TenderDekho Logo
GEM

Tender Notice for 40 KVA Modular UPS,Battery Bank,Battery Rack,Battery Monitoring System,Isolation Transformer,Static in LUCKNOW, UTTAR PRADESH

Bid Publish Date

14-Jul-2026, 5:59 pm

Bid End Date

04-Aug-2026, 4:00 pm

EMD

₹5,64,550

Location

LUCKNOW , UTTAR PRADESH

Progress

Issue14-Jul-2026, 5:59 pm
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

348

Category

40 KVA Modular UPS

Categories 62

A tender has been published for Airports Authority Of India, rhq Nr - Rangpuri 40 KVA Modular UPS, Battery Bank, Battery Rack, Battery Monitoring System, Isolation Transformer, Static transfer Switch, SPD at Input, SPD at Output, 4 Core Power Cable, MCCB 100A, MCCB 63A with D boxes, CAT 6 Network copper cable, PVC Conduit, Cable Tray, Installation Testing and Commissioning, CAMC 1st Year, CAMC 2nd Year, CAMC 3rd Year, CAMC 4th Year, CAMC 5th Year, CAMC 6th Year, CAMC 7th Year, CAMC 8th Year in LUCKNOW, UTTAR PRADESH. Quantity: 348 by. Submission Deadline: 04-08-2026 16: 00: 00. Check eligibility and apply.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Item Category

40 KVA Modular UPS , Battery Bank , Battery Rack , Battery Monitoring System , Isolation Transformer , Static transfer Switch , SPD at Input , SPD at Output , 4 Core Power Cable , MCCB 100A , MCCB 63A with D boxes , CAT 6 Network copper cable , PVC Conduit , Cable Tray , Installation Testing and Commissioning , CAMC 1st Year , CAMC 2nd Year , CAMC 3rd Year , CAMC 4th Year , CAMC 5th Year , CAMC 6th Year , CAMC 7th Year , CAMC 8th Year

Advisory Bank

ICICI

ePBG Percentage

5%

ePBG Duration (Months)

26

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

180

Delivery Locations

1

Delivery Cities

Lucknow

Delivery Pincodes

226009

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Sanjay Shrivastava226009,O/o Airport Director,Airports Authority of India, CCSI Airport, Lucknow- 226009LucknowUttar Pradesh2260094180-

Authority Records

MINISTRY OF CIVIL AVIATIONAIRPORTS AUTHORITY OF INDIA

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9605150.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

30 KVA UPS,BATTERY BANK,45 KVA ISOLATION TRANSFORMER,Accessories,INSTALLATION TESTING COMMISSIONING

Prasar Bharati Broadcasting Corporation Of India

Posted: 19 September 2025
Closed: 11 October 2025
GEM

5KVA UPS,Battery Bank,Battery Monitoring System,Type 2 SPD,Type 3 SPD,Metallic Distribution Box,Ele

N/a

KOLHAPUR, MAHARASHTRA

Posted: 27 November 2025
Closed: 18 December 2025
GEM

Fixed Camera,NVR,Switch Components,Switch Components 2,HARD DISKS,3 KVA ONLINE UPS with 1 Hour Batt

Hindustan Aeronautics Limited (hal)

NASHIK, MAHARASHTRA

Posted: 12 December 2024
Closed: 3 January 2025
GEM

10 KVA PRS UPS,Battery Banks,Battery Management System BMS,5 KVA PRS UPS,Battery Banks,Battery Mana

Airports Authority Of India

PONDICHERRY, PUDUCHERRY

Posted: 24 June 2025
Closed: 21 July 2025
GEM

SITC of 10 KVA PRS UPS,Battery Banks,SITC of 5 KVA PRS UPS,Battery Banks,Battery Management System

Airports Authority Of India

Posted: 10 December 2024
Closed: 23 December 2024
GEM

Bill of Quantities (BOQ) 23 Items Sign in for GEM prices

#1

40 KVA Modular UPS

Three phase Input and Three phase Output

4 nos Delivery: 180 days
#2

Battery Bank

Battery Bank for UPS with 30 mins Backup

4 nos Delivery: 180 days
#3

Battery Rack

Battery Rack of Standard Quality with trolley and Top Cover

4 nos Delivery: 180 days
#4

Battery Monitoring System

Supply of Independent Battery Monitoring System as per Technical Specifications

2 nos Delivery: 180 days
#5

Isolation Transformer

50KVA or better 3 Phase K 13 Isolation Transformer

4 nos Delivery: 180 days
#6

Static transfer Switch

Static transfer Switch as per Tech Specs

2 nos Delivery: 180 days
#7

SPD at Input

Surge Protection Device at Input of UPS

4 nos Delivery: 180 days
#8

SPD at Output

Surge Protection Device at Output of UPS

4 nos Delivery: 180 days
#9

4 Core Power Cable

4 Core Power Cable with each core of 35 sq mm as per Technical Specs

100 mtr Delivery: 180 days
#10

MCCB 100A

4 Pole MCCB rating 100A with individual DB boxes for UPS input

8 nos Delivery: 180 days
#11

MCCB 63A with D boxes

MCB power distribution panel with 4 Pole MCB 63A with DB boxes

2 nos Delivery: 180 days
#12

CAT 6 Network copper cable

CAT6 Network copper cable 04 pair 23 gauge or better for monitoring of UPS in which One Bundle of 305 Mtr approx

1 bundle Delivery: 180 days
#13

PVC Conduit

PVC conduit pipe 1.6 mm thickness or better and 32 mm diameter or better with Tee and jointer as per Technical Specs

100 mtr Delivery: 180 days
#14

Cable Tray

As per Technical Specs

100 mtr Delivery: 180 days
#15

Installation Testing and Commissioning

Including Complete Wiring i.e wiring of all UPS i.e from Input DB to UPS and UPS to Output DB and Output DB to termination DB i.e at the Input of Equipments including all required accessories

1 work Delivery: 180 days
#16

CAMC 1st Year

CAMC of 1st year at the rate of 3.0 percent of SITC Cost

1 work Delivery: 365 days
#17

CAMC 2nd Year

CAMC of 2nd year at the rate of 3.5 percent of SITC Cost

1 work Delivery: 365 days
#18

CAMC 3rd Year

CAMC of 3rd year at the rate of 4.0 percent of SITC Cost

1 work Delivery: 365 days
#19

CAMC 4th Year

CAMC of 4th year at the rate of 4.5 percent of SITC Cost

1 work Delivery: 365 days
#20

CAMC 5th Year

CAMC of 5th year at the rate of 5.0 percent of SITC Cost

1 work Delivery: 365 days
#21

CAMC 6th Year

CAMC of 6th year at the rate of 5.5 percent of SITC Cost

1 work Delivery: 365 days
#22

CAMC 7th Year

CAMC of 7th year at the rate of 6.0 percent of SITC Cost

1 work Delivery: 365 days
#23

CAMC 8th Year

CAMC of 8th year at the rate of 6.5 percent of SITC Cost

1 work Delivery: 365 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Similar Tenders

5 found
Urgent

9U RACK,2KVA UPS WITH RACK AND 06 NOS 18 AH BATTERY WITH EACH SET 30 MIN BACKUP,2 PORT IO BOX,EARTH

Indian Navy

📍 KHORDHA, ODISHA

EMD: ₹84,134
Est: ₹23.3 L
⏰ Deadline: 7 days left
🛒 Type: Goods
View GEM
Urgent

4 MP camera,NVR,HDD,Display,24 port PoE Switch,9U Rack,6U Rack,6 Port LIU,SC-LC patch cord,Cat6 Cab

Indian Army

📍 KANCHIPURAM, TAMIL NADU

EMD: ₹30,466
Est: ₹15.2 L
⏰ Deadline: 4 days left
🛒 Type: Goods
View GEM
Urgent

Bullet CCTV Camera,Dome CCTV Camera,08 CH NVR,16 CH NVR,HDD 08 TB,HDD 12 TB,Cat -6 cable,POE Switch

Indian Air Force

📍 SIRSA, HARYANA

EMD: ₹85,000
⏰ Deadline: 4 days left
🛒 Type: Goods
View GEM
Urgent

PVC Conduit 20 mm,PVC Conduit 25mm,PVC Box,GI Box 1 or 2 module,24 port distribution switcgh L3,48

N/a

📍 RANCHI, JHARKHAND

EMD: ₹2.0 L
Est: ₹2.0 Cr
⏰ Deadline: 4 days left
🛒 Type: Goods
View GEM
Urgent

UPS Battery,UPS 1 KVA,Ram 16GB DDR 4,Mother Board,Cable Head,Logic Card

Indian Army

📍 WEST KAMENG, ARUNACHAL PRADESH

⏰ Deadline: 2 days left
🛒 Type: Goods
View GEM