item no.10,item no.20,item no.30,item no.40,item no.50,item no.60,item no.70
Iocl Bongaigaon Refinery
BONGAIGAON, ASSAM
Bid Publish Date
11-Jul-2026, 12:04 pm
Bid End Date
29-Jul-2026, 3:00 pm
Location
Progress
Quantity
7
Category
Item no. 10
Bid Type
Two Packet Bid
The Indian Oil Corporation Limited (IOCL) Bongaigaon Refinery in Assam invites bids for a single Karl Fischer Coulometric Auto Titrator, including required accessories and a 6-year PWC/AMC. The procurement location is IOCL Bongaigaon Refinery, Chirang, Assam (PIN 783385). The scope emphasizes supply of goods with OEM warranty certificates and post-installation service capability across India. A Bid Security Declaration replaces traditional EMD for all bidders, mandating conformity to the Sanctioned Terms. The BOQ lists seven items, though item descriptions remain non-specific in the data provided. The contract permits quantity adjustments up to 25% during and after award, with delivery timelines tied to the original period and extended periods. Key differentiator: integrated after-sales support and national service footprint. Unique aspects include mandatory BSD submission and dealer/global OEM support.
Product/service: Karl Fischer Coulometric Auto Titrator with necessary accessories
Quantity: 1 unit (as per scope); 6-year AMC
Location: IOCL Bongaigaon Refinery, Chirang, Assam 783385
EMD/BD: Bid Security Declaration in lieu of EMD
Warranty: OEM warranty certificates at delivery; breakdown rectification during guarantee
Service: Installation, commissioning, training and maintenance service network in India
Delivery: Within original delivery period; option to extend up to original delivery period with minimum 30 days
BoQ: 7 items listed, but item details not provided in data
Bid Security Declaration mandatory in lieu of EMD
Quantity variation up to 25% during/after award
OEM warranty with India service centers required
Not explicitly stated in excerpt; typical IOCL terms apply post-delivery/acceptance per contract; BSD substitutes EMD
Delivery period calculated from original order; extended time if option exercised; minimum 30 days; 25% quantity variation allowed
Not specified in excerpt; implied LD provisions may apply as per IOCL standard ATC terms
Must submit Bid Security Declaration (BSD) in lieu of EMD
Proven experience in supplying Karl Fischer equipment or similar analytical instrumentation
OEM authorization or authorized distributor status for India
Demonstrated installation, commissioning and after-sales service capability across India
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Item no. 10 , Item no. 20 , Item no. 30 , Item no. 40 , Item no. 50 , Item no. 60 , Item no. 70
Advisory Bank
ICICI
ePBG Percentage
5%
ePBG Duration (Months)
95
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
90
Delivery Locations
1
Delivery Cities
Chirang
Delivery Pincodes
783385
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Jay Kumar Prajapati | 783385,IOCL Bongaigaon Refinery | Chirang | Assam | 783385 | 1 | 90 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
BOQ
BOQ
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Iocl Bongaigaon Refinery
BONGAIGAON, ASSAM
Iocl Bongaigaon Refinery
BONGAIGAON, ASSAM
Indian Oil Corporation Limited
BEGUSARAI, BIHAR
Iocl Bongaigaon Refinery
BONGAIGAON, ASSAM
Iocl Bongaigaon Refinery
BONGAIGAON, ASSAM
Tender Results
Loading results...
Item no. 10
Karl Fischer Coulometric Auto Titrator
Item no. 20
CAMC FOR FIRST YEAR
Item no. 30
CAMC FOR SECOND YEAR
Item no. 40
CAMC FOR THIRD YEAR
Item no. 50
CAMC FOR FOURTH YEAR
Item no. 60
CAMC FOR FIFTH YEAR
Item no. 70
CAMC FOR SIXTH YEAR
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Item no. 10 | Karl Fischer Coulometric Auto Titrator | 1 | ea | sheikh_gem | 90 | |
| 2 | Item no. 20 | CAMC FOR FIRST YEAR | 1 | su | sheikh_gem | 365 | |
| 3 | Item no. 30 | CAMC FOR SECOND YEAR | 1 | su | sheikh_gem | 365 | |
| 4 | Item no. 40 | CAMC FOR THIRD YEAR | 1 | su | sheikh_gem | 365 | |
| 5 | Item no. 50 | CAMC FOR FOURTH YEAR | 1 | su | sheikh_gem | 365 | |
| 6 | Item no. 60 | CAMC FOR FIFTH YEAR | 1 | su | sheikh_gem | 365 | |
| 7 | Item no. 70 | CAMC FOR SIXTH YEAR | 1 | su | sheikh_gem | 365 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar Karl Fischer Coulometric Auto Titrator bids
Financial statements (as required by IOCL)
Bid Security Declaration (BSD) in lieu of EMD
OEM authorization letter (if bidding through an authorized dealer)
Technical bid documents and installation/commissioning plan
Service center details near IOCL Bongaigaon Refinery
Key insights about ASSAM tender market
Bidders must submit a BSD in lieu of EMD using the company letterhead, include OEM authorization if applicable, and provide OEM warranty certificates. Include installation plan, service centers, and a 6-year AMC proposal. Ensure conformity with IOCL ATC terms and attach GST/PAN and experience certificates.
Required documents include GST registration, PAN, experience certificates for similar equipment, financial statements, BSD form Annexure-6, OEM authorization, installation/ commissioning plan and service center details near the consignee. Submit technical bid and compliance certificates with the bid response.
The tender specifies a Karl Fischer Coulometric Auto Titrator with required accessories and 6-year AMC. Exact models, calibration standards, and ISI/ISO certifications are not listed publicly; bidders should confirm OEM standards and provide warranty certificates plus installation documentation.
Delivery timelines are tied to the original delivery period; if the option to increase quantity is exercised, extended time is calculated as (Increased quantity/Original quantity) × Original delivery period, with a minimum of 30 days.
Bidders must submit a Bid Security Declaration on company letterhead as per Annexure-6; failure to submit BSD leads to bid rejection. BSD substitutes the EMD requirement for eligibility and procurement participation.
Successful bidders must demonstrate a well-established Installation, Commissioning, Training and Maintenance network in India, with service centers near consignee locations. OEM warranty certificates are required at delivery, and service staff should be available for breakdowns during the warranty period.
Scope includes supply of one Karl Fischer Coulometric Auto Titrator with required accessories and a 6-year AMC; installation and commissioning are included where specified. The price should cover all cost components; installation/training details to be clarified in the bid.
Yes, quantity may be increased or decreased up to 25 percent of bid/contract quantity at the time of placement and during the currency of the contract at contracted rates. Delivery time adjusts accordingly with a minimum 30 days.
Indian Oil Corporation Limited
📍 BEGUSARAI, BIHAR
Iocl Bongaigaon Refinery
📍 BONGAIGAON, ASSAM
📍 BONGAIGAON, ASSAM
Indian Oil Corporation Limited
📍 KAMRUP, ASSAM
Indian Oil Corporation Limited
📍 BEGUSARAI, BIHAR
Sign up now to access all documents
Main Document
OTHER
BOQ
BOQ
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS