UPS,Input SPD,Output SPD,Modular switch,4-pole MCB,2-pole MCB,MCB,Power cable 10 sq mm,Power cable
Airports Authority Of India
Bid Publish Date
31-Dec-2025, 1:22 pm
Bid End Date
21-Jan-2026, 2:00 pm
Location
Progress
Quantity
4262
Category
INDUSTRIAL BATTERY
Bid Type
Two Packet Bid
A tender has been published for Chittaranjan Locomotive Works TROLLEY, COPPER CABLE, PVC BOX, INDUSTRIAL BATTERY, ONLINE UPS, POWER DISTRIBUTION BOARD, CONDUIT PIPE in BARDHAMAN, WEST BENGAL. Quantity: 4262 by. Submission Deadline: 21-01-2026 14: 00: 00. Check eligibility and apply.
Airports Authority Of India
Hqids
SOUTH ANDAMAN, ANDAMAN & NICOBAR
Directorate General Of Lighthouses And Lightships
RATNAGIRI, MAHARASHTRA
Indian Navy
VISAKHAPATNAM, ANDHRA PRADESH
Indian Army
BIKANER, RAJASTHAN
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | TROLLEY | INVERTER BATTERY TROLLEY FOR DOUBLE TUBULAR SUITABLE FOR 12V 150AH BATTERY TROLLEY | 40 | pieces | dycee.ers | 30 |
| 2 | COPPER CABLE | 2 Core 1 point 5 Sqmm Flexiable Pvc Insulated Copper Cable 1100v Grade Make | 3,000 | mtr | dycee.ers | 30 |
| 3 | PVC BOX | SUPPLY COMMISIONING AND INSTALLATION OF PVC BOX 3X3 | 150 | set | dycee.ers | 30 |
| 4 | INDUSTRIAL BATTERY | SUPPLY INSTALLATION AND COMMISSIONING OF INDUSTRIAL BATTERY OF 150AH 12V SUITABLE FOR 850VA INVERTER UPS | 24 | nos | dycee.ers | 30 |
| 5 | ONLINE UPS | SUPPLY INSTALLATION AND COMMISSIONING OF 1 KVA ONLINE UPS INVETER SINEWAVE | 24 | nos | dycee.ers | 30 |
| 6 | POWER DISTRIBUTION BOARD | SUPPLY INSTALLATION AND COMMISSIONING OF POWER DISTRIBUTION BOARD OF SIZE 200X150X50 HAVING 1X16 AMP MCB | 24 | nos | dycee.ers | 30 |
| 7 | CONDUIT PIPE | SUPPLY INSTALLATION AND COMMISSIONING OF PVC CONDUIT PIPE WHITE COLOUR OF SIZE 25MMX 2 MM OF PIPE | 1,000 | mtrs | dycee.ers | 30 |
Discover companies most likely to bid on this tender
Certificate (Requested in ATC)
OEM Authorization Certificate
Additional Doc 4 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS