Water Purification System with UV (Ultra-Violet Process) or UV (Ultra-Violet Process)+UF (Ultra-Fil
Border Road Organisation
CHANDIGARH, CHANDIGARH
Bid Publish Date
10-Jun-2026, 6:12 pm
Bid End Date
20-Jun-2026, 7:00 pm
Location
Progress
Quantity
10
Bid Type
Two Packet Bid
The National Council of Educational Research and Training (NCERT), Department of School Education and Literacy, seeks a turnkey supply of a Water Purification System with UV processing or UV plus UF configuration for implementation in Bhopal, Madhya Pradesh. The scope includes Supply, Installation, Testing and Commissioning (SITC) of the system, with the option to increase or decrease ordered quantity up to 25% at contracted rates. Pre-quotation GST considerations are noted, with GST payable by bidders as applicable. Mandatory certifications include BIS licence, type test certificates, OEM authorizations, and Green Company GC‑Mark along with ISO 14001.
Product/service: Water purification system with UV processing or UV+UF configuration (V2)
Scope: Supply, Installation, Testing and Commissioning (SITC)
Standards/certifications: BIS licence, type test certificates, OEM authorizations, GC‑Mark, ISO 14001
Delivery: 25% quantity variation rights; delivery extension rules; base delivery period undefined
Environmental: GC‑Mark and ISO 14001 compliance required for bidder
Documentation: Upload mandatory certificates with bid per ATC
Option to increase/decrease quantity up to 25% at contract time and during currency
GST applicable as per bidder's assessment; reimbursement as per actuals or applicable rates
Mandatory SITC scope including installation and commissioning; BIS/type test & OEM certificates required
GST payable by bidder; reimbursement as per actuals or lower applicable rate; no fixed schedule in available text
Delivery period starts from last date of original delivery order; option quantities may extend delivery time; minimum 30 days when extended
Not explicitly described in available terms; ATC emphasizes adherence to delivery extensions and SITC timelines
Proven experience in supplying SITC water purification systems with UV/UV+UF
Valid BIS licence and type test certificates
OEM authorisation for green/ISO 14001 compliant operations
Capability to manage 25% quantity variation and delivery extensions
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Water Purification System with UV (Ultra-Violet Process) or UV (Ultra-Violet Process)+UF (Ultra-Filtration Process) (V2) (Q2)
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Border Road Organisation
CHANDIGARH, CHANDIGARH
Border Road Organisation
CHANDIGARH, CHANDIGARH
Directorate Of Purchase And Stores
N/a
ERNAKULAM, KERALA
Central Coalfields Limited
RAMGARH, JHARKHAND
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates showing similar SITC of water purification systems
Financial statements for last 2 financial years
EMD document (as applicable per ATC)
BIS licence and type test certificates
OEM authorization / manufacturer qualification documents
Green Company GC‑Mark and ISO 14001 certifications
Technical compliance certificates as prescribed in Product Specifications
Any other certificates requested in ATC / Corrigendum
Key insights about MADHYA PRADESH tender market
Bidders must submit GST registration, PAN, and experience certificates; upload BIS licence, type test certificates, OEM authorizations, and GC‑Mark/ISO 14001 attestations. Include SITC scope, and comply with 25% quantity variation rules. Follow ATC for any additional documents and ensure environmental certifications are current.
Required documents include GST certificate, PAN, 2+ years of financials, BIS licence, type test certificates, OEM authorization, Green GC‑Mark, ISO 14001, and experience certificates for similar SITC projects. Ensure all documents are uploaded with the bid per ATC/Corrigendum.
Bidders must provide BIS licensing and type test certificates; Green GC‑Mark and ISO 14001 compliance are mandatory. The system must be UV or UV+UF configured, with SITC scope, and adherence to any product specifications in the ATC.
Exact submission deadlines are not stated in the available data; bidders should monitor the official ATC and Corrigendum for submission dates and any addenda that adjust the timeline.
The purchaser may increase or decrease quantity up to 25% at contract award and during the currency of the contract at contracted rates. If extended, delivery time is recalculated as (increased quantity ÷ original quantity) × original delivery period, subject to a minimum 30 days.
The bid scope includes Supply, Installation, Testing and Commissioning (SITC) of the UV/UV+UF water purification system. The price must cover all components, including installation, wiring, and commissioning services as described in the ATC.
Mandatory certifications include Green Company GC‑Mark and ISO 14001, along with BIS licence and type test certificates. OEM authorizations are required, and certification documentation must be uploaded with the bid per ATC guidelines.
Payment terms focus on GST compliance by bidders with reimbursement options based on actual GST or applicable lower rate. No fixed milestone schedule is specified in the available text; bidders should reference the ATC for definitive terms.
Madhya Pradesh Power Transmission Company Limited (mptransco) Jabalpur
📍 SHIVPURI, MADHYA PRADESH
Uttar Pradesh State Institute Of Forensic Science
📍 LUCKNOW, UTTAR PRADESH
Southern Railway
Indian Army
📍 HYDERABAD, TELANGANA
N/a
📍 JAMMU, JAMMU & KASHMIR
Sign up now to access all documents
Main Document
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS