHRA PRADESH
Bharat Heavy Electricals Limited (bhel)
VISAKHAPATNAM, ANDHRA PRADESH
Bharat Heavy Electricals Limited (bhel)
VISAKHAPATNAM, ANDHRA PRADESH
Bharat Heavy Electricals Limited (bhel)
VISAKHAPATNAM, ANDHRA PRADESH
Bharat Heavy Electricals Limited (bhel)
Tender Results
Loading results...
VZ9700002004 SO 8136 1st Boiler
WIND BOX ASSEMBLY CORNERS 1 TO 4 includes windbox damper oil gun oil gun vice windbox supports as per TDC 4 45 220 WB 8136 94 95 001 and its enclosures
VZ9700002012 SO 8136 1st Boiler
ACCESSORIES AS PER TDC As per TDC 4 45 220 WB 8136 94 95 001 and its enclosures
VZ9700002004 SO 8194 2nd Boiler
WIND BOX ASSEMBLY CORNERS 1 TO 4 includes windbox damper oil gun oil gun vice windbox supports as per TDC 4 45 220 WB 8136 94 95 001 and its enclosures
VZ9700002012 SO 8194 2nd Boiler
ACCESSORIES AS PER TDC As per TDC 4 45 220 WB 8136 94 95 001 and its enclosures
VZ9700002004 SO 8195 3rd Boiler
WIND BOX ASSEMBLY CORNERS 1 TO 4 includes windbox damper oil gun oil gun vice windbox supports as per TDC 4 45 220 WB 8136 94 95 001 and its enclosures
VZ9700002012 SO 8195 3rd Boiler
ACCESSORIES AS PER TDC As per TDC 4 45 220 WB 8136 94 95 001 and its enclosures
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | VZ9700002004 SO 8136 1st Boiler | WIND BOX ASSEMBLY CORNERS 1 TO 4 includes windbox damper oil gun oil gun vice windbox supports as per TDC 4 45 220 WB 8136 94 95 001 and its enclosures | 1 | no | bhel.hpvp.consignee3 | 133 | |
| 2 | VZ9700002012 SO 8136 1st Boiler | ACCESSORIES AS PER TDC As per TDC 4 45 220 WB 8136 94 95 001 and its enclosures | 1 | set | bhel.hpvp.consignee3 | 133 | |
| 3 | VZ9700002004 SO 8194 2nd Boiler | WIND BOX ASSEMBLY CORNERS 1 TO 4 includes windbox damper oil gun oil gun vice windbox supports as per TDC 4 45 220 WB 8136 94 95 001 and its enclosures | 1 | no | bhel.hpvp.consignee3 | 270 | |
| 4 | VZ9700002012 SO 8194 2nd Boiler | ACCESSORIES AS PER TDC As per TDC 4 45 220 WB 8136 94 95 001 and its enclosures | 1 | set | bhel.hpvp.consignee3 | 270 | |
| 5 | VZ9700002004 SO 8195 3rd Boiler | WIND BOX ASSEMBLY CORNERS 1 TO 4 includes windbox damper oil gun oil gun vice windbox supports as per TDC 4 45 220 WB 8136 94 95 001 and its enclosures | 1 | no | bhel.hpvp.consignee3 | 270 | |
| 6 | VZ9700002012 SO 8195 3rd Boiler | ACCESSORIES AS PER TDC As per TDC 4 45 220 WB 8136 94 95 001 and its enclosures | 1 | set | bhel.hpvp.consignee3 | 270 |
Discover companies most likely to bid on this tender
GST registration proof
PAN card
Experience certificates for boiler-related procurement
Financial statements (last 2-3 years)
EMD submission proof
Technical bid documents
OEM authorizations (if applicable)
Any ATC-specified compliance certificates
Key insights about ANDHRA PRADESH tender market
Bidders should review the ATC for the specific scope, prepare GST and PAN, gather experience certificates for boiler procurements, and ensure OEM authorizations if needed. Submit EMD as specified and align delivery proposals to the 25% quantity variation clause while respecting last-day delivery terms.
Submit GST registration, PAN card, 2-3 years of financial statements, experience certificates for boiler projects, EMD proof, technical bid documents, and OEM authorizations. ATC may require additional compliance certificates; verify all documents before submission.
The purchaser may increase or decrease the bid quantity by up to 25% at contract award and during the contract period at contracted rates. Delivery time adjusts based on the extra quantity, with a minimum extension of 30 days unless original period is longer.
Refer to the ATC uploaded by the buyer and any OEM specifications. The tender data itself shows no explicit standards; ensure compliance with IS or OEM-specified requirements as indicated in ATC.
Delivery starts from the last date of the original delivery order. If an option clause is exercised, extended time is calculated per the formula and must meet the minimum 30-day extension.
Payment terms are not specified in the public data; bidders should consult the ATC for milestone-based payment schedules and any advance/payment terms tied to delivery milestones.
Demonstrate relevant boiler procurement experience, maintain financial stability with statements, provide GST/PAN, and supply OEM authorizations if required. Compliance with ATC and ability to scale delivery under quantity variation are critical.
Undefined BOQ quantities require bidders to prepare flexible pricing and scalable capacity, align with 25% variation rights, and coordinate delivery schedules to accommodate possible quantity changes without price renegotiation.
Bharat Heavy Electricals Limited (bhel)
📍 VISAKHAPATNAM, ANDHRA PRADESH
Bharat Heavy Electricals Limited (bhel)
📍 VISAKHAPATNAM, ANDHRA PRADESH
Bharat Heavy Electricals Limited (bhel)
📍 VISAKHAPATNAM, ANDHRA PRADESH
Bharat Heavy Electricals Limited (bhel)
📍 VISAKHAPATNAM, ANDHRA PRADESH
Bharat Heavy Electricals Limited (bhel)
📍 VISAKHAPATNAM, ANDHRA PRADESH
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS