Indian Army Department Of Military Affairs Gurudaspur Punjab Regulator SR 40 & Related Components Tender 2026
Indian Army
GURDASPUR, PUNJAB
Bid Publish Date
13-Feb-2026, 9:48 am
Bid End Date
23-Feb-2026, 10:00 am
Location
Progress
Quantity
287
Organization: Indian Army, Department Of Military Affairs. The procurement scope includes a broad set of mechanical and electromechanical assemblies (DRIVEN DISC, LOCK ASSY STEERING, SPRING ASSY REAR LH, DISC FRONT BRAKE, ARMATURE MOTOR, REGULATOR ENGINE GENERATOR, PROTECTIVE BAG, DRIVE SHAFT, ARMATURE, REPAIR KIT TRAILER CONTROL VALVE, FIELD COIL ASSEMBLY HBO, ASSY RELEASE BEARING, PUMP FUEL TRANSFER, NOZZLE, TRANSMISSION ASSEMBLY, FILTER ASSEMBLY, TIN RECTANGULAR 5 LTRS). No quantitative BOQ values or estimated contract value are disclosed. The tender notes a 25% quantity option and extended delivery sequencing, with delivery time linked to original orders. Pre/post inspection options and advance sample approval are required. Location is not specified, and the tender does not publish start/end dates or EMD amounts. The absence of technical specs suggests reliance on subsequent contract framework and sample approvals for bulk supply. Unique clauses include optional quantity variations and sample approval timelines, shaping initial bid strategy. This opportunity targets suppliers with robust metal/mechanical assembly capabilities and capability to conform to buyer-specified approval processes.
Assemblies list from BOQ items (DRIVEN DISC, LOCK ASSY STEERING, SPRING ASSY REAR LH, DISC FRONT BRAKE, ARMATURE MOTOR, REGULATOR, ENGINE GENERATOR, DRIVE SHAFT, ARMATURE, PUMP FUEL TRANSFER, NOZZLE, TRANSMISSION ASSY, FILTER ASSY, ARMATURE ASSY HBO, ASSY RELEASE BEARING, PROTECTIVE BAG, TIN RECTANGULAR 5 LTRS, REPAIR KIT TRAILER CONTROL VALVE, FIELD COIL ASSY)
No exact measurements or model numbers released
Delivery terms reference option clause and sample approval process
Standards are not specified; emphasis on buyer-specified compliance and sample conformity
Quantity variation up to 25% allowed by purchaser
Advance sample submission within 5 days of award; modification list in 10 days
Pre-dispatch or post-receipt inspection by nominated agency
Delivery timelines linked to original delivery order; potential extensions with formula
Up to 25% quantity increase/decrease at contract award and during currency; delivery time recalculation with a minimum 30 days.
Submit one advance sample within 5 days; buyer to approve or specify modifications within 10 days; bulk supply contingent on approval.
Pre-dispatch inspection at seller premises or post-receipt inspection at consignee site via nominated agency; BOQ/ATC rules apply.
Experience in supplying mechanical/electromechanical assemblies similar to listed items
Ability to meet sample approval timelines and bulk supply upon approval
Compliance with inspection terms and option clause requirements
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
GURDASPUR, PUNJAB
Indian Army
TINSUKIA, ASSAM
Indian Army
SURENDRA NAGAR, GUJARAT
Indian Army
BARAMULLA, JAMMU & KASHMIR
Indian Army
PANCHKULA, HARYANA
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | DRIVEN DISC | DRIVEN DISC | 5 | nos | sudhakar@22dou | 30 |
| 2 | LOCK ASSY STEERING | LOCK ASSY STEERING | 6 | nos | sudhakar@22dou | 30 |
| 3 | SPRING ASSY REAR LH | SPRING ASSY REAR LH | 3 | nos | sudhakar@22dou | 30 |
| 4 | DISC FRONT BRAKE | DISC FRONT BRAKE | 8 | nos | sudhakar@22dou | 30 |
| 5 | ARMATURE MOTOR | ARMATURE MOTOR | 6 | nos | sudhakar@22dou | 30 |
| 6 | REGULATOR ENGINE GENERATOR | REGULATOR ENGINE GENERATOR | 6 | nos | sudhakar@22dou | 30 |
| 7 | PROTECTIVE BAG | PROTECTIVE BAG | 2 | nos | sudhakar@22dou | 30 |
| 8 | DRIVE SHAFT | DRIVE SHAFT | 8 | nos | sudhakar@22dou | 30 |
| 9 | ARMATURE | ARMATURE | 3 | nos | sudhakar@22dou | 30 |
| 10 | REPAIR KIT TRAILER CONTROL VALVE | REPAIR KIT TRAILER CONTROL VALVE | 2 | nos | sudhakar@22dou | 30 |
| 11 | FIELD COIL ASSY | FIELD COIL ASSY | 8 | nos | sudhakar@22dou | 30 |
| 12 | ARMATURE ASSY HBO | ARMATURE ASSY HBO | 2 | nos | sudhakar@22dou | 30 |
| 13 | ASSY RELEASE BEARING | ASSY RELEASE BEARING | 5 | nos | sudhakar@22dou | 30 |
| 14 | PUMP FUEL TRANSFER | PUMP FUEL TRANSFER | 6 | nos | sudhakar@22dou | 30 |
| 15 | NOZZLE | NOZZLE | 7 | nos | sudhakar@22dou | 30 |
| 16 | TRANSMISSION ASSY | TRANSMISSION ASSY | 1 | nos | sudhakar@22dou | 30 |
| 17 | FILTER ASSY | FILTER ASSY | 61 | nos | sudhakar@22dou | 30 |
| 18 | TIN RECTANFULAR 5 LTRS | TIN RECTANFULAR 5 LTRS | 148 | nos | sudhakar@22dou | 30 |
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates for similar mechanical/assembly supply
Financial statements or turnover documents
EMD/Security deposit documents (amount not disclosed in tender data)
Technical bid documents and any OEM authorizations if applicable
Quality/compliance certificates related to assemblies listed (if available)
Key insights about UTTAR PRADESH tender market
Bidders must submit GST, PAN, experience proofs, financial statements, EMD documents, and technical bids. Comply with advance sample requirements (5 days for sample, 10 days for modifications) and ensure readiness for pre/post inspection. The tender permits a 25% quantity variation at award and during currency.
Required documents include GST certificate, PAN card, experience certificates for similar assemblies, financial statements, EMD deposit proof, technical bid, and OEM authorizations if applicable, plus any quality certificates tied to the listed assemblies.
Delivery commences from the last date of the original delivery order. If the option clause is exercised, extended time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.
Inspection may be pre-dispatch at seller premises or post-receipt at the consignee site, depending on ATC selections. The nominated inspection agency conducts the assessment to ensure compliance before acceptance.
Submit one advance sample within 5 days of award; buyer reviews and provides modifications within 10 days. Bulk production proceeds only after approval; delays reset delivery timelines without LD for buyer-caused delays.
The excerpt specifies delivery extensions via the option clause and formula but does not detail explicit LD percentages. Suppliers should plan for potential delivery schedule recalibration, with minimum 30-day extension triggers.
The scope includes DRIVEN DISC, LOCK ASSEMBLY STEERING, SPRING REAR LH, DISC FRONT BRAKE, ARMATURE MOTOR, REGULATOR, ENGINE GENERATOR, DRIVE SHAFT, ARMATURE, PUMP FUEL TRANSFER, NOZZLE, TRANSMISSION ASY, FILTER ASY, ARMATURE ASY HBO, RELEASE BEARING, PROTECTIVE BAG, FIELD COIL ASSY, and related items.
No specific standards are published in the data. Bidders must comply with buyer-specified contract framework and sample conformity requirements; ensure OEM authorizations and quality assurances as part of the technical bid.
Indian Army
📍 FARIDKOT, PUNJAB
Indian Army
📍 BIKANER, RAJASTHAN
Indian Army
📍 BIKANER, RAJASTHAN
Indian Army
📍 SOLAN, HIMACHAL PRADESH
Indian Army
📍 DARJEELING, WEST BENGAL
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS